| 1 | item no. 1.10 is SOR and 1.11 to 1.26 is DSR item |
| 2 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. |
| 3 | construction of embankment with material obtained from borrow pits with a lift upto 1.5 mtr,transporting to site,spreading,grading to required slope and compacting to meet requirement of table 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 (Earth filling on road). |
| 4 | Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. |
| 5 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportionn Nominal mix 1:3:6 foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work.(Based on PWD specifications) |
| 6 | Brick masonary work in cement mortar in foundation complete excluding pointing and plastering as per Drawing and technical specification Clauses 600, 1202 & 1203 Brick masonary in 1:4 |
| 7 | Plastering with cement mortar (1:4) 15 mm thick on Brick work in substructure as per technical specification. |
| 8 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4) |
| 9 | Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202. (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS 1786:2008 clause no. 1.6) |
| 10 | Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 |
| 11 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C grade M 25 |
| 12 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. |
| 13 | Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. |
| 14 | Construction of granular sub-base by providing close graded Materialconforming to specifications, mixing in amechanical mix plant at OMC,carriage of mixed material by tippers to worksite, for all leads & lifts,spreading in uniform layers of specifiedthickness with motor grader onprepared surface and compacting withvibratory power roller to achieve thedesired density, complete as per specificationsand directions of Engineerin-Charge. |
| 15 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 16 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1.5:3 (1 Cement:1.5 Coarse Sand: 3 Graded Stone Aggregate 20 mm nominal size). |
| 17 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). |
| 18 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete |
| 19 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Columns, Pillars, Piers, Abutments, Posts and Struts |
| 20 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 21 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 22 | 12 mm cement plaster of mix 1:6 (1 cement : 6 fine sand) |
| 23 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C grade M 25 |
| 24 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars |
| 25 | Providing and laying Non Pressure NP3 class ( Medium duty) RCC pipes |
| 26 | Providing and laying at or Near ground level factory made kerb stone of M25 grade cement concrete in postion to the |
| 27 | Provding and laying factory made chamfered adge cement conctete paver blocks in footpath parks lawns drive Please Enable Macros to View BoQ information |