| 1 | Excavation in earth work and disposal of all excavated earth such as pick work, jumper work, blasting work in hard/ soft rocks, including dewatering in saturated soil upto all leads and lifts disposed earth to be levelled and neately dressed within all leads and lifts as per the direction of Engineer-in -Charge. |
| 2 | Excavation in drains and channel etc. in all classification of soil such as pick, spade, junper, blasting soft / hard rock etc. lift upto 1.50 metres stacking the excavated soil not more than 3.00 metres and then returning tha stacked soil in 15cm layers when required in plinth sides of foundation etc. consoildating each deposited layer by ramming, watering and then disposing of all surplus excavated earth : pick work & jumper work. |
| 3 | Providing form work with steel plates 3.15 milimetre thick welding with angle iron in frame 30x30x5 milimetre so as to give fair finish including centering, shuttering and propping etc. with wooden battens and ballies, height of propping and centring below floor to ceiling not exceeding four metres and removal of the same for in-situ-reinforced concrete and plain concrete work in:- |
| 4 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttresses, plinth and string courses and the like within all leads and lifts. |
| 5 | Flat surfaces such as soffits of suspended floors, roofs, landing and the like floor etc. up to 200 milimetres in thickness within all leads and lifts as per the direction of Engineer -in- Charge. |
| 6 | Providing and laying cement concrete 1 : 5 : 10 ( One cement : five sand : ten graded stone aggregate 40mm nominal size) with 15 % plum and curing complete excluding the cost of form work in retaining walls/ breast walls, the size of plums shall usually be 150mm to 300mm as per P.W.D. specification within all leads and lifts as per the direction of Engineer-in-Charge. |
| 7 | Providing and fixing of PVC Pipe for weep holes of 100 mm dia having pressure of 4.00 Kg/Cm square complete in all respect with in all leads and lifts as per Direction and to the entire satisfaction of Engineer-in -Charge. |
| 8 | Providing and laying cement concrete 1:4 :8 ( One cement : four sand: eight graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge. |
| 9 | Providing and laying cement concrete 1:2:4 (1 : Cement 2: Sand 4: Stone aggregate 20 mm Nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in :- |
| 10 | Foundation footing bases of pucca Main Kuhl. |
| 11 | In walls (any thickness but not less than 0.10 meter thickness) attatched pillasters. |
| 12 | Suspended floor roofs, landing and shelves and their support balconies, beams, girders, bressumers and contilever upto floor two level. |
| 13 | Providing mild / tor steel reinforcement for reinforced concrete work including bending, binding and placing in position complete in all respect with in all leads and lifts as per Direction and to the entire satisfaction of Engineer-in -Charge. |
| 14 | Wire crates of G.I. wire filled with boulders with square cut faces against the wire. (Wire crates to be measured and paid for separately) within all leads and lifts as per the Direction of Engineer-in-Charge. |
| 15 | Wire crates made of G.I. wire filled with boulders with square cut faces against the wire (Boulder filling to be measured and paid for separetaly) G.I. wire 5mm thick corresponding to SWG-6 15cm.x15cm. mesh.The size of crates 1.25×1.25×1.25 m with in all leads and lifts as per Direction of Engineer-in-Charge.. |
| 16 | TERMS AND CONDITIONS 1 The work shall be executed strictly in accordance with JSV/IRC and BIS satisfaction as per instructions of the Engineer-in-Charge 2 Nothing shall be paid to the contractor for rejected work/materials 3 The payment to the labourers will he made in the presence of Junior Engineer concerned a representative of Engineer-in-Charge 4 The work shall be executed with in stipulated period 5 Sill free sandstone aggregate of approved quarry shall be used 6 GST, Labour Cess and Security will be deducted from cach bill of the contractor as per Govt. rule 7. The following material required for execution of above work shall be supplied by the Department in Sub Divisional Store against proper indent on the rates Cement Rs. 475/- per bagSteel =m 65.25/KG Please Enable Macros to View BoQ information |