| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: Chief Construction Engineer, Kanupur Irrigation Project,Basudevpur,Dist-Keonjhar Name of Work:- \\"Construction of CAD & WM works of Balabhadrapur Minor & Ghuntaposi Sub-Minor Directly off taking from KMC at RD 28380M & 29020M respectively & Katalapasi Sub-Minor off taking from Balibhandha Minor at RD 1410M under Pani Panchayat No.21 & 22 of kanupur irrigation Project.\\" Contract No: CCE,KIP (KRC&BD)-01/2026-27 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER# NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # |
| 2 | Item Description |
| 3 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil including stony earth, gravel, moorum, etc. interspread with boulders up to 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per specification as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation etc. complete. |
| 4 | Supply and filling foundation and plinth with sand by mechanical, laying in layer duly compacted, including cost of watering, ramming with all leads,cost, carriage, roylty of materials, cost of labour cess And all cost incidental to work etc complete as per the specificaton and direction of the Engineer-in-charge. |
| 5 | Cement concrete (1:3:6) with 40mm size hard granite metal with watering and curing including cost,conveyance ,royalty of all materials ,labour ,T& P etc complete and as per the direction of the Engineer-in-Charge. |
| 6 | R.C.C. work of M-15 grade with 20mm down graded hard black granite CB chips with watering and curing excluding shuttering but including cost,conveyance ,royalty of all materials ,labour ,T& P etc complete as per direction of Engineer-in- Charge. |
| 7 | Providing formwork for concrete with F1 finish for upstream faces of dam,spillway,glacis of barrage,unexposed surface of foundation,block joints etc with steel shutters ,rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour,materialss and T & P complete as directed by the Engineer-in-charge. |
| 8 | Rigid and smooth centering and shuttering for C.C./R.C.C works including false works and dismantling them after casting including costof materials complete in ground floor.(A) For R.C.C foundation,plingth band and footing base of columns,mass concrete precast slabs etc. |
| 9 | Supplying, cutting, bending, binding & placing Uncoated HYSD bar reinforcement complete as per drawing and technical specification, including cost, carriage, royalty of all materials and labour etc. complete as per the direction of Engieer-in-charge. |
| 10 | Providing and laying RCC hume pipes of 300mm dia NP3 in position on properly prepared approved surface including cost, carriage, royality of humepipes and cost of labour etc complete as per the direction of the Engineer-in-Charge. |
| 11 | Filling foundation and plinth with excavated material with well compacted etc. complete as per the direction of the Engineer-in-charge. Total in Figures 68131332.57 68131332.57 Six Crore Eighty One Lakh Thirty One Thousand Three Hundred & Thirty Two and Paise Fifty Seven Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |