| 1 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches. |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. |
| 3 | Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors. |
| 4 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size). |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) |
| 6 | R.C.C. Beam |
| 7 | R.C.C. Column |
| 8 | R.C.C. raft footing |
| 9 | R.C.C. in slabe |
| 10 | TMT Fe-500 or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. |
| 11 | M-150 brick work in 1:4 (one cement and four coarse sand sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work. |
| 12 | Brick work M-150 in super-structure above plinth level up to floor two level (up to two storeys) including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall. 1:4 (one cement : four coarse sand) |
| 13 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-20 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) : 300 mm dia piles |
| 14 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class 150 in foundations and plinth in : cement mortar 1:4 (1 cement : 4 coarse sand) |
| 15 | 12mm cement plaster in single coat on fair side of single or half brick wall for exterior plastering up to floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80mm in girth and finished even and smooth no extra for mixing any additive. (1)1 cement : 6 Coarse sand. 2.25 F.M. |
| 16 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) |
| 17 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 18 | 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. |
| 19 | Supply, Febrication and Installation of verticle and horizontal members made of MATERIAL – 50 SQMM MS pipe and its joinery JOINERY – ON GIVEN GI anchor plate and anchor bolt FROM CLIENT SIDE.Rate including all labour and materials both. |
| 20 | mm thick Non - Asbestos multi purpose fibre cement board Type-B, Category-lll as per IS: 14862:2000 |
| 21 | Providing and fixing glass strips in joints of terrazo/ cement concrete floors. |
| 22 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : |
| 23 | Foundations, footings, bases of columns, etc. for mass concrete. |
| 24 | Columns,Pillars, Piers, Abutments, Posts and Struts. |
| 25 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. |
| 26 | INTERNAL PLUMBING WORKS |
| 27 | Providing and fixing on wall face unplasticised-Rigid PVC rain water pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS: 5382 leaving 10mm gap for thermal expansion. |
| 28 | 110 mm |
| 29 | Providing and fixing on wall face unplasticised PVC moulded fittings/accessories for unplasticised Rigid PVC rain water pipes conforming to IS:13592 Type A including jointing with seal ring conforming to IS:5382 leaving 10mm gap for thermal expansion. |
| 30 | Bend 87.5 degree |
| 31 | 110 mm Bend |
| 32 | Shoe (Plain) |
| 33 | 110 mm Shoe |
| 34 | Providing and fixing to the inlet mouth of rain water pipe cast iron grating 15 cm diameter and weighing not less than 440 grams. |
| 35 | Providing and fixing unplasticised-PVC pipe clips of approved design to unplasticised-PVC rain water pipes by means of 50x50x50 mm hard wood plugs, screwed with MS screws of required length including cutting brick work and fixing in cement mortar 1:4 (1 cement : 4 coarse sand) and making good the wall etc. complete. |
| 36 | 110 mm |
| 37 | Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of 20 mm nominal size) over PVC sheet 1m x 1 m x 400 micron, finished with 12 mm cement plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat cement,punning,rounding the edges and making and finishing the outlet complete. |
| 38 | 3.60 Mt. WIDE X 2.00 M C.C. INTERLOCKING ROAD |
| 39 | (For 2.0 M LENGTH) |
| 40 | Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 50 meter and including filling, watering and ramming of excavated earthdisposal of sur-plus earth as directed by the Engineer incharge up to a distance of 50 meters from the foundation trenches. (2.6.1) |
| 41 | Providing and laying in cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded Stone aggregate 40 mm nominal size) and curing complete, including cost of form-work, infoundation and floors. (4.1.8) |
| 42 | M-150 brick work in 1:4 (one cement and four coarse sand sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work. |
| 43 | Filing of carted earth (2.25a) |
| 44 | Providing and laying of 80mm thick interlocking cement concrete tiles (30 Mpa) including levelling and dressing of suface to required level and slope, filling joints with local sand including the cost of labour, Material and T & P etc. required for proper complition of work as directed byEngineer-in-charge. |
| 45 | CH.-20, ITEM NO.-8 |
| 46 | SUBMERSIBLE PUMP (90 M. DEPTH) |
| 47 | Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level. |
| 48 | 300 mm dia |
| 49 | Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required hire and labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer -in-charge. |
| 50 | 100 mm nominal size dia |
| 51 | Supplying, assembling, lowering and fixing in vertical position in bore well unplasticized PVC medium well screen (RMS) pipes with ribs, conforming to IS: 12818, including hire & labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer-in-charge. |
| 52 | 100 mm nominal size dia |
| 53 | Gravel packing in tubewell construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer-in-charge. |
| 54 | (0.785*0.4*0.4*90)-(0.785*0.2*0.2*90)=8.478 CUM |
| 55 | Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit) |
| 56 | with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. |
| 57 | Providing and fixing suitable size threaded mild steel cap or spot welded plate to the top of bore well housing/ casing pipe, removable as per requirement, all complete for borewell of : 100 mm dia |
| 58 | Providing and fixing M.S. clamp of required dia to the top of casing/ housing pipe of tubewell as per IS: 2800 (part I), including necessary bolts & nuts of required size complete. 100 mm clamp. |
| 59 | Providing and fixing Bail plug/ Bottom plug of required dia to the bottom of pipe assembly of tubewell as per IS:2800 (part I). 100 mm dia. |
| 60 | Supply of submersible pump of make KSB 2.0 HP with control panel, support wire etc. complete. |
| 61 | Providing 2 core PVC insulated submersible cable from pump panel to submersible pump |
| 62 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. 32 mm dia nominal bore |
| 63 | Providing and fixing gun metal gate valve with C.I. wheel of approvedquality (screwed end) |
| 64 | Supply of 100mm dia Johnson screen. |
| 65 | WOOD SHED |
| 66 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches. |
| 67 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. |
| 68 | Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors. |
| 69 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size). |
| 70 | Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) |
| 71 | R.C.C. Beam |
| 72 | TMT Fe-500 or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. |
| 73 | M-150 brick work in 1:4 (one cement and four coarse sand sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work. |
| 74 | Brick work M-150 in super-structure above plinth level up to floor two level (up to two storeys) including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall. 1:4 (one cement : four coarse sand) |
| 75 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class 150 in foundations and plinth in : cement mortar 1:4 (1 cement : 4 coarse sand) |
| 76 | 12mm cement plaster in single coat on fair side of single or half brick wall for exterior plastering up to floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80mm in girth and finished even and smooth no extra for mixing any additive. (1)1 cement : 6 Coarse sand. 2.25 F.M. |
| 77 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) |
| 78 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 79 | 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. |
| 80 | Supply, Febrication and Installation of verticle and horizontal members made of MATERIAL – 50 SQMM MS pipe and its joinery JOINERY – ON GIVEN GI anchor plate and anchor bolt FROM CLIENT SIDE.Rate including all labour and materials both. |
| 81 | mm thick Non - Asbestos multi purpose fibre cement board Type-B, Category-lll as per IS: 14862:2000 |
| 82 | Providing and fixing glass strips in joints of terrazo/ cement concrete floors. |
| 83 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : |
| 84 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. |
| 85 | GST extra as per applicable Please Enable Macros to View BoQ information |