| 1 | fo|qr forj.k [k.M dqyigkM+ egksck ds vUrZxr iw.kZ tek ;kstuk 2026&27 ds vUrxZr Hkfo”; esa >ViV@fuos’k fe= iksVZy ds ek/;e ls vkosnu djus okys miHkksDrkvksa tSls& is;ty] vkS|ksfxd dk;Z] izkFkfed@mPp izkFkfed fo|ky;ksa] xzke iapk;rks o vU; esa fofHkUu fo|qr la;kstu fuxZr djus gsrq 11 dsoh@,y-Vh- ykbuksa dk fuekZ.k djkus ds dk;Z as per RESSPO Erection of Drawings/Estimate and as per direction of Engineer Incharge. Work includes all cartage/carriage, cost of labour,T&P, fitting and fixing of material, commissioning and any other work which is required for completion of work. | fo|qr forj.k [k.M dqyigkM+ egksck ds vUrZxr iw.kZ tek ;kstuk 2026&27 ds vUrxZr Hkfo”; esa >ViV@fuos’k fe= iksVZy ds ek/;e ls vkosnu djus okys miHkksDrkvksa tSls& is;ty] vkS|ksfxd dk;Z] izkFkfed@mPp izkFkfed fo|ky;ksa] xzke iapk;rks o vU; esa fofHkUu fo|qr la;kstu fuxZr djus gsrq 11 dsoh@,y-Vh- ykbuksa dk fuekZ.k djkus ds dk;Z as per RESSPO Erection of Drawings/Estimate and as per direction of Engineer Incharge. Work includes all cartage/carriage, cost of labour,T&P, fitting and fixing of material, commissioning and any other work which is required for completion of work. |
| 2 | PCC Pole / STP Pole (8.5mtr/9mtr/11mtr/13mtr) | PCC Pole / STP Pole (8.5mtr/9mtr/11mtr/13mtr) |
| 3 | Cartage of line Material Viz. Weasl conductor, GI Wire Cross Arm, Earthing, ABC Cable, 11 KV XLPE Cable, Stay etc. | Cartage of line Material Viz. Weasl conductor, GI Wire Cross Arm, Earthing, ABC Cable, 11 KV XLPE Cable, Stay etc. |
| 4 | Erection of PCC Pole/ STP Pole | Erection of PCC Pole/ STP Pole |
| 5 | Erection of Double/Section Double on PCC Pole/STP Pole. | Erection of Double/Section Double on PCC Pole/STP Pole. |
| 6 | fitting & fixing of PCC/STP Pole with line material. | fitting & fixing of PCC/STP Pole with line material. |
| 7 | Laying and sagging of ACSR of Weasl conductor as per site requirement. | Laying and sagging of ACSR of Weasl conductor as per site requirement. |
| 8 | Laying and sagging of ABC Cable. | Laying and sagging of ABC Cable. |
| 9 | Laying and sagging of XLPE Cable Size 70/120/185 including with all material. | Laying and sagging of XLPE Cable Size 70/120/185 including with all material. |
| 10 | Filling of jointing kit Indoor/Outdoor Type. | Filling of jointing kit Indoor/Outdoor Type. |
| 11 | Cartage & Erection of 10/16 KVA single phase transformer in double pole with loading and unloading | Cartage & Erection of 10/16 KVA single phase transformer in double pole with loading and unloading |
| 12 | Cartage & Erection of 25 KVA transformer in double pole with loading and unloading. | Cartage & Erection of 25 KVA transformer in double pole with loading and unloading. |
| 13 | Cartage & Erection of 63 KVA transformer in double pole with loading and unloading. | Cartage & Erection of 63 KVA transformer in double pole with loading and unloading. |
| 14 | Cartage & Erection of 100 KVA transformer in double pole with loading and unloading. | Cartage & Erection of 100 KVA transformer in double pole with loading and unloading. |
| 15 | Cartage & Erection of 250 KVA transformer in double pole with loading and unloading. | Cartage & Erection of 250 KVA transformer in double pole with loading and unloading. |
| 16 | Cartage & Erection of 400 KVA transformer in double pole with loading and unloading. | Cartage & Erection of 400 KVA transformer in double pole with loading and unloading. |
| 17 | Contruction of Plinth Making as per respo nones 250/400 kva T/F | Contruction of Plinth Making as per respo nones 250/400 kva T/F |
| 18 | Installation of Fencing 250/400 kva T/F as per instruction site incharge | Installation of Fencing 250/400 kva T/F as per instruction site incharge |
| 19 | Loading and unloading with erection of CT/PT unit as per required. | Loading and unloading with erection of CT/PT unit as per required. |
| 20 | Loading and unloading with erection of pillfer unit as per required. | Loading and unloading with erection of pillfer unit as per required. |
| 21 | Guarding of 11 KV line works as per respo norms. | Guarding of 11 KV line works as per respo norms. |
| 22 | Erection of stay at digging fo pit including the cost of grouting with cement, sand and brick ballast/stone in ratio 1:4:8 including the cost as per respo norms. Nozeling & bindeing stay set, stay | Erection of stay at digging fo pit including the cost of grouting with cement, sand and brick ballast/stone in ratio 1:4:8 including the cost as per respo norms. Nozeling & bindeing stay set, stay |
| 23 | Earthig Complete | Earthig Complete |
| 24 | Fabrication of Hole Channel/Angle/Cross arm. | Fabrication of Hole Channel/Angle/Cross arm. |
| 25 | Supply and Erection Nut & Bolt. | Supply and Erection Nut & Bolt. |
| 26 | Cutting of Tree Branching | Cutting of Tree Branching |
| 27 | Concreting of Pole | Concreting of Pole |
| 28 | Used and Scrap Maiterial with Cartage with Loading and unloading site to JE Store/ESC Mahoba | Used and Scrap Maiterial with Cartage with Loading and unloading site to JE Store/ESC Mahoba |
| 29 | Erection of distribution box on single pole including with ABC Cable. | Erection of distribution box on single pole including with ABC Cable. |
| 30 | Note: Any quantity of item from sl no. 1 to sl no. 1.28 may vary to any limit within the financial value of agreement against this tender. | Note: Any quantity of item from sl no. 1 to sl no. 1.28 may vary to any limit within the financial value of agreement against this tender. |