|
| 1 | Wiring for light point/fan point/ Exhaust fan point with 1.5 sq. mm FR PVC insulated copper conductor single core cable in surface/recessed PVC conduit, with modular type switch,with suitable size PVC/MS box etc as required . |
| 2 | Wiring for circuit/submain wiring along with earthwire with the following sizes of PVC insulated copper conductor single core cable in surface/recessed PVC conduit as required 2x 1.5 sq.mm+ 1x1.5 sq.mm earth wire. |
| 3 | Wiring for circuit/submain wiring along with earthwire with the following sizes of PVC insulated copper conductor single core cable in surface/recessed PVC conduit as required. 2 X 2.5 sq. mm + 1 X 2.5 sq. mm earth wire |
| 4 | Wiring for circuit/submain wiring along with earthwire with the following sizes of PVC insulated copper conductor single core cable in surface/recessed PVC conduit as required. 2 X 4.0 sq. mm + 1 X 4.0 sq. mm earth wire |
| 5 | Supplying & fixing of following modular type switch/socket on the existing modular plate & switch box and including connection but excluding modular plate etc as required electronic fan regulator |
| 6 | Supplying and fixing following size/module,GI box along with modular base & cover plate for modular switches in recess etcas required 4/5 moduleI |
| 7 | Supplying and fixing following size/module,GI box along with modular base & cover plate for modular switches in recess etcas required. 8module |
| 8 | Supplying and fixing suitable GI box with modular plate and cover in front on surface or in recess ,including providing and fixing 6 pin 15/16 amps modular socket outlet and 15/16 amps modular switch, connection ,paintingetc as required, |
| 9 | Supplying and fixing suitable G.I box with modular plate and cover in front on surface/recess ,including providing and fixing 3 pin 5/6 amps modular socket outlet and 5/6 amps modular switch ,connection etc as required |
| 10 | Supply and fixing Batten /angle holder including connection etc as required. |
| 11 | Supplying and fixing following way ,single pole and neutral ,sheetsteel ,MCB distribution board ,240 volt on surface/recess complete with tinned copper bus bar ,neutral bus bar , interconnection powder painted etc as required .(but without MCB) |
| 12 | 6way ,Double door |
| 13 | Supplying and fixing following 240 volts C series ,miniature circuit breaker suitable for inductive loads of following poles in existing MCB DB complete with connection as required. 6/32 amps,Single Pole |
| 14 | Supplying and fixing following 240 volts C series ,miniature circuit breaker suitable for inductive loads of following poles in existing MCB DB complete with connection as required.6/32 amps,SPN |
| 15 | Supplying and fixing following 240 volts C series ,miniature circuit breaker suitable for inductive loads of following poles in existing MCB DB complete with connection as required.40 amps TPN |
| 16 | Supply and fitting of Bulk head fitting with 9/10 Watt CFL/LED complete with connection as required. |
| 17 | Supply,Installation ,testing and commissioning of following size ceiling fan 3 blades confirming to IS:374:2019 including wiring the down rods of standard length (upto 30 cm) with 1.5 sq.mm FR PVC insulated copper conductor as required.(for dinning hall) 1200mm (48”) Ceiling fan |
| 18 | Providing Lightning conductor final 25 mm diax300mm long,copper complete as required. |
| 19 | Fixing of lightning conductor final (single prong )with base plate including holes etc complete as required. |
| 20 | Providing lightning conductor tape 25 mm x 5mm (1.15Kg/mtr) |
| 21 | Fixing of copper/G.I tape 20mm x3mm thick on pararet or surface of wall for lightning conductor complete as required (forHorizontal run). |
| 22 | Fixing of copper/G.I tape 20mm x3mm thick on pararet or surface of wall for lightning conductor complete as required (for vertical run). |
| 23 | 50 mm dia Earthing Electrode 3 mtr Length & Backfill compound chemical 4 bag (per bag 25 Kg). |
| 24 | Supply of FR PVC insulated 3 core 4 sq.mm copper wire.(for connection of inverter line from Hno8 to 9) |
| 25 | Add GST @ 18% |
| 26 | Add LWF @1 % Please Enable Macros to View BoQ information |