|
| 1 | Holding Clamp for fuse set set with bolts & Nuts |
| 2 | CROSS ARM HOLDING CLAMP FOR PCC POLE |
| 3 | F Bracket with N & Bolt |
| 4 | T- OFF CLAMP FOR 8.5 M PCC POLE |
| 5 | HT CLAMP FOR DOUBLE POLE |
| 6 | MS BOLT & NUT (WITH 1-WASHER)1.25\\"X3/8\\"Ø |
| 7 | Danger board for 11 KV |
| 8 | Stone Pad |
| 9 | G.I. Strip for Earthing |
| 10 | Lug 50 mm |
| 11 | AL. PG Clamps Weasel |
| 12 | L.T. Insulaed Percing Type-B |
| 13 | IPC Connector for ABC |
| 14 | STAY CLAMP 8.5M STP POLE |
| 15 | Clamp For T/F |
| 16 | Coper L-pice 50x225x10 mm (LS) |
| 17 | Coper L-pice 62x225x12 mm (LS) |
| 18 | All. Leg Long Barrel. off size (LS) |
| 19 | Pale Fencing Gate |
| 20 | Pale Fencing corner |
| 21 | Pale Fening intermediate |
| 22 | Lug 240 mm |
| 23 | Loding Unloding & Carrage Charges of PCC Pole from Store Center Jnp to Work Site |
| 24 | Loding Unloding & Carrage Charges of 10/25/63/100 & 250 KVA T/F from Store Center Jnp to Work Site |
| 25 | Loding Unloding & Carrage Charges of other Material from Store Center Jnp to Work Site |
| 26 | Loding Unloding & Carrige of 11kv XLPY Cable Store Center Jaunpur to Work Site |
| 27 | Construction of Plinth For 250 kva Transformer |
| 28 | Instalation of 10 kva Transformer |
| 29 | Instalation of 25 kva Transformer |
| 30 | Instalation of 63 kva Transformer |
| 31 | Instalation of 250 kva Transformer |
| 32 | Errection Charges of PCC Pole |
| 33 | Errection Charges of Stay |
| 34 | Errection Charges of D/P |
| 35 | Earthing Charges of PCC Pole & Transformer |
| 36 | Special Earthing Charges of 250 KVA Transformer |
| 37 | Errection Charges of HT Fuse Set |
| 38 | Errection Charges of LT Fuse Set |
| 39 | Sagging and Windding of 3 Phage 3 Wire Line of ACSR Rabbit Conductor Allready stand for PCC Pole |
| 40 | Sagging and Windding of 3 Phage AB Cable All Size Allready stand for PCC Pole |
| 41 | Grouting & Muffing of 8.5 Mtr PCC Pole |
| 42 | Labour Charges for Cable Joinging Kit Please Enable Macros to View BoQ information |