| 1 | Earth work in excavation by hydraulic/manual means over areas (exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. All kinds of soil |
| 2 | Soling: Dumping of Stone Including Cost of stone |
| 3 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 4 | Providing and fixing up to floor five level precast cement concrete solid block, including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete : 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). |
| 5 | 12mm cement plaster of mix : 1:4 ( 1 cement :4 fine sand) |
| 6 | Providing and applying white cement based putty of average thickness 1 mm of approved brand and manufacturer, over the plastered wall surface to prepare thesurface even and smooth complete |
| 7 | Finishing walls with water proofing cement paint of required Shade on New work (two or more coats applied @3.28 kg /10 sqm) over and includingpriming coat of exterior primer applied @ 2.20kg/10 sqm |
| 8 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture |
| 9 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including: of Steel gate complete job loading unloading of Steel gate 15 ft x 6ft size |
| 10 | Railing: Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. |
| 11 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil |
| 12 | Excavating, supplying and filling of local earth by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. |
| 13 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) Holes 60 cm dia and 60 cm deep. (Including Good Quality Plants as per directions of EIC) |
| 14 | Carriage of material by MT from source to site of work including loading, unloading complete job Cement & Steel ---------------5 Km |
| 15 | Carriage of material by MT from source to site of work including loading, unloading complete job Sand --------10 Km |
| 16 | Carriage of materials By Mechanical Transport including loading, unloading and stacking by MT for an avg of 20 Km a) stones Please Enable Macros to View BoQ information |