| 1 | Scraping White wash and colour wash |
| 2 | Preparation of plastered or concrete surface for painting (including sand papering the surface) using ready mixed cement based wall putty by applying two or more coats to get required finish |
| 3 | Applying priming coat with cement primer in all shade on newly plastered or concrete exterior surface |
| 4 | Distempering with Acrylic washable oil bound distemper (of approved manufacture) two or more coats on old distempered work when shade is changed |
| 5 | Finishing walls with acrylic smooth exterior paint of required shade with two or more coats applied @ 1.67 litre/10Sqm over and including base coat of water proofing Cement Paint applied @ 2.20 Kg/10 Sqm |
| 6 | Painting two or more coats with synthetic enamel paints in all shades on old wood work or metallic or plastered or concrete surface to give an even shade including rubbing down old paint. |
| 7 | Providing and fixing mineral fibre false ceiling tiles ( NRC 0.55 to 0.6) at all heights of size 595X595x16 mm of approved texture, design and pattern. The tiles should have Humidity Resistance (RH) of 99%, Light Reflection > 85%, Thermal Conductivity k = 0.052 - 0.057 w/m K, Fire Performance as per (BS 476 pt - 6 &7)in true horizontal level suspended on interlocking T-Grid of hot dipped all round galvanized iron section of 0.33 mm thick |
| 8 | Iron grated doors, including pintle hinges & arrangements. |
| 9 | Applying priming coat with metal primer on new steel or iron work including preparation of surface. |
| 10 | Marble stone flooring with 18-20 mm thick marble stone, as per sample of marble approved by Engineer-in-charge, over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with grey cement slurry, including rubbing and polishing complete with : |
| 11 | Dismantling cement conglomerate floors 25mm to 50mm thick including concrete base. |
| 12 | Screed of 50mm thick cement concrete 1:8:16 to be laid below the topping using mechanical mixer for mixing of material |
| 13 | Providing and fixing commercial plywood 18mm thick |
| 14 | Providing and fixing ply wood, plain lining, butt jointed including PVC Plug placed at 45 cm to 65 cm centers complete with necessary nails (Frame work shall be payable extra) |
| 15 | 4mm thick decorative ply wood with teak faced on one side |
| 16 | Spirit polishing two coats including a coat of wood filler on wood work |
| 17 | Factory manufactured solid flush door fixed in position iron hinges, etc (excluding the cost of any fittings other than specified above but including labour for fixing the same in position |
| 18 | Providing and laying vitrified floor tiles of different sizes in light colour shades made using Double Charge technology (thickness to be specified by the manufacturer) with water absorption’s less than 0.08% and conforming to IS : 15622 of approved make in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement: 4 fine sand), complete. |
| 19 | Providing & Fixing glass panes with nails and putty or wooden strip complete in all respect 5mm thick plate glass (india) |
| 20 | Providing and fixing hydraulic door closer ISI mark with necessary screw etc. complete |
| 21 | Regrading terracing of mud plaster covered with tiles or bricks in cement by dismantling tiles or bricks, removing mud plaster, preparing the surface of mud plaster to proper, slope, relaying mud plaster Gobri leaping and tiles or bricks grouted in cement mortar 1:3 (1 cement and 3 fine sand) including replacing unserviceable tiles, or bricks with new over and disposal of unserviceable material to the dumping ground within 50 m lead (The cost of new tiles or bricks excluded). |
| 22 | Tiles 22.86cm X 11.43cm X 3.81cm hand moulded at kiln site for all Districts. ( 37No.s tile per Sqm ) |
| 23 | Applying bitumen on roof including heating and carrying to roof |
| 24 | Cement concrete 1:2:4 gola 10cm x 10cm concave quadrant along junction of roofs with parapet wall finished smooth, where specially specified. |
| 25 | Scraping Cement plaster |
| 26 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S.clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerincharge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding.Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. |
| 27 | Dismantling of wall tiles at any floor of the building, laid in cement mortar including scraping of cement plaster and disposal of malbaata suitable placewith in a distance of 100 Mtrs of the complex complete in all respect. |
| 28 | 20mm thick cement plaster 1:5 in two coat work |
| 29 | Cement concrete 1:2:4 |
| 30 | Finishing walls with cement based water soluble exterior paint such as snowcem, robbiacem etc. two or more coats to give an even shade |
| 31 | Coloured Granite stone tiles15mm to 20mm thick in skirting, risers of steps,dado walls and pillars laid in 12.5mm thick cement mortar 1:3 (cement 3 coarse sand) and jointedwith neat cement slurry mixed with pigment to match the shade of stone, including rubbing and polishing including labour for fixing dowel pins and cramps |
| 32 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes single socketed (working pressure 4 kgf/cm2) conforming to IS : 4985, including fixing with MS clamps 160 mm dia |
| 33 | Providing and fixing 110 mm dia. U.P.V.C Coupling/Sockete for Rain water pipe as per IS:14735 including jointing complete as per specifications and to the entire satisfaction of Engineer- in- charge. |
| 34 | Providing and fixing in position SWR UPVC special for soil waste vent or anti syphonage pipes as per as per IS - 14735 includingcutting and wastage etc. cutting holes in walls roofs or floors etc. and making good to its original condition but excluding cost of lead joining. Please Enable Macros to View BoQ information |