|
| 1 | Material |
| 2 | Bracing clamp Bottom SP-55 with N&B |
| 3 | Earth wire clamp for SP-55 with N&B |
| 4 | PP & clamp with N&B ST Pole SP-55 |
| 5 | Stay Clamp for SP-55 with nut & bolt |
| 6 | Bracing clamp Top SP-55 with N&B |
| 7 | 33 kv mid span jointing kit |
| 8 | 33 kv tension with bail & IPC |
| 9 | 33 kv cable ties for Pin Insulator |
| 10 | 33 kv IPC for covered to covered conductor |
| 11 | 33 kv IPC for covered to Bare conductor |
| 12 | IPC with Al bail for earthing |
| 13 | 33 KV Disc insulator for AAAC conductor |
| 14 | 33 KV Polymer Pin Insulator for covered conductor |
| 15 | Disc fitting (B&S) type 70 KN 33 KV AAAC |
| 16 | Supply af 33 KV AAAC, AL 59 (241 sqmm Covered Conductor) |
| 17 | Labour |
| 18 | Erection of earthing rod |
| 19 | Fabrication of steel |
| 20 | Excavation of Pit for stay set |
| 21 | Erection of 33 kv stay set |
| 22 | Grouting of stay set |
| 23 | Excavation of Pit for Pole |
| 24 | Erection of single SP-55 Pole |
| 25 | Erection of double SP-55 Pole |
| 26 | Grouting of Pole |
| 27 | Muffing of Pole |
| 28 | Painting of Pole |
| 29 | Erection of Bracket in 33 KV line |
| 30 | Cartage SP-55 pole 0-20 km |
| 31 | Cartage of petty material 0-20 km |
| 32 | Head Load cartage SP-55 Pole (0-1Km.) |
| 33 | Head Load cartage of Material (0-1 Km.) |
| 34 | Straightening of Tilted ST Poles |
| 35 | Laying spreading, Stringing AAAC conductor |
| 36 | Fixing of 33Kv tension clamp with IPC |
| 37 | Fixing of 33 KV Suspension Ties |
| 38 | Fixing of 33 kv IPC for covered - covered |
| 39 | Fixing of 33 kv IPC for covered - bare |
| 40 | Fixing of 33 kv mid span jointing kit |
| 41 | Fixing of IPC with AL bail for earthing |
| 42 | Fixing of 33 KV Disc Insulator |
| 43 | Fixing of 33 KV Pin Insulator for AAAC Covered Conductor |
| 44 | Removing of old conductor by opening jumer |
| 45 | Back carriage of scrap material Fixing of Aluminium Lugs Please Enable Macros to View BoQ information |