| 1 | (Part-A) Supply & Erection Providing & Fixing of DB Box | (Part-A) Supply & Erection Providing & Fixing of DB Box |
| 2 | Providing & Fixing of Stone pad | Providing & Fixing of Stone pad |
| 3 | Providing & Fixing of Dropper Channel | Providing & Fixing of Dropper Channel |
| 4 | Providing & Fixing of LT Incoming Pannel | Providing & Fixing of LT Incoming Pannel |
| 5 | Providing & Fixing of Suspension Clamp with I Hook | Providing & Fixing of Suspension Clamp with I Hook |
| 6 | Providing & Fixing of Suspension Clamp | Providing & Fixing of Suspension Clamp |
| 7 | Providing & Fixing of X Arm Clamp | Providing & Fixing of X Arm Clamp |
| 8 | Providing & Fixing of Dead End Clamp | Providing & Fixing of Dead End Clamp |
| 9 | Providing & Fixing of T off channel with clamp | Providing & Fixing of T off channel with clamp |
| 10 | Providing & Fixing of EYE Hook | Providing & Fixing of EYE Hook |
| 11 | Providing & Fixing of chemical earthing of 11 KV RMU | Providing & Fixing of chemical earthing of 11 KV RMU |
| 12 | Providing & Fixing of MS TOP CHANNEL 125*65*2240sqmm | Providing & Fixing of MS TOP CHANNEL 125*65*2240sqmm |
| 13 | Providing & Fixing of clamp for T Channel | Providing & Fixing of clamp for T Channel |
| 14 | Providing & Fixing of Nut & Bolt off size | Providing & Fixing of Nut & Bolt off size |
| 15 | Providing & Fixing of LT Pole Clamp with Nut & Bolts | Providing & Fixing of LT Pole Clamp with Nut & Bolts |
| 16 | Providing & Fixing of Earthing Complete | Providing & Fixing of Earthing Complete |
| 17 | Providing & Fixing of GI Pipe 6\\" DIA | Providing & Fixing of GI Pipe 6\\" DIA |
| 18 | Providing & fixing of DP clamp | Providing & fixing of DP clamp |
| 19 | Providing & Fixing of Danger Board | Providing & Fixing of Danger Board |
| 20 | Providing & Fixing of MS Angle 75*75*6*2228mm with clamp | Providing & Fixing of MS Angle 75*75*6*2228mm with clamp |
| 21 | Providing & Fixing of Gaurding Angle | Providing & Fixing of Gaurding Angle |
| 22 | Providing & Fixing of Gaurding Angle clamp | Providing & Fixing of Gaurding Angle clamp |
| 23 | Providing & Fixing of DB Clamp | Providing & Fixing of DB Clamp |
| 24 | (Part-B) Carriage & Erection Construction of Plinth For 11 Kv RMU of size 6*6*3 above around level on ft below the ground level of 9\\" after exavation of 4\\" earth brick ballast shall be provided and remmering will be done properly after ballast shall be provided and rammering will be done properly after that a retaining wall 9\\" width by first class brick in ratio 1:4 of cement & sand shall be made the earth shall be filled up to one ft below the top of the plinth after this brick ballast shall be provided upto 6\\" from the earth level and proper rammering shall be done one No. jall of 12 mm MS tar sgakk ve fixed in the hollow of plinth and one ft. thick RCC in ration of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. (All material provided by the contractor at his won cost for proper completion of work) | (Part-B) Carriage & Erection Construction of Plinth For 11 Kv RMU of size 6*6*3 above around level on ft below the ground level of 9\\" after exavation of 4\\" earth brick ballast shall be provided and remmering will be done properly after ballast shall be provided and rammering will be done properly after that a retaining wall 9\\" width by first class brick in ratio 1:4 of cement & sand shall be made the earth shall be filled up to one ft below the top of the plinth after this brick ballast shall be provided upto 6\\" from the earth level and proper rammering shall be done one No. jall of 12 mm MS tar sgakk ve fixed in the hollow of plinth and one ft. thick RCC in ration of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. (All material provided by the contractor at his won cost for proper completion of work) |
| 25 | Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) | Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) |
| 26 | Carriage of 11kv RMU Set 3 way from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) | Carriage of 11kv RMU Set 3 way from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) |
| 27 | Carriage of 63 KVA T/F fromElectricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) | Carriage of 63 KVA T/F fromElectricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) |
| 28 | Carriage of 100 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) | Carriage of 100 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) |
| 29 | Cartiage of 11kv XLPE CABLE 3*185 SQMM (200 mtr), LT XLPE Cable 3.5x150sqmm (64 mtr) from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) | Cartiage of 11kv XLPE CABLE 3*185 SQMM (200 mtr), LT XLPE Cable 3.5x150sqmm (64 mtr) from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) |
| 30 | Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) J) Jointing Kit Outdoor/Indoor 3x185 sqmm (16 No), Line material viz. LT ABC (3x95)+(1x70)+(1x16) SQMM (1100 mtr), LT ABC (3x95)+(1x70)+(1x16) SQMM (435 mtr), A.C.S.R Weasal conductor (820 mtr), 11 kv Disc Insulator (39 Nos.), 11 kv Pin insulator (42 nos), 3 Phase Fuse Set (8 No.), Stay set (26 No) and other line material, if required, | Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) J) Jointing Kit Outdoor/Indoor 3x185 sqmm (16 No), Line material viz. LT ABC (3x95)+(1x70)+(1x16) SQMM (1100 mtr), LT ABC (3x95)+(1x70)+(1x16) SQMM (435 mtr), A.C.S.R Weasal conductor (820 mtr), 11 kv Disc Insulator (39 Nos.), 11 kv Pin insulator (42 nos), 3 Phase Fuse Set (8 No.), Stay set (26 No) and other line material, if required, |
| 31 | Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 32 | Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 33 | Installation, Testing & Commissioning of 11kv RMU Set 3 way with Power Back Including Fixing of All accessories T&P and Labour as per RESPO norms and required for proper completion of work shall be done by the contractor at his own cost. | Installation, Testing & Commissioning of 11kv RMU Set 3 way with Power Back Including Fixing of All accessories T&P and Labour as per RESPO norms and required for proper completion of work shall be done by the contractor at his own cost. |
| 34 | Fencing of 11 KV RMU shall be 1150*1200mm made of 35*35mm MS Angle covered by expended metal 14 SWG up to full by MS Flat by and 8 SWG dia bolt & nut, (all meterial provided by the contractor at his won cost) | Fencing of 11 KV RMU shall be 1150*1200mm made of 35*35mm MS Angle covered by expended metal 14 SWG up to full by MS Flat by and 8 SWG dia bolt & nut, (all meterial provided by the contractor at his won cost) |
| 35 | Mounting & Installation of 63 KVA T/F on existing Double Pole in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for proper completion of work shall be done by the contractor at his own cost. | Mounting & Installation of 63 KVA T/F on existing Double Pole in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for proper completion of work shall be done by the contractor at his own cost. |
| 36 | Mounting & Installation of 100 KVA T/F on existing Double Pole in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required required for proper completion of work shall be done by the contractor at his own cost. | Mounting & Installation of 100 KVA T/F on existing Double Pole in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required required for proper completion of work shall be done by the contractor at his own cost. |
| 37 | Laying, sagging, stringing, binding and jumpering of Line material viz. LT ABC (3x95)+(1x70)+(1x16) SQMM (1100 mtr), LT ABC (3x95)+(1x70)+(1x16) SQMM (435 mtr), A.C.S.R Weasal conductor (820 mtr), in HT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work shall be done by the contractor at his own cost. | Laying, sagging, stringing, binding and jumpering of Line material viz. LT ABC (3x95)+(1x70)+(1x16) SQMM (1100 mtr), LT ABC (3x95)+(1x70)+(1x16) SQMM (435 mtr), A.C.S.R Weasal conductor (820 mtr), in HT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work shall be done by the contractor at his own cost. |
| 38 | Laying sagging stringing and binding and jumpering of 11kv XLPE CABLE 3*185 SQMM (200 mtr), LT XLPE Cable 3.5x150sqmm (64 mtr) in 11KV/ LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work shall be done by the contractor at his own cost. | Laying sagging stringing and binding and jumpering of 11kv XLPE CABLE 3*185 SQMM (200 mtr), LT XLPE Cable 3.5x150sqmm (64 mtr) in 11KV/ LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work shall be done by the contractor at his own cost. |
| 39 | Filling of 33 KV Jointing Kit 3x185 sqmm ID/OD and making connection as per direction by supervising engineer. | Filling of 33 KV Jointing Kit 3x185 sqmm ID/OD and making connection as per direction by supervising engineer. |
| 40 | Installation of Stay Set Complete as direction by supervising Engineer. | Installation of Stay Set Complete as direction by supervising Engineer. |
| 41 | Installation of LT Fuse Set as direction by supervising Engineer. | Installation of LT Fuse Set as direction by supervising Engineer. |