| 1 | Site Clearence |
| 2 | Excavation in foundation in ordinary soil(loomclay or sand) including lift upto 1.50meter andlead upto 30 meter and including filling,watering and ramming of excavated earth intothe trenches or into the space between thebuilding and sides of foundation trenches orinto the plinth and removal and disposal ofsurface earth as directed by the E/I upto adistance of 30meter from the foundation |
| 3 | Plain cement concrete 1:4:8 nominal mix infoundation with crushed brick ballastaggregate 40 mm nominal size mechanicallymixed, placed in foundation and compacted byvibration including |
| 4 | Class 150 sub class-A brick work in 1:4Cement and fine sand of 1.25 F.M. Mortar insuper strucure as per analysis SI No.305 +SINo.309 for proper completion of work.Bottom DED FOR DOOR AND Windows |
| 5 | Laying R.C.C. work with 1:1.5:3 with coresand & 20mm stone gritt &alletc. SI NO 284APlinth,Lintel Beam Plinth,Lintel BeamCCCCCTOP Beam |
| 6 | Mild steel or Iron work in R.C.C. includingcutting at 1.25% of R.C.C. QTY SI NO 504 |
| 7 | 12 mm thick plaster 1:3 cement mortar &alletc. complete in walls SI NO 582Ded Door & Windosws, ventilator |
| 8 | Providing & Applying white cement and twocoat oil paint of average thickness I mm & allcomolte etc. Si No 23 NBO 18:57+18.57 (24) |
| 9 | Earth work filling for plimth area cartage eathwith 5km SI NO 253 |
| 10 | Supply & fixing of W.C 450x600 mm toiletseat as pre market rates |
| 11 | Supply & fixing of boring and handpump aspre market rates |
| 12 | S/F of Iron Door & windows with allnecessary item. |
| 13 | S/F of Wash Basin With all item |
| 14 | Flooring cement concrrete flooring in 1:2:4laid in one layer finished with a floating coutneat cement over 0.80 mm thickness baseconcrete SI No 601a |
| 15 | S&F 8mm thick wall tile and floor tile size300 mm x 300mm with base of cementmarbale 1;4 let over joint with gray cementslurry mixed pigment to match the sed of slabincluding rubbing and polishing . |
| 16 | Add water supply sanitary contibgencymisgexpress instalation including cost ofconstruction of sewage of estimeted cost. |
| 17 | Cement concrete with 4 cm gauge approvedstone ballast, approved coarse asnd andcement in proportion 6:3:1 in including supplyof material labour , T&P etc as reqired forproper completion of the work ,as the pre SINO-281 |
| 18 | Supply &Laying of 80mm thick interlockingcost of all labours matarial etc./sqm Cost |
| 19 | S/F sing Board |
| 20 | Add for Electrification including fans &alletc. comlette 5% at estimated cost. |
| 21 | Add for G.S.T. @ 18 % Please Enable Macros to View BoQ information |