Name of Work:- PROVN OF ACCN FOR MI ROOM WITH AMBULANCE GARAGE AT HAWAS GULMARG UNDER GE 969 EWS
Sl. No.
Item Description
1
LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS
2
Lump sum price worked out by the contractor for BUILDING WORKS as listed in Schedule 'A' Part-I brought forward from serial page No. 27
3
Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule 'A' Part-II (Section-I) brought forward from serial page No. from 28 to 29.
4
INTERNAL ELECTRIFICATION WORKS Schedule 'A' Part-II (Section-II)
5
S&F LED Lamp 15 Watts complete all as specified and directed by Engr-in-Charge
6
M&L earthing complete with galvanized steel earth plate electrode 600mm x 600mm x 6 mm thick buried directly in ground (earth pit not less than 2.25 m deep below normal ground level) with top edge of the plate not less than 1.5 m below normal ground level connected to galvanized earth Wire 4.0 mm (up to 7.5 m in length from earth plate) by means of bolts and nuts checknuts and washers of galvanized iron or steel all as specified and shown in electrical plate no 3 of SSR part I including necessary excavation and earth work in any type of soil PCC 1.3:6 type C1 chamber with RCC 12:4 type B1 40 mm thick cover with MS rod 8mm dia at 150mm c/c in both ways as reinforcement, watering funnel, 20 mm dia light grade for protection of earth electrode, 20 mm dia GI pipe light grade for watering complete all as specified and as directed by Engineer in charge and tested on completion. Note (i) The rate is inclusive of necessary earth work, RFR and removal etc complete all as specified and directed by Engineer -in charge.(ii) Earthing shall be tested before making payment.
7
Lump sum price worked out by the contractor for ROAD/PATH WORKS as listed in Schedule 'A' Part-III brought forward from serial page No. 30
8
Lump sum price worked out by the contractor for AREA DRAINAGE WORKS listed in Schedule 'A' Part-IV brought forward from serial page No 31.
9
Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule 'A' Section-V (Part-I) brought forward from serial page No. from 32
10
Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS listed in Schedule 'A' Part-VI (Section-I) brought forward from serial page No. 33
11
EXTERNAL WATER SUPPLY WORKS Schedule 'A' Part-VI (Section-II)
12
M&L cutting existing GI pipe of 25mm dia in any position for inserting tee/specials for branch connection of 25 mm size including GI tee 25x25x25 mm complete all as specified and directed by Engr In Charge.
13
Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION WORKS listed in Schedule 'A' Part-VII (Section-I) brought forward from serial page No. from 34 to 36
14
EXTERNAL ELECTRIFICATION WORKS Schedule 'A' Part-VII (Section-II)
15
Construction of transformer shed for transformer of capacity upto 300KVA complete all as specified and show on Drg No CESZ/TD-1110/2011 Sheet 1/1 and 2/2 dated 01.12.11 Please Enable Macros to View BoQ information
16
Construction of transformer shed for transformer of capacity upto 300KVA complete all as specified and show on Drg No CESZ/TD-1110/2011 Sheet 1/1 and 2/2 dated 01.12.11 Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.