|
| 1 | Demolition of RCC Roofs, floors (other than ground floors), beams, staircases, landing,chajjas and similar suspended work complete all as specified and directed |
| 2 | Removing building materials etc. (other than spoil payable under items 03028 to 03031 in Section-3—Earthwork) to a distance of 100m or under, beyond the lead included in the rates, including loading, unloading and stacking at the destination complete all as specified and directed |
| 3 | (A) RCC TANK STAGE I UPTO 7.5 Mtrs |
| 4 | Excavating in trenchs not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth and not exc 10 Sqm on plan in soft/disitegrated rock and getting out complete all as specified and directed. |
| 5 | Excavating in trenchs exceeding 1.5 metre wide and not exceeding 3 metre in depth and not exc 10 Sqm on plan in soft disintegated rock and getting out complete all as specified and directed. |
| 6 | Returning filling in including spreading ,levelling , watering and well ramming in layer not exceeding 25 cm thick for soft/disitegrated rock as specified and directed. |
| 7 | Removing excavated material n. exc.50 m and depositing where directed at a level n. exc. 1.5 m above the starting point in soft disintigrated rocks as specified and directed. |
| 8 | M&L for PCC type D-2 (1:4:8) using 40mm graded stone aggregates as in foundation complete all as specified and directed. |
| 9 | M&L Formwork to sides and soffits of floor or roof beams, beam haunchings, girders, bressummers, lintels, cantilevers, shelvesincluding sup- ports, overhangs, etc. also splays between floors and beams, etc.as specified and directed. |
| 10 | M&L for Mild steel bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed. |
| 11 | RCC M-30 (using 20mm graded stone agg) Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified. |
| 12 | S & F Hand rails, half round or other steel section or core for wooden hand-rail straight portion, drilled and countersunk for balusters running bars, for doors, balusters, nosing to steps including embeding in concrete and screwing etc. wind ties for roof including securing bolts complete all as specified and directed. |
| 13 | M & L 15mm thick cement plastering in cement mortar 1:4 finished even smooth and fair on fair faces of brick walls (without using extra cement)complete all as specified and directed. |
| 14 | M&L for preparation of newly plastered surfaces Material & Labour for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance,dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces. as directed by engr in charge |
| 15 | M&L Surfaces of any description, over 10cm in width or girth,not therwise described Paint over one coat of primer and two coat of synthetic enamal paint complete all as specified and directed. |
| 16 | (B) RCC TANK STAGE II ABOVE 7.5 Mtrs |
| 17 | M&L Formwork to sides and soffits of floor or roof beams, beam haunchings, girders, bressummers, lintels, cantilevers, shelvesincluding sup- ports, overhangs, etc. also splays between floors and beams, etc.as specified and directed. |
| 18 | M&L for Mild steel bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed. |
| 19 | M&L for RCC M-30 (using 20mm graded stone agg) for slabs supported on walls, beam and columns in floors, roofs landings, balconies,canopies, deck slabs and in shelves complete all as specified and directed. |
| 20 | S & F Hand rails, half round or other steel section or core for wooden hand-rail straight portion, drilled and countersunk for balusters running bars, for doors, balusters, nosing to steps including embeding in concrete and screwing etc. wind ties for roof including securing bolts complete all as specified and directed. |
| 21 | M & L 15mm thick cement plastering in cement mortar 1:4 finished even smooth and fair on fair faces of brick walls (without using extra cement) complete all as specified and directed. |
| 22 | M&L for preparation of newly plastered surfaces Material & Labour for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance,dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces. as directed by engr in charge |
| 23 | M&L Surfaces of any description, over 10cm in width or girth,not therwise described Paint over one coat of primer and two coat of synthetic enamal paint complete all as specified and directed. |
| 24 | Note for Sl Item No. 3 to 21 above :(i) Draft design drawing for OHT staging (provided by Syntex) is attached in Sl page No. 157 and 158 of tender.The contractor shall be liable to get the design checked and redesigned, if needed. The design for Staging of OH Tank shall be got vetted by IIT/ NIT and the Rates quoted for Sl item No. 3 to 21 above are inclusive of this . (ii) No specifications in the draft design shall be degraded by the Contractor. However specfications can be upgraded as per the Contracotr's design vetted by IIT/NIT.(iii) Necessory soil investigation report shall be obtained from GE (P) Navy Mandovi. Please Enable Macros to View BoQ information |
| 25 | Note for Sl Item No. 3 to 21 above :(i) Draft design drawing for OHT staging (provided by Syntex) is attached in Sl page No. 157 and 158 of tender.The contractor shall be liable to get the design checked and redesigned, if needed. The design for Staging of OH Tank shall be got vetted by IIT/ NIT and the Rates quoted for Sl item No. 3 to 21 above are inclusive of this . (ii) No specifications in the draft design shall be degraded by the Contractor. However specfications can be upgraded as per the Contracotr's design vetted by IIT/NIT.(iii) Necessory soil investigation report shall be obtained from GE (P) Navy Mandovi. Please Enable Macros to View BoQ information |