| 1 | DETAILED ESTIMATE |
| 2 | OD23801/2025-2026:Removing the blocked materials from the sullage water drain around the building and depositing the dirty matters to a safe distant place. within a distance of 150 M etc, complete, including cleaning the drain uprooting the vegetation and all labour charges etc. complete, as per the direction of departmental officers at site. |
| 3 | OD23794/2025-2026:Removing RCC covering slab of Manhole and bailing out water by bucket, removing all the dirty matters and depositing in trench near the manhole filling with water and testing the lines and replace the covering slab etc.complete |
| 4 | OD23799/2025-2026:Engaging sewer man labour for cleaning Septic tank /Drainage similar miscellaneous works etc |
| 5 | OD23800/2025-2026:Supplying and fixing 200 mm dia PVC rain water (6 kf/cm2) gutter semi circular section including with 32x5 mm MS flat supporting at1 m interval |
| 6 | 50.14.1.1:Removing and refixing door shutters after necessary repairs for easy opening and closing etc complete as per the direction of site Engineer-in-charge. |
| 7 | OD23798/2025-2026:Repairing the existing wash hand basin by replacing the damaged pillar tap pillar cock, PVC connection etc. and testing the water flow, cleaning the basin etc. complete including all cost and conveyance of all materials, all labour charges etc. complete as per the direction of departmental officers at site. |
| 8 | 50.18.9.13.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 25 mm dia 10 Kgf/cm2- External work - Exposed on wall |
| 9 | 50.18.9.14.1:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 32 mm dia 10 Kgf/cm2 - External work- Exposed on wall |
| 10 | 50.18.9.15.1:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 40 mm dia 10Kgf/cm2- External work- Exposed on wall |
| 11 | 50.18.9.19.1:Providing and fixing PVC pipes including fixing the pipe with clamps/ clips/ at 1.00 m spacing . This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 110 mm dia 6 Kgf/cm2 - External work- Exposed on wall |
| 12 | OD23797/2025-2026:Supplying and fixing PVC ball valve of approve quality, 40 mm nominal bore |
| 13 | 50.18.9.22.1:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 110 mm dia Elbow |
| 14 | 50.18.9.22.4:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement- 110 mm dia Bend |
| 15 | 18.51.1:Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 gms.15 mm nominal bore |
| 16 | 18.54.3:Providing and fixing PTMT bib cock of approved quality and colour.15 mm nominal bore, 165 mm long, weighing not less than 110 gms |
| 17 | OD23795/2025-2026:Engaging labour for miscellaneous plumbing works as per the direction of Engineer in charge. |
| 18 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. |
| 19 | 14.15.1:Renewing wooden battens in roofs, including making good the holes in wall and painting with oil type wood preservative of approved brand and manufacture complete, including removal of rubbish to the dumping ground, all complete asper direction of Engineer-in-Charge.Sal wood battens |
| 20 | OD23802/2025-2026:Engaging labour for Carpentry works |
| 21 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved |
| 22 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 23 | 16.18.1:Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire Please Enable Macros to View BoQ information |