| 1 | Item code morth 301 Excavtion in soil using hydraulics excavator and tippers with disposal upto 1000 meters. Excavation for road work in soil with hydraulics excavator including cutting and loading in tippers, trimming bottom and side slopes in accordance witrequiremements of lines , grades and cross section and transportation to the embankment location within all lifts and lead upto 1000 meters |
| 2 | Cement Concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & plants etc reguired for proper complection of the work -UPPWD SOR /281/P-17 |
| 3 | M-150 brick work in 1:4 cement and Coarse sand of ( 2.20 fineness modulous) mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . UPPWD/SOR/303+(305) |
| 4 | 12 mm cement plaster of mix : 1:6 (1cement :6 coarse sand) UP PWDSOR-2020/DAR-18/13.4.2 |
| 5 | concrete with 2cm Guage Stone grit , Coarse Sand& Cement in the proportion of 4:2:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/279a/P-17 |
| 6 | Dry brick on edge flooring in required pattern with bricks of class designation of 150 on filling joints with Jamuna sand, with common burnt clay non modular bricks. (DSR-18/11.2) AR |
| 7 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Morth-401 |
| 8 | Providing and laying 80mm thick I.S.I Mark factory made cement concrete interlocking paver block made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of Coarse sand, filling the joints with fine sand and etc. all complete as per the direction of engineer in charge . with conforming to IS-15658 and IRC:SP:63. (AR) |
| 9 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works DAR- 18 /10.25.2 |
| 10 | Pumping out water by Diesel pump of discharge capacity of 4000 lts per hour including fuel operator , suction & delivery pipes of size 4'' X 4'' length 150 as per direction of Engineer in Charge |
| 11 | Supply of Good Earth work , banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per ( A.R. ) For all kind of soil. Construction of embankment with approved material obtained from borrow pits with all lift and leads transporting to site spreading ,grading to required slope and compacting to meet requirement of table 300-2 up to 5 km Morth 2019/3.16/305 |
| 12 | Demolishing dry brick or Intelocking Tiles on edge.including stacking serviceable material and disposas of unserviceable material with in 50 metres lead:UPPWDSOR/2020 |
| 13 | Providing and laying 80mm thick factory madecement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction and of approved size and design/ shape laid in required colour and pattern over and including 50mm thick compacted bed of course sand, filling the joints with coarse sand etc. all complete as per theBy Using old Tile (Labour Only) Please Enable Macros to View BoQ information |