| 1 | Excavation in foundation in ordinary soil including lift upto 1.5 meter (5ft) and lead upto 30m (100ft) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m (100ft) from the foundation trenches. |
| 2 | Providing and laying P.C.C in 1:4:8 with Cement, course Sand and 40mm Stone Ballast including supply of all material, labour and T&P etc. required for proper completion of the work in foundation and floors. |
| 3 | Providing and laying C.C in 1:3:6 with Cement, course Sand and 10-20 mm Stone Ballast including supply of all material, labour and T&P etc. required for proper completion of the work in foundation and floors. |
| 4 | First class brick work in 1:4 with cement and Course sand of 1.25FM mortar in foundation and plinth including supply of All Materials labour and T&P etc. required for proper completion of the work. |
| 5 | Providing and laying C.C in 1:2:4 with Cement, course Sand and 10-20 mm Stone Ballast including supply of all material, labour and T&P etc. required for proper completion of the work in foundation and floors. |
| 6 | 12mm thick cement Plaster in 1:4 With (1 Cement:4 Coarse sand) mortar up to 10M hight from GL. |
| 7 | 15mm thick cement Plaster in 1:3 With Cement amd Coarse sand up to 10M hight |
| 8 | Neet Cement Punningh on Roof As per DSR SP No.13.18 |
| 9 | RCC work in 1:2:4 with cement, approved coarse sand and 20mm gauge approved granite grit. and also including supply of materials, labour, T&P etc. required for proper completion of work. |
| 10 | Supply of 10- 12 mm twisted M.S. Bar for item no.- 9 |
| 11 | Laying of 150mm dia 4kgf/cm² PVC Pipe. |
| 12 | Laying and fitting of 110mm dia 4kgf/cm² PVC Pipe. |
| 13 | 110mm dia PVC bend. |
| 14 | 110mm PVC End cap |
| 15 | 110 mm dia Iron Clip. |
| 16 | Fastner. |
| 17 | Solvent cement. |
| 18 | Supply and filling of 40mm size stone ballast. |
| 19 | Supply and filling of 10-20mm size stone gritt. |
| 20 | Supply and filling of Course sand. |
| 21 | 110mm dia PVC Pipe Complet boring work of 30 M. depth in Recharge pit. |
| 22 | Nylone Mesh |
| 23 | Disposel of surplus excavated earth. |
| 24 | Dismantling Cement Concrete or brick floor including base concrete stacking of dismented materials. |
| 25 | Fitting of PVC Pipe and all plumbing work. |
| 26 | Wall writing and wall Painting. |
| 27 | Complete gate Valve for first rain water flush drain out. Please Enable Macros to View BoQ information |