| 1 | Annexure-A (LABOUR CHARGES) |
| 2 | Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrode with the help of G.I. wire as per construction manual. |
| 3 | Fabrication of MS Channel angle iron etc in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESPO schedule and local approved drawing. |
| 4 | Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all types of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work |
| 5 | Fixing, tightening and nozzling of stay with pole and stay rod on required tension as per drawing/manual in 11 KV line |
| 6 | Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual. |
| 7 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work. |
| 8 | Erection of SP-55 single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual. |
| 9 | Erection of SP-55 double support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings & clamps as per RESPO manual. |
| 10 | Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8(1 cement:4 graded stone20 mm niminal size: 8 coarse sand) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, levelling as per RESPO cnstruction manual |
| 11 | Muffing of poles size 0.45x0.60 cm radius with 1:3:6(1 cement:3 coarse sand :graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement, stone and sand etc. |
| 12 | Dismantling of existing 11 KV HT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light connections etc. including rolling of conductor and cartage back from site to JE store(ACSR Weasel). |
| 13 | Painting of SP-55 pole with angle and channel and all steel part by one coat of Red Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. From ground level. |
| 14 | Making of section pole for existing LT/HT/33KV line complete in all respect. |
| 15 | Cartage of ST pole SP-55 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21-50 Km) |
| 16 | Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(distance 21-50 Km) |
| 17 | Headload cartage of SP-55 Pole from road to site (distance 0-1 Km) |
| 18 | Headload cartage of small material(distance 0-1 Km) |
| 19 | Straightning of Tilted STP Poles as per direction of Engineer in charge. |
| 20 | Tightening of Stay Set. |
| 21 | Fixing of IPC with AL. Bail for Earthing. |
| 22 | Fixing of 11 KV 90KN Tension Clamp B&IPC |
| 23 | Fixing of 11 KV Suspension Ties. |
| 24 | Fixing of 11 KV IPC for CC to CC Conductor. |
| 25 | Fixing of 11 KV IPC for CC to Bare Conductor. |
| 26 | Fixing of 11 KV Mid Span Jointing Kit. |
| 27 | Opening of 11 KV Jumper and Making again of section pole. |
| 28 | Laying Spreading & Sagging of Covered Conductor for 11 KV. |
| 29 | Back Carriage of Scrap Material. |
| 30 | Lopping and chopping of tree branches near HT/LT line. |
| 31 | Annexure-B (SUPPLY ITEMS)(As per UPCL Norms) |
| 32 | Supply of Nut & Bolt off size. |
| 33 | Supply of Earth wire clamp with N&B |
| 34 | Supply of Holding clamp for SP-55 with N/B |
| 35 | Supply of stay clamp off size. |
| 36 | Supply of 11 KV Sus. Ties/Cable Ties for Pin Insulator |
| 37 | Supply of 11 KV IPC for Covered to Covered Conductor. |
| 38 | Supply of 11 KV IPC for Covered to Bare Conductor. |
| 39 | Supply of 11 KV mid span Jointing Kit |
| 40 | Supply of IPC with Al. BAIL for Earthing 11 KV |
| 41 | Supply of 11 KV ACS/AAAC AL-59, 99 Sq.mm. Covered Conductor. |
| 42 | Supply of 11 KV Tension Clamp with BAIL & IPC Please Enable Macros to View BoQ information |