| 1 | Earth work in cutting for correcting internal/outer section of canal by Poclain /JCB machines including side slope cutting at requried slope with all lead & lifts in all type of soils with disposal on daula and top & outer slope of banks, including proper spreading . As per direction of Engineer in charge. |
| 2 | Earth work in filling with carriage for correcting internal/outer section of canal by Poclain /JCB machines including side slope cutting at requried slope with all lead & lifts in all type of soils with disposal on daula and top & outer slope of banks, including proper spreading . As per direction of Engineer in charge. |
| 3 | Dressing of Banks and daula of Canal including requried slope in all type of soils including cost of all materials labour, T&P etc required for proper completion of work. As per direction of Engineer in charge. |
| 4 | Jungle Clearance on branches below 1000 cusecs Dy's and Minors with SR (complete Section of both bank). As per direction of Engineer in charge. |
| 5 | Dismantling reinforced cement concrete including stacking of dismantled materials within a distance of 60 M.As per direction of Engineer in charge. |
| 6 | Dismantling brick work in cement mortor including stacking of dismantled materials within a distance of 60 m. As per direction of Engineer in charge. |
| 7 | Earth work in foundation in all type of soil mixed with charry, karail, black cottan soil or moorum including all lead & lifts T&P and disposal of surplus earth up to a distance of 100m. from the foundation trenches for proper complation of work. As per direction of Engineer in charge. |
| 8 | P/L C.C. 1:3:6 in foundation and gravity floor with one part of cement, three part of coarse sand and six part of stone ballast 20 to 40 size including cost of all materials labour, T&P etc required for proper completion of work per Cum. As per direction of Engineer in charge. |
| 9 | First class brick work in 1:4 C.M. with one part of cement and four part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work. As per direction of Engineer in charge. |
| 10 | First class brick work in 1:3 C.M. with one part of cement and four part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work. As per direction of Engineer in charge. |
| 11 | Centering and shuttering for R.C.C. and C.C. work including cost of all materials labour, T&P etc required for proper completion of work . As per direction of Engineer in charge. |
| 12 | Bending, Binding, Cutting and placing in position steel reinforecement including cost of all materials labour, T&P etc required for proper completion of work. As per direction of Engineer in charge. |
| 13 | P/F expansion joint filler board 18mm thick including all cost of material , labour , T&P etc complete required for proper completion of work. As per direction of Engineer in charge. |
| 14 | P/L R.C.C. 1:1.5:3 in slab with one part of cement , one& half part of coarse sand and three part of hard stone grit 4.75 to 20mm size including cost of all materials labour, T&P etc required for proper completion of work. As per direction of Engineer in charge. |
| 15 | P/L C.C. 1:1.5:3 in wearing coat over slab with one part of cement , one half part of coarse sand and three part of hard stone grit 4.75 to 20mm size including cost of all materials labour, T&P etc required for proper completion of work. As per direction of Engineer in charge. |
| 16 | Deep ruled cement pointing in 1:2 C.M. one part of cement and two part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work per sqm. As per direction of Engineer in charge. |
| 17 | P/F wheel gaurd of stone including cost of all materials labour, T&P etc required for proper completion of work. As per direction of Engineer in charge. |
| 18 | Earth work in road diversion and ramp etc with all lead and all lift , proper manual compaction and dressing , watering , including labour , T&P etc complete required for proper completion of work .As per direction of Engineer in charge. |
| 19 | Running of 5 H.P. Generator set diesel pump for dewatering work arrangement of pump suction and delivery pipe, fule & lubricant for pump. As per direction of Engineer in charge. |
| 20 | First class Brick pitching on edge over Service Road filling joint with local sand including all cost of materials , labour , T&P etc complete required for proper completion of work. As per direction of Engineer in charge. |
| 21 | S/F P.V.C. Pipe 110mm dia 0.60m long for drainage spout pipe including all cost of materials , labour , T&P etc complete required for proper completion of work. As per direction of Engineer in charge. |
| 22 | Providing & Laying Local Sand in foundation including cost of all materials, labour, T&P with all lead & lift etc complete. As per direction of Engineer in charge. |
| 23 | Preparation of Subgrade for lining works including all lead, lift, T&P etc complete. As per direction of Engineer in charge. |
| 24 | Laying double layer of brick or tile in lining in cement mortor on the bed of channel including 15 mm thick cement plaster on the top . Including construction of curing drainsover patra including scaffolding. As per direction of Engineer in charge. |
| 25 | 12 mm thick cement plaster in 1:2 C.M. one part of cement and two part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work per sqm. As per direction of Engineer in charge. |
| 26 | Renovation of steel gate by taking out rusted & damaged leaf with channel and providing outer channel, spendle rod, inner channel check nut and mild steel leaf with other accesseries as per requered including cost of all material, labour, T & P etc. required for proper completion of work. As per direction of Engineer in charge. |
| 27 | Painting parapets and other structure, side slabs etc with water proofing cement paints of approved make quality and of required shed on new wall surface two coat over one coat of white cement primer to give an even shade after thoroughly brushing the surface to remove powdered material including curing and cost of all material. As per direction of Engineer in charge. |
| 28 | Fabrication and supply sign board on angle iron framd 40 x 40 x 6 mm. 25 x 5 mm. flat iron board sand 16 SWG M.S. Sheet of board size 1200x900 including two coat of iron work approved synthetic enamel paint and lettering, fixing of sign board at canal head by c.c. 1:4:8 including cost of all material, labour, T&P etc. required as per approved drawing inclosed. As per direction of Engineer in charge. Please Enable Macros to View BoQ information |