| 1 | Total amount of the \\"Rate Schedule\\" sheet SCHEDULE OF QUANTITY AND RATE FOR CONSTRUCTION OF 11 KV LINE AND INSTALLATION OF TRANSFORMERS FOR PROVIDING ELECTRIC CONNECTION TO MDDA DHAULAS HOUSING SCHEME UNDER EDSD, MOHANPUR UNDER EDD, MOHANPUR AGAINST E-TENDER SPECIFICATION NO.33/EDCRDDUN/2026-27 Name of The Bidder's Firm: 0.0 Sl. No. Description of Work Unit Qty Rate Amount Part [A] (Supply Portion) |
| 2 | Transformer 11/0.4 KV 630 KVA |
| 3 | Transformer 11/0.4 KV 1000 KVA |
| 4 | Earth Wire Clamp for SP-55 with N&B |
| 5 | PP & Clamp for ST Pole Sp-55 with N&B |
| 6 | Stay Clamp for SP-55 with Nut & Bolt |
| 7 | Stay Insulator 75x90 mm. |
| 8 | Bolt & Nuts off size |
| 9 | 57mm Double Compression Al. LT Glands |
| 10 | G.I. Pipe 6 Inch |
| 11 | 11 KV AAAC AL-59, 70 sqmm. Covered Conductor |
| 12 | 11 KV H/S Jointing Kit 120 sqmm. (I/D) |
| 13 | 11 KV H/S Jointing Kit 120 sqmm. (O/D) |
| 14 | Air Circuit Breaker type complete LT Distribution board for 630/1000 KVA DTR 1000/1600 Amp CT including microprocessor release Fixed type (4 Pole as per IS: 13947-2 & IEC: 60947-2) with panel and mounting structure as per specification |
| 15 | Aluminium Crimping Type Lugs 70 sqmm. |
| 16 | Aluminium Lugs 120 Sqmm. |
| 17 | GI Strip Size 35x6 mm. Total - Part [A] 0.0 Part [B] (Labour Portion) |
| 18 | Cartage of ST pole from store centre to construction site with loading, unloading at both points and oroper stacking. (21-50 Km.) SP-55 Nos 6.0 0.0 |
| 19 | Cartage of other material (other than poles) by vehicle fro Store Center to nearest construction site Store including loading and unloading at both ends. (0-20 Km.) Rs. Per Qtl. Qtl 28.5 0.0 |
| 20 | Head load cartage of following Poles from road to site Upto 1 to 3 Km. SP-55 Nos 6.0 0.0 |
| 21 | Head load cartage of Small material. Rates are per Km/Quintal including loading and Unloading. Upto 0 to 1 Km. Qtl 28.5 0.0 |
| 22 | Head load cartage/ mannual shifting / lifting with crane/hydra of the following transformers along with loading/Unloading at both points. Upto 0 to 1 Km. 630 KVA Nos 1.0 0.0 1000 KVA Nos 2.0 0.0 |
| 23 | Chemical Earthing:Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor as per drawing No. A) as drawing B, connecting the same with G.I. Strip (to be supplied by contractor ) of size 35x6 mm as per drawing C for a minimum lenght 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm. |
| 24 | Earthing with M.S. Earth rod of 2.5 meter long by hammering of M.S. Rod to proper depth and connecting the earth electrode with the help of G.I. wire as per construction manual. |
| 25 | Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESPO sehedule and local approved drawing. |
| 26 | Fixing of G.I. Pipe |
| 27 | Excavation of earth for stay pit of size 0.06x0.06x1/2 mtr. in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work |
| 28 | Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO Manual. |
| 29 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work |
| 30 | Erection of following Double support pole in proper level and alignment alongwith fixing of all accessories, like top channel, X-bracing & clamps as per RESPO construction Manual. SP-55 Nos 3.0 0.0 |
| 31 | Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction Manual. |
| 32 | Muffing of poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc. |
| 33 | Installation / mounting of new Tranformer on plinth pole structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning. On Plinth 630 KVA Nos 1.0 0.0 1000 KVA Nos 2.0 0.0 |
| 34 | Mounting & Fixing of TPMO on double pole structures including making of connections complete work |
| 35 | Mounting & Fixing of Fuse sets on double pole structures including making of connections complete work |
| 36 | Mounting and Fixing of Lightning arrestor set (3 Nos.) on double pole structure including making all connections by G.l. strip size 35x6 mm to earth point complete work (excluding cost of G.t.Strip) |
| 37 | Fixing & Installation of LT Fuse set |
| 38 | Making of section pole for existing LT/HT/33KV line complete in all respect. |
| 39 | Jointing and Fixing of cable Jointing Kits indoor /outdoor cable boxes. 11 KV XLPE Heat Shrinkable Nos 12.0 0.0 |
| 40 | Installation of LT ACB Pannel complete in all respect i.e. disconnection of existing cable from DTR terminal and metering cubicals, fixing of new additional cable in ACB LT Distribution board connecting DTR metering complete, testing and commissioning of ACB connection using all lugs of proper size lugs will be provided by supplier as per required on site and narrated by engineer in change of work. |
| 41 | Service of Hydra Machine |
| 42 | Fixing , tightening and nozzling of Stay with pole and stay rod on required tension as per drawing / RESPO manual. 11 KV line Nos 6.0 0.0 |
| 43 | Painting of Double pole Structure ST Pole SP-55 |
| 44 | Erection, providing and fixing of wire mesh of size 50x35 mm around plinth and toe wall duly welded with frame of M.S. angle iron 35x35x6 mm and strip of size 35x6 mm in the mid of each side along with wire mesh (width of wire mesh 1.5 meters ) with the height of 0.5 meters above the plinth and 2 meter above the toe wall with 1 No. gate and locking arrangement in the toe wall size including grouting of 6 Nos. legs in the ratio in block of size 0.25x0.25x0.45 meter including gravelling of shingle of size 20 to 40 mm and complete painting of wire mesh with aluminium paint with two coat (Including the cost of cement and all material) |
| 45 | Jumpering of D/P TPMO, Fuse set & Transformer |
| 46 | Fixing of Channel, Angle on Pole |
| 47 | Laying, Spreading, Stringing of AAAC Covered Conductor |
| 48 | Installation & Fixing of Chemical Earthing |
| 49 | Construction of Transformer Plinth with size 2x2x1.1 meter above ground level and 0.6 meter below ground level including the cost of material such as cement, brick, ballast, sand etc. complete work as RESPO norms. |
| 50 | Fixing of accessories on Double Pole SP-55 |
| 51 | Hi-Pot Test 11KV of Cable & Busbar of Transformer |
| 52 | Hi-Pot test of LT Cable & Busbar of Transformer |
| 53 | Installation of 95 Sqmm. LT Glands |
| 54 | Errection & Laying of 11 KV Cable 3x120 sqmm. Total - Part [B] 0.0 TOTAL [Part-(A) + Part (B)] 0.0 Place Date Superintending Engineer Please Enable Macros to View BoQ information |