| 1 | Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizondal brasing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of transportation |
| 2 | Cleaning and levelling of transformer yard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc. |
| 3 | Dismantling three limbed 11kV RMU (CTC, CCC, etc) after disconnecting interpanel busbars (if any), disconnecting cables and packing cable for safety (for lifting), removing cable clamps, bottom plate, removing RMU from foundation bolts,lifting RMU from foundation, unloading to ground/loading to vehicle etc not including transportation cost) |
| 4 | Dismantling single limbed 11kV RMU (C,T,etc) after disconnecting interpanel busbars( if any), disconnecting cables and packing cable for safety (for lifting), removing cable clamps, bottom plate, removing RMU from foundation bolts,lifting RMU from foundation, unloading to ground/loading to vehicle etc not including transportation cost) |
| 5 | Cost of construction of foundation, base plates, fixing anchor bots, loading & unloading, handling, erection, allignment and allied works for the installation of Data Aquisition compatible Extensible type Ring Main Units with terminal protector boots & extension modules, actuators for remote operatios, communicable FPIs, CTs, PTs & relay contacts for SCADA, giving power & control wiring and connections, providing terminal protector, interconnecting RMU bus bar and control cables, providing metered LT supply from nearest LT pole, providing earth leads, cable mounting & terminations, giving connections after ascertaing proper phase sequence, providing location name & warning boards, burying cables & refilling, conducting all precommissioning tests as required, complete, except cost of conveyance. RMUs with two nos load break switches & one VCB |
| 6 | Dismantling one FRTU on existing Post on DP structure and dismantling connections including conveyance ( half of labour code 187, 614/2) |
| 7 | Installing one FRTU on existing Post on DP structure and giving connections including conveyance (same as DTR meter installation Code:187) |
| 8 | Additional rate for excavating trench on tarred/concrete surface of specified size. |
| 9 | Excavation of cable trench for maintenance of cable in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable). |
| 10 | Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling. |
| 11 | Excavation of cable trench of appropriate size ( normally 1.2m deep and 0.35m /0.5m wide for single/double run) in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable). |
| 12 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer in Charge. In mud mortar |
| 13 | Plastering with cement mortar 1:4, (1 cement : 4 fine sand) 12 mm thick one coat, floated hard and trowelled smooth for outside walls up to 10 m height including cost of all materials and labour etc. complete as per the standard specifications and direction of Board staff. ( DSR 2018 rate ) |
| 14 | Steel reinforcement for RCC work using TMT bars including straightening, cutting, bending, placing in position and binding all complete including conveyance charges, cost of materials, labour and sundry expenses etc complete as directed by the Engineer in charge ( DSR 2018 rate ) |
| 15 | Reinforced cement concrete 1:2:4 (1 cement : 2 coarse sand :4 graded stone aggregate 20mm nominal size), having (M20) GRADE, in column base, columns etc upto plinth level excluding cost of centering, shuttering , finishing and reinforcement including cost of all materials watering, curing etc. as per the standard specifications and direction of Board staff. ( DSR 2018 rate ) |
| 16 | Installing one DTR Meter with box of suitable size at a minimum height of 1.25 m above the ground level, in the existing Channel/Angle cross arm on DP structure, including fixing of 3 CTs on bus bar, laying and termination of control cable using proper lugs, fixing of meters, control fuses and giving connections including cost of conveyance of materials |
| 17 | Dismantling one DTR meter with box on existing channel/angle cross-arm on DP structure and dismantling connections including conveyance for maintenance works (half of labour code 187, ie.614/2) |
| 18 | Doing straight joint on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally as per specification after providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and other sundries etc. as per the direction of departmental officers at site. |
| 19 | Pillar foundation for Transformers of and above 250 kVA (Double pillar) |
| 20 | Dismantling one Transformer (above 160kVA) from existing plinth to ground, including disconnecting HT/LT/Earth connections. |
| 21 | Erecting one 500kVA Transformer to existing Plinth/Platform and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer. |
| 22 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 23 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade One or more coats on old work ( DSR 2018 rate ) |
| 24 | Re-Painting of RMU using 2 coats of enamel/marine paint over one coat of primer using approved quality paints and labelling of RMU Station and each limb. |
| 25 | The Hire charges for Mobile crane for dismantling Existing RMU and Erecting new RMU of any Types (for 8 hrs) arrived from the office of the EE , PMU , thiruvanthapuram for carried out the works in PMU scheme under Thiruvanthapuram circle as per 1004 ( DSR Vol 1 ). Pls sanction and hence included in the labor portion of Samgara. |
| 26 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : Water thinnable cement primer : (for Trfr foundation etc) |
| 27 | Filling available excavated earth(Excluding rocks) in trenches,plinth ,sides of foundation etc.in layers not exceeding 20cm in depth(D.S.R2016&cost indexon Tvpm 1.3793) |
| 28 | Providing RMU Roof- The revised estimate for the construction of roof for RMU was approved by the Deputy Chief Engineer,Electrical Circle ,Thiruvananthapuram during the year 2019. Rs 1995 per square meter has been decided. The estimate is prepared in the manner of constructing the roof using GI sheet and GI pipe. |
| 29 | Erection of LT 4 way distribution box (normal size 190x40x90cm) on existing cross arm, giving connection including cable and earth connection (excluding earthing). |
| 30 | Dismantling of LT 4 way distribution box from existing cross arm including dismantling cable and earth connection |
| 31 | Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 63/100/160/250kVA Transformers / Ring Main Units excluding loading& unloading charges. |
| 32 | Transporting Transformers by hired vehicle to a distance beyond 5km and carrying upto 2 numbers of 63/100/160/250kVA Transformers / Ring Main Units (Running km). |
| 33 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 34 | Cutting Channel/Cross Arm/Angle Iron into two pieces. |
| 35 | Drilling oval shaped hole of various sizes on existing Channel/Cross Arm/GI/MS cleat etc. |
| 36 | 10.26.3 : Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes |
| 37 | 10.22 : Welding by gas or electric plant including transportation of plant at site etc. complete. |
| 38 | Painting with synthetic enamel paint of approved brand and manufacturer of required color to give an even shade of as per direction of KSEBL officers at site- fencing |
| 39 | DSR 2018 13.61.1 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work |
| 40 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. Please Enable Macros to View BoQ information |
| 41 | 953.0 |
| 42 | 954.0 |
| 43 | 992.0 |
| 44 | C-202223-4501-10 |
| 45 | C-202223-4501-7 |
| 46 | 936.0 |
| 47 | 938.0 |
| 48 | 929.0 |
| 49 | 926.0 |
| 50 | C-202425-4506-1 |
| 51 | C-202223-4507-8 |
| 52 | C-202223-4507-7 |
| 53 | C-202223-4507-6 |
| 54 | 187.0 |
| 55 | C-202223-4501-9 |
| 56 | 931.0 |
| 57 | 714.0 |
| 58 | 150.0 |
| 59 | 363.0 |
| 60 | C-202223-4507-10 |
| 61 | C-202425-4503-48 |
| 62 | C-202223-4506-2 |
| 63 | C-202223-4501-4 |
| 64 | C-202223-4505-1 |
| 65 | C-202223-4503-3 |
| 66 | 155.0 |
| 67 | C-202223-4504-1 |
| 68 | 728.0 |
| 69 | 729.0 |
| 70 | 163.0 |
| 71 | 365.0 |
| 72 | 364.0 |
| 73 | DSR_10.26.3 |
| 74 | DSR_10.22 |
| 75 | C-202223-4501-3 |
| 76 | C-202425-4201-2 |
| 77 | 955.0 Labour Total 636610.18 |