| 1 | Safe carriage loading unloading with proper stacking of following material from ESC Daliganj to Work Site/JE dump store. |
| 2 | PCC Pole 8.5/11 Mtr. |
| 3 | ST Pole 11 Mtr. |
| 4 | ACSR Weasel/Rabbit/Dog Conductor |
| 5 | 11 KV 3x70/120/185 Sqmm XLPE Cable |
| 6 | 11 KV 3x70/120/185 Sqmm O/D I/D S/T Kit |
| 7 | 11 KV Pin Insulator |
| 8 | 11 KV Disc Insulator with Fitting |
| 9 | G.I. Wire 4mm/8swg |
| 10 | V Type X arm |
| 11 | Stay Rod Complete |
| 12 | Top Channel |
| 13 | Stay Wire |
| 14 | Dropper Channel |
| 15 | M.S. Earthing Rod |
| 16 | T-Off Channel |
| 17 | M.S. Angle |
| 18 | All Decentralized Items Provided/Fixing/ Erection/Installation/Laying/Foundation with earthing by the contractor as on his own cost as per RESPO Narms.33 KV LINE ERECTION WORKMinimum depth of laying from ground surface to the top of cable as per IS is1)Low Voltage (1.1KV) and control cable 0.75 Mtr2) 3.3 KV to 11 KV Cables 0.90 Mtr3) 22 KV to 33 KV Cable 1.05 Mtr4) Cables at Road Crossing 1.00 Mtr5) Cable at Railway Laval Crossing ( measured from bottom 1.00 Mtr Of sleepers to top of pipe) Note- 1- The depth may be increased but not more than 1.6 Mtr 2- The Standard depth and width for laying the cable are also attached ( as per letter No 561/Director(Tech)/MVVNL/Camp/Dt 09.01.2026 with the tender form) |
| 19 | Dragging of ST/PCC Pole digging of pit erection of sub-station type double pole structure on ST/PCC Pole with fixing of necessary item such as Top Channel, along with grouting (As per RESPO Norms) Dropper Channel, 11 pin insulator with Pin & 11 KV Disc Insulator with fitting, DO Fuse set its ramming, as per RESPO Specification. Only Pole and insulator will be Provided by the Department. |
| 20 | Dragging of ST/PCC Pole to pit site, diging of pit erection and grouting (As per RESPO Norms) of 11 KV line with fixing of necessary item, such as V-type X-arm, F-bracket, 11 KV Pin insulator, Gaurding angle (1.8 mm 65x65x6) with Nut & bolts its ramming as per RESSPO Specification. Only Pole and insulator will be Provided by the Department. |
| 21 | Fabrication, erection of double pole for end terminations/sectional double pole, 11 KV line on ST/PCC Pole with fixing of necessary clamps & other accessories like 1 nos top channel 100x50 mm 2.24 m. 1 No. Guarding Angle. Its grouting in ratio 1:4:8 plinthing 300 mm above ground level, earthing of support & one side cable expose. |
| 22 | Laying Stringing & sagging of 3 Phase 3 wire 11 KV New Line on ACSR Wesal/Racoon/Dog/Rabbit conductor as per RESPO Specification and direction on E/I. All material exept ACSR wesal/Racoon/Dog/Rabbit conductor shall be supplied by the contractor. |
| 23 | Ordinary earthing by 11 KV MS earth Rod 2500mm long as per RESPO Schedule. |
| 24 | Grouting & Nuzzling of 11 KV stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand, Brick blast & cement). All material except stay wire and rod shall be supplied by the contractor. |
| 25 | Guarding of HT line by GI wire. GI wire shall be supplied by the department. |
| 26 | Supply and Fixing of T-Off Channel |
| 27 | Grouting & Nuzzling of 11 KV stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand, Brick blast & cement). All material except stay wire shall be supplied by the contractor. |
| 28 | Cable Hosting of 11 KV 3x70/3x120/3x185 sq. mm XLPE Cable at the following including jumpering etc complete with help of GI Pipe as Per RESPO Norms. GI pipe and other required material shall be supplied by contractor. |
| 29 | High pressure testing of 11 KV 3x70/3x120x3x185 XLPE cable along with arrangement of High Pressure equipment. |
| 30 | Laying of 3X70/3x120/3x185 sq.mm 11 KV XLPE cable by drill method Single Circuit as per RESPO Norms. Only 11 KV XLPE cable supplied by Department. |
| 31 | Laying of 3X70/3x120/3x185 sq.mm 11 KV XLPE cable by drill method Double Circuit as per RESPO Norms. Only 11 KV XLPE cable supplied by Department. |
| 32 | Dismantling and shifting of material from work site to JE Store/Centre Store |
| 33 | Supply of Earthing Rod Please Enable Macros to View BoQ information |