END CONSTRUCTION ( ALARM END ) BHEL ELECTRIC FOR THREE PHASE MEMU/DMC1 C OACH, as per Drawing: EM15281 ALT.'i' & MDST102 REV.02, Packing Instruction: NO SPECIAL PACKING REQUIRED. THE PROTRUDING, THREADED PORTION, GAUGES AND LOOSE ITEMS ETC. IF ANY ARE TO B E PROTECTED WITH SUITABLE COVERING TO PREVENT IT FROM DAMAGE. HOWEVER TRANSIT DAMAG E IF ANY SHALL BE AT THE COST OF SUPPLIER. [ Warranty Period: 30 Months after the date of delive ry ] ]
2
END CONSTRUCTION ( ALARM END ) WITH BHEL ELECTRIC FOR THREE PHASE MEMU/DM C2 COACH, as per Drawing: EM15280 ALT.'i' & MDST102 REV.02, Packing Instruction: NO SPECIAL PAC KING REQUIRED. THE PROTRUDING, THREADED PORTION, GAUGES AND LOOSE ITEMS ETC. IF ANY ARE TO BE PROTECTED WITH SUITABLE COVERING TO PREVENT IT FROM DAMAGE. HOWEVER TRANSIT DA MAGE IF ANY SHALL BE AT THE COST OF SUPPLIER. [ Warranty Period: 30 Months after the date of d elivery ] ]
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.