| 1 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) not exc. 1.5 sq. m each, complete all as specified and as directed by Engineer-in-charge. |
| 2 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) exc 1.5 sqm but not exc. 4.0 sq. m each, complete all as specified and as directed by Engineer-in-charge. |
| 3 | Dismantling timber scantlings 40 sq. cm and over in section, in any position and in unframed work, complete all as specified and as directed by Engineer-in-charge. |
| 4 | Dismantling timber fillets, rails, posts, rafters, purlins, etc. under 40 sq. cm in section and in unframed work, complete all as specified and as directed by Engineer-in-charge. |
| 5 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, complete all as specified and as directed by Engineer-in-charge. |
| 6 | Demolition of Cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for, complete all as specified and as directed by Engineer-in-charge. |
| 7 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises, complete all as specified and as directed by Engineer-in-charge. |
| 8 | Dismantling Wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets, complete all as specified and as directed by Engineer-in-charge. |
| 9 | Demolition of reed, lathing, single or double, including battens and plaster or chicken wire lathing, complete all as specified and as directed by Engineer-in-charge. |
| 10 | Dismantling Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings, complete all as specified and as directed by Engineer-in-charge. |
| 11 | Dismantling wrought iron or mild steel work of any description not otherwise provided for, complete all as specified and as directed by Engineer-in-charge. |
| 12 | Surface dressing n exc 15 cm deep and getting out in soft/loose soil, complete all as per specified and as directed by Engineer-in-charge. |
| 13 | Excavation in post holes (or similar holes) each n.exc 0.5cum in soft/loose soil and getting out, returning filling in and ramming earth or broken rubble mixed with earth around in layers not exceeding 25cm, watering and removing of surplus soil to a distance n.exc 50 meters and making good surface, complete all as per specified and as directed by Engineer-in-charge. |
| 14 | Excavation in trenches n.exc 1.5m wide and n.exc 1.5 m in depth for foundation etc or for shafts, wells, cesspits, manholes, pier holes etc. and getting out in soft/loose soil complete all as per specified and as directed by Engineer-in-charge. |
| 15 | Returning, filling in, including spreading, leveling, watering and well ramming in layers n exc 25cm complete all as per specified and as directed by Engineer-in-charge. |
| 16 | Removing excavated material not exc. 50 m & depositing where directed at a level not exc. 1.5 m above starting point complete all as per specified and as directed by Engineer-in-charge. |
| 17 | M&L for Hardcore with broken stones/ boulders of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface, complete all as specified and as directed by Engineer-in-charge. Please Enable Macros to View BoQ information |
| 18 | M&L for Hardcore with broken stones/ boulders of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface, complete all as specified and as directed by Engineer-in-charge. Please Enable Macros to View BoQ information |