| 1 | Cutting heary under growth and bushes including removal of roots with collection and removal complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 2 | Excavation in granite rock by blasting including cost of drilling and explosive, its removal and proper stacking.with disposal in 50 m lead and 1.5 m lift etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 3 | Earth work in Excavation for foundation in MKR and kankaer mixed soil i/c with disposal in 50 m lead and 1.5 m lift etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 4 | E/w in mar kaber Ranker and kanker Mixed soil in filling i/c lead up to 595 m & lift 1.50 m with dressing and manual compaction etc complete. As per S.O.R. No. 4.12 complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 5 | Laying of PCC (1:3:6)cement concrete with stone grit with Mechenical mixing & vibration,curing including all cost of material labour T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 6 | Laying of M-15 (1:2:4) cement concrete with stone grit with Mechenical mixing & vibration,curing including all cost of material labour T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 7 | S/L khanda stone masonary work in 1:3 C.M.I/C cost of all material labour & T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 8 | S/ Laying first class brick work in 1:4 cement morter i/c all labour T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 9 | S/Laying 12.5 mm thick 1:4 cement plaster on Brick Masonary work i/c all labour T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 10 | S/Laying mixture cowdung & good earth with all material labour T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 11 | Painting with two coat of weather extrior emulsion paint i/c all cost of labour,material and T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 12 | Providing and laying Neelgiri/Mexican grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and light waterning with sprinkler and maintenance for 30 days or more till the grass establish properly, complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 13 | Providing and laying of 80 mm Interlocking concrete Colour block pavement laid in stone dust baso and tiI joint with fine sand. Joint filled after labting and dressing base including supply of att materiat, tabour, T&p etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 14 | S/ Laying 1:2 Cement Pointing raised on stone masonary work i/c all labour T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 15 | Laying Coarse sand filling foundation of toe wall i/c all cost of material T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 16 | S/Laying of Dry stone boulder pitching work (25-50 kg) i/c cost of all material,labour,T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 17 | Dismentalling and Relaying of Dry stone boulder pitching work i/c cost of all material,labour,T&P etc ( excluding cost of boulder) complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 18 | Dustbin DOG (EF-152) (FRP material) complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 19 | Dustbin Open mouth fish (EF-153) (FRP material) complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 20 | New construction Ring Fountain with Flower Jet Fountain are a kind of entertaining medium is basically representing a flower by the outlook. The construction starts with a nozzle in the center as it convert the water flow into the fountain. In the manufacture we are incorporating highly specific metallic substances like stainless steel. Our product is offering attractive color range and long life. Ring Fountain with flower High Foam Jets Fountain completed and commissioned in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 21 | New construction of 8x8 feet Artificial waterfall Fountain (will be completed i/c cement, concrete, stone, steel, iron, sand, ballast, 6 lights, 1 motor, 4 core cable,panel box,oxide colour labour charge (as per market rate ) complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 22 | Construction work of Wooden New Artificial Tree Concrete railing 1 m. high RCC railing (by placing beam on 0.23 m wall made of cement concrete steel-iron and brick making railing in the design of balli tree will be completed including oxide color and labour charge. (as per market) completed and testing, commissioned in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 23 | Construction work of 1.5 m long and 0.50 m high RCC Sitting chair be completed including oxide color and labour charge. (as per market) complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 24 | Designing, fabricating, testing, installing and fixing in position curtain wall with Aluminium composite Panel Cladding with open grooves for linear as well as curvilinear portions of the building, for all heights and all levels etc. including (a) Structural analysis & design and preparation of Shop Drawings for pressure equalization or rain screen principal as required, proper drainage of water to make it Watertight including Checking of all structural and functional design.(b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan Shape in matlic colour of approved Shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Aluminium composite panel cladding sheet shall be coil coated, with kynar 500 based PVDF/Lumifion based fluoropolymer resin coating of approved colour and shade on Face #l polymer (Service) coating on face # 2 as specified using stainlees steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc.c. The fastening brackets of aluminium alloy 6005 T5/ MS A.C.P. work selfie Point at dhukwan I.H. campus complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 25 | Supply & Fixing of Glow and Shine sheet and the letter height 800 mm (30'') complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 26 | Supply & Fixing of LED street light having die cast aluminimum body and diffuser with driver set suitable for 15 watt to 25 watt confirming to IP 66 protection complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 27 | Multyline swing with supply and fixing proper asper direction eng. In charge EF-45 (Ht-2.5M,Ar-1.5Mx6.5M) complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 28 | Supply and fixing of decorative 8 to 16 Watt LED bollard luminaire with driver set confirming to IP 65 and above protection complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 29 | Supply and fixingof factory wired, post top lanternsame as item no. 439(I) but with3meter longaluminiumpole complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 30 | Supply and fixingof factory wired, post top lantern with clear diffuserand spun aluminiumcasted body & control gear of cast aluminiumconsisting louvers stack, P.C. base duly wired with ballast capacitor, suitable for 36 watt P.L.C.with1no. 36 watt P.L.C. lamp, complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 31 | Wiring point for exhaust fan (Havells/RR Kabel and equivalent) with 1.5 sq. mm.FRLSH PVC insulated multistrand single core copper conductor cable in heavyguage rigid steel conduit partly concealed in wall and partly laid in slab alongwith the reinforcemen tbefore concreting ,complete with 14 SWG copper earth continuity wire, 15A piano type switch & ceiling rose on 3 mm thick phenolic laminated backelite sheet etc., complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 32 | Supply and fixing of LED Tube Light (Havells/RR Kabel and equivalent) with batten suitable for up to 1 X 22 watt LED tube light complete including tube etc on surface complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 33 | Supply and fixing of power plug (Havells/RR Kabel and equivalent) with 15A/250 volt flush type switch and 5 pin 15A/250V flush type universalsocket in suitable M.S. box of 175mm x 100mm x 50mm size with phenolic laminatedbakelite sheet cover 3mm thick fixed with brass machine screw and cup washer complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 34 | Wiring point for but for plug point with 5 Amp flush typeswitch and 3 pin socket (Havells/RR Kabel and equivalent) and earth continuity wire of 1.5 sq.mm. FRLSH PVC insulated multi strand copper conductor cable. light in 1 sq. mm.FRLSH PVC insulated multistrand single core copper conductor cable (drawn through existing concealed steel conduit) and ceiling rose/angle/batten holder fixed with 3mm thick phenolic laminated backalite sheet with brass machine screws and cup washers mounted over existing M.S. switch board box/ junction box with supply of all material, labour & T&P etc.complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 35 | Wiring point for fan / fesh air fan (light duty exhaust fan) with 1 sq.mm. FRLCHLACH PVC insulated multistrand single core copper conductor cable in heavy guage rigid steel conduit concealedin the wall, complete with 14 SWG copper earth continuity wire, piano type switch & ceiling rose on 3 mm thick phenolic laminated backelite sheet etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 36 | Supply and fixing of LED Street light (Havells/RR Kabel and equivalent) Fitting having die cast aluminium body and diffuser with driver set suitable for 52 watt to 72 Watt. Confirming to IP65 and above Protection complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 37 | Add for Invertor Wiring in wiring Point for light/ Fan/ Plug with (Havells/RR Kabel and equivalent) 1.5 mm Cu Wire complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 38 | S/F of single LED light wall 3 to 6 watt (Havells/RR Kabel and equivalent) on matching M.D.F.E.G. board base complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 39 | Supply and laying of aluminium conductor PVC insulatedarmoured served sheathed cables (Havells/RR Kabel and equivalent) 1100 Volts grade at a depth of 750 mm below ground levelover a cushionof 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge,complete in allrespect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 40 | S/L of following size submain coper conductor cabin in concaled PVC conduit 2.5 sq mm two wire (Havells/RR Kabel and equivalent) complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 41 | S/L of following size submain coper conductor cabin in concaled PVC conduit 6 sq mm two wire (Havells/RR Kabel and equivalent) complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 42 | S/L of following size submain coper conductor cabin in concaled PVC conduit 25 sq mm two wire (Havells/RR Kabel and equivalent) complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 43 | Supply and fixing of electronic fan regulator (Havells/RR and equivalent) 120-280 V. ISI marked, on the existingswitchboard including making connections, required material,labour T&P etc. for proper completionof work to the satisfactionof Engineerin charge of work complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 44 | S&F of 63 Amp. 4 pole MCB (Havells/RR and equivalent) (10 KA) C Curve complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 45 | S&F of 63 Amp. DP MCB (Havells/RR and equivalent) (10 KA) complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 46 | S&F of 6 Amp to 32 Amp. MCB (Havells/RR and equivalent) (10 KA) C Curve complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 47 | S/F of 63 Amp. 415 V metal - clad T.P.N. rewireable type switch fuse unit on angle iron bracket complete in all respect complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 48 | Supply, Installation, Testing and Commissioning of Servo controoled autometic voltage stabilizer (V-Guard/Microtech and equivalent) (out put 415+/-1%) 5 KVA Air cooled complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 49 | Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required: solar pannel 5 kw complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 50 | S/ Laying 12.5 mm thick 1:4 cement plaster on khand masonary work i/c all labour T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 51 | Providing and laying vitrified floor tiles (Kajaria/Cera and equivalent) in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4 (1 cement: 4 coarse sand), jointing with grey cement slurry@ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 52 | Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately) complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 53 | 12 mm thick one side Pre-laminated particle board (decorative lamination on one side and other sides balancing lamination) grade -1, medium density flat pressed, three layer particle board FPT - I or graded wood particle board FPT-1 conforming to IS: 3087 bonded with BWP type synthetic resin adhesive as per IS: 848 and pre-laminated conforming to IS: 12823, Grade -1, Type II marked complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 54 | 12.5 mm thick square edge PVC Laminated Gypsum Tile of size 595x595 mm, made of Gypsum plasterboard, manufactured from natural gypsum as per IS 2095 part I and laminated with white 0.16 mm thick fire retardant PVC film on the face side and 12 micron metalized polyester on the back side with all edges sealed with the face side PVC film which goes around and wraps the edges and is bonded to the edges and the back side metalized polyester film so as to make the tile a completely sealed unit complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 55 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 56 | Painting with two coat of weather Interial emulsion paint i/c all cost of labour,material and T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 57 | Providing andfixing 1 mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3 mm M.S. gusset plates at the iunctions and corners, all necessary fitting complete including applying a priming coat of approved steel primer complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 58 | Supply and errection of retro reflective sign boards having 2 mm thick alluminium sheet as sign substrtate facefully covered with 3 m scotchlite diamond grade retro reflective prismatic grade sheeting confirm to ASTM D-4956 type XI all letters legends and written matter will be computer cut using 3 m scotchlite elecrtro cut overlay film and processes with CAS system a per process recommend by original retro reflective sheeting manufacture complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 59 | Providing and fixing double glazed hermetically sealed glazing in aluminium windows, ventilators and partition etc. with 6 mm thick clear float glass both side, having 12 mm air gap, including providing EPDM gasket, perforated aluminium spacers, desiccants, sealant (Both primary and secondary sealant) etc. as per specifications, drawings complete complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 60 | Dismentalling of R.C.C work lime of cement mortar and i/c stacking material with in a distence of 60m i/c cost of all material,labour,T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 61 | Laying of M-20 RCC 1.1.5:3 with stone ballast with Mechenical mixing & vibration,curing including all cost of material labour T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 62 | Centring and shuttering for R.C.C. work including all cost of material labour T&P complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 63 | cutting, bending,binding with binding wire and its placing in position of steel Reinforcement (fe-415) with cost steel labour, Taxes,T&P etc complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 64 | Supply and fixing of precast ready made boundry including cost of all labour, material, T&P, etc and all lead, lift for proper completion of work complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 65 | Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer 3 mm thick water proofing membrane, black finished reinforced with non-woven polyester matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 litre/sqm by the same membrane manufacture of density at 25°C, 0.87-0.89 kg/ litre and viscocity 70-160 cps. Over the primer coat the layer of membrane shall be laid using Butane Torch and sealing all joints etc, and preparing the surface complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 66 | Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge,upto 90 metre depth below ground level complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 67 | Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe (Supreme/Finolex/Kishan and equivalent) of required dia, conforming to IS: 12818, including required hire and labour charges, fittings & accessories etc. all complete, for all depths, complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 68 | Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc.direct in ground (75 cm below ground level) including excavation and refilling the trench but excluding sand cushioning and protective covering etc.. complete as required. 63 mm dia (OD-63 mm & ID-51 mm nominal) (DSR CP.No. 14.16.1) complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 69 | Providing and fixing G.I. pipes (Zindal/Surya/Apolo and equivalent) complete with G.I. fittings and clamps, including cutting and making good the walls etc 15 mm dia G.I. pipe complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 70 | Providing and fixing G.I. pipes (Zindal/Surya/Apolo and equivalent) complete with G.I. fittings and clamps, including cutting and making good the walls etc 20 mm dia G.I. pipe complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 71 | Submersebil Pump (Crompton/Kishan/Texmo/Kriloskar and equivalent) set 100 mm dia (with polypropylene/Nory Impeller) up to 20 stages 5.0 HP complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 72 | Supplying and erecting Fully Automatic Star Delta starter (V-Guard/Havells/Crompton and equivalent) to operate squirrel cage induction motor working on 380- 440 Volt, 3 phase, 50 Hz with no volt coil, over load element, and ON - OFF push buttons, with necessary material and connected to supply, etc complete. Starter with original sheet steel inclozer starter complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 73 | Providing and fixing water closet squatting pan (Cera/Parrywar and equivalent) (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required:complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. |
| 74 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank (Sintex/Victus and equivalent) , IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge. Please Enable Macros to View BoQ information |