| 1 | Earth Work in excavation of foundation in all Type of soil including all lead lift T&P etc. As per direction of Engineer in charge. |
| 2 | Earth Work in filling making base for Brick Soling. As per direction of Engineer in charge. |
| 3 | Earth work in filling in making section of existing channel including all lead and lift mannual compaction and dressing to required profile with cost of all material, labour and T&p required for proper completion of work. As per direction of Engineer in charge. |
| 4 | Laying of P.C.C. 1:3:6 in foundation With cement corace sand and stone ballast 20mm to 40mm. size including cost of all material , labour T&P etc. As per direction of Engineer in charge. |
| 5 | Laying of P C.C. 1:3:6 in foundation with cement corace sand and stone ballast 20mm to 40mm size including cost of all material and labour T&P etc. As per direction of Engineer in charge. |
| 6 | B/W with 1:4 cement Mortor with brick class 150, cement, coarse sand including cost of all material and labour T&P etc. As per direction of Engineer in charge. |
| 7 | B/W with 1:4 cement Mortor with brick class 150, cement, coarse sand including cost of all material and labour T&P etc. As per direction of Engineer in charge. |
| 8 | Filling 100mm Thick Coarse Sand. As per direction of Engineer in charge. |
| 9 | Providing and Laying C.C. M 20 (1:1.5:3) lining etc. As per direction of Engineer in charge. |
| 10 | Brick on edge with M 150 Brick Laid Dry joints Sand filling including preparation of Base to Proper Slope and its Ramming including supply of all material, Labour and T&P required for proper completion of work. As per direction of Engineer in charge. |
| 11 | 12 mm thick Cement plaster work with 1:4 cement, coarse sand Mortar including cost of all material , labour T&P etc. As per direction of Engineer in charge. |
| 12 | Cement pointing Deep struck 1:2 cement Mortar including all cost of material , labour T&P etc . As per direction of Engineer in charge. |
| 13 | Laying c.c in 1:2:4 Mix with 10 to 20 mm size aggrgate , cement, and coarse sand including cost of all material etc. As per direction of Engineer in charge. |
| 14 | Providing and laying and replacing of R.C.C. pipe 150 mm dia ,including cost of all material etc. As per direction of Engineer in charge. |
| 15 | Earth Work in strengthening of bank, dowla, side filling of gul, back filling of head and tail wall including cost of all material etc. As per direction of Engineer in charge. |
| 16 | Earth Work in Clearance of syphon all Type of soil including all lead lift, Dressing T&P etc. complete. As per direction of Engineer in charge. Please Enable Macros to View BoQ information |