|
| 1 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. |
| 2 | Taking down chowkhats with shutters (without taking off shutter from frame) n exc 1.5 Sqm each with mongry including Cutting holes into through brick wall and making good to dismantled portion in CM (1:3) or PCC (1:2:4) complete all as specified and as directed. |
| 3 | Taking down chowkhats with shutters (without taking off shutter from frame)exc 1.5 Sqm but n exc 4 sqm each with mongry including Cutting holes into through brick wall and making good to dismantled portion in CM (1:3) or PCC (1:2:4) complete all as specified and as directed. |
| 4 | Taking down steel window/ventilator with shutters (without taking off shutter from frame) not exc 1.5 Sqm each with mongry including Cutting holes into through brick wall and making good to dismantled portion in CM (1:3) or PCC (1:2:4) B1complete all as specified and as directed. |
| 5 | Taking down steel or window/ventilator with shutters (without taking off shutter from frame) exc 1.5 Sqm but not exc 4 sqm each with mongry including Cutting holes into through brick wall and making good to dismantled portion in CM (1:3) or PCC (1:2:4) B1 complete all as specified and as directed. |
| 6 | Taking down shutters of any description exc 1 sqm but not exc 2 sqm each and complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. |
| 7 | Taking down and refixing of shutters in same opening any description exc 1 sqm each but not exc 2 sqm each complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. |
| 8 | Taking up or down steel tubing and connections of 15mm bore in pipe, including cleaning for re-fixing or removal from site to store complete all as specified and directed by Engineer-in-Charge. |
| 9 | Taking up or down steel tubing and connections of 20mm bore in pipe, including cleaning for re-fixing or removal from site to store complete all as specified and directed by Engineer-in-Charge. |
| 10 | Taking down and refxing Collapsible steel gates not exc 6 sqm after repair of gate change of necessary part/ items in gate ,like top hung consisting of channel pickets, flat bars for top and bottom track runners 50 x 50 x 6 mm, roller wheel 65 mm, end channels fixed in wall,vertical channel 20 x 6 mm, locking key, steel handles etc., as specified, erected in position and securing runners with hold fasts, brackets and other repair for smooth functioning, complet all as specified and directed. |
| 11 | Demolition of brick work or stone/boulder masonary built in cement mortar incl all quions arches, pillar or any other descrption etc complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge.Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. |
| 12 | Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) as in roofs, floors (other than ground floors) beams, slabs, staircases, landing, chajjas,facia and similar suspended work including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge.Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. |
| 13 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge.Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. |
| 14 | Demolition of Cement concrete unreinforced as in Ground Floor and paving n. exc. 15cm thick (above or below G.L.) complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge.Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. |
| 15 | Dismantling timber scantlings in in fillets, rails, posts, rafters, purlins, etc. under 40 sq. cm in section any location and any position complete all as specified and directed by Engineer-in-Charge.Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. |
| 16 | Dismantling wrought iron or mild steel work of any description not otherwise provided for, if any complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge.Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. |
| 17 | Petty repair to existing steel window by welding hinges or removing the steel window shutters from the frame and re-fixing after welding making serviceable all as specified. |
| 18 | Petty repair to existing steel door /steel mumty door by welding hinges or removing the steel door shutters from the frame and re-fixing after ,welding making serviceable all as specified. |
| 19 | Dismantling of cast iron pipe/ PVC drain pipes/PVC (SWR) pipe etc, 100/ 75/ 50 mm jointed in cement mortar and taking out of trenches and wall, if required complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge.Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. |
| 20 | Dismantling Stone slabs and tiles of any description or thickness in floors, aprons etc, complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge.Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. |
| 21 | Dismantling of Asbestos cement (corrugated, semicorrugated, etc.) sheets in roof coverings complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge.Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. |
| 22 | Hacking out old broken glass (any thickness, size, quality or description) from metal frame including punching or drilling out old glazing pins/spring clips including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge.Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. |
| 23 | Cutting chases in brick walls, pinning in, making good to facings where required and pointing in cement mortar 1:3 to ends or edges of landings, steps, cills, sunshades, shelves, lintels, etc.; and cutting chases for concealed water tubing or concealed conduit wiring etc., and making good, cutting not exc 10 cm girth and complete all as specified and directed by Engineer-in-Charge. |
| 24 | Taking out roots of trees penetrated through valves/concrete surfaces etc upto a depth of 600mm by chieseling , demolition of brick work , concrete work and pouring concentrated acids/Dr fixit chemicals upto the depth of roots and making good the disturbed portion. |
| 25 | Cleaning and removing all scale and dirt etc, from tanks and mouths of circulating pipes of water tanks using acetic acid and citric acid used for descaling and removing mineral deposite from tank surface exceeding 250 ltr and not exceeding 500 ltr capacity. |
| 26 | Cleaning and removing all scale and dirt etc, from tanks and mouths of circulating pipes of water tanks using acetic acid and citric acid used for descaling and removing mineral deposite from tank surface exceeding 500 ltr and not exceeding 1000 ltr capacity. |
| 27 | Disconnecting existing tanks of capacity exc. 250 ltr & n. exc. 500 ltr, setting aside and removing from site complete all as specified and directed by Engineer-in-Charge. |
| 28 | Disconnecting existing tanks of capacity exc. 500 ltr & n. exc. 1000 ltr, setting aside and removing from site complete all as specified and directed by Engineer-in-Charge. Please Enable Macros to View BoQ information |
| 29 | Disconnecting existing tanks of capacity exc. 500 ltr & n. exc. 1000 ltr, setting aside and removing from site complete all as specified and directed by Engineer-in-Charge. Please Enable Macros to View BoQ information |