| 1 | Mounting of wall mount 15U Racks | Mounting of wall mount 15U Racks |
| 2 | Rack dressing of 15U Rack including tagging/labeling etc | Rack dressing of 15U Rack including tagging/labeling etc |
| 3 | Fixing and Termination of 24 Port Patch Panel | Fixing and Termination of 24 Port Patch Panel |
| 4 | Laying of PVC Conduits/Casing/Pipe/flexible pipe with Accessories like screws, joints, bends, saddles and other accessories for completing the job | Laying of PVC Conduits/Casing/Pipe/flexible pipe with Accessories like screws, joints, bends, saddles and other accessories for completing the job |
| 5 | Fixing & Termination of Information Outlet IO | Fixing & Termination of Information Outlet IO |
| 6 | Laying of HDPE/GI Pipes with accessories like couplers, bends and other accessories for completing the job | Laying of HDPE/GI Pipes with accessories like couplers, bends and other accessories for completing the job |
| 7 | Laying of OFC cable | Laying of OFC cable |
| 8 | Fixing of LIU | Fixing of LIU |
| 9 | OFC Pig Tails splicing & OFC 6- Cores fusion-splicing using jointing kit | OFC Pig Tails splicing & OFC 6- Cores fusion-splicing using jointing kit |
| 10 | Fixing of OFC Route Markers using cement concrete, bricks and other accessories for completing the job | Fixing of OFC Route Markers using cement concrete, bricks and other accessories for completing the job |
| 11 | Terminating Connectors on OFC per core | Terminating Connectors on OFC per core |
| 12 | Soft Soil trench Digging upto 3 feet depth and refilling after laying cables | Soft Soil trench Digging upto 3 feet depth and refilling after laying cables |
| 13 | Digging hard-soil / surface upto 3 feet depth | Digging hard-soil / surface upto 3 feet depth |
| 14 | Road cutting and Digging trench | Road cutting and Digging trench |
| 15 | Surface restoration (Cementing/concrete ) | Surface restoration (Cementing/concrete ) |
| 16 | Online UPS Installation with Battery bank, Iron Stand & Electrical Cabling | Online UPS Installation with Battery bank, Iron Stand & Electrical Cabling |
| 17 | Earthing PIT (Chemical-Earth, less than 2 ohm , less than 2 volts between earthing & neutral), permanent and maintenance free (PMF) type | Earthing PIT (Chemical-Earth, less than 2 ohm , less than 2 volts between earthing & neutral), permanent and maintenance free (PMF) type |
| 18 | Laying of Power Cable | Laying of Power Cable |
| 19 | Installation of Multi power Switch & Socket | Installation of Multi power Switch & Socket |
| 20 | Mounting and configuration of Network Devices. Devices must be clamped & screwed properly in the rack maintaining necessary spacing. | Mounting and configuration of Network Devices. Devices must be clamped & screwed properly in the rack maintaining necessary spacing. |
| 21 | Shifting charges for equipments along with racks & its components from one location to another including decommissioning, transportation, reinstallation, integration etc | Shifting charges for equipments along with racks & its components from one location to another including decommissioning, transportation, reinstallation, integration etc |
| 22 | Preventive maintenance of 15U Racks | Preventive maintenance of 15U Racks |
| 23 | Repair & trouble shooting of I/O jacks | Repair & trouble shooting of I/O jacks |
| 24 | Penta scanning Testing of IO Nodes | Penta scanning Testing of IO Nodes |
| 25 | Documentation and Certification of UTP cables | Documentation and Certification of UTP cables |
| 26 | OTDR Testing Report | OTDR Testing Report |
| 27 | Documentation and Certification of Fibre cables | Documentation and Certification of Fibre cables |
| 28 | OEM Certified Site Engineer for the period of contract | OEM Certified Site Engineer for the period of contract |