|
| 1 | Taking down cement plaster, from brick or stone walls etc including raking out joints, hacking for key, scrubbing down with water etc and removing unserviceable material,outside of A 1 defence land complete all as specified and directed. |
| 2 | Material and labour foe rendering 15 mm thick on other than fair faces of brick work or concrete walls internal surfaces in CM 1:6 finished to even & fair without using extra cement.complete all as specified and directed. |
| 3 | Material and labour for rendering 15 mm thick in CM 1:4 on fair faces of brick or concrete surfaces finishing even and smooth without using extra cement complete all as specified and as directed . |
| 4 | Material and labour for preparation of newly plastered surface of walls including corners and applying two coats of OBD over applying of 1 mm thick wall care putty finish wall surface even & smooth complete all as specified and directed. |
| 5 | Material and labour for preparation of newly plastered surface of external wall by application of 1mm wall care putty to remove the dent and to make the surface even and smooth by grinding or rubbing with sand paper all as prescribed by manufacture of paint and applying two coats of exterior emulsion paint over a coat of exterior water based primer of same make all as specified and prescribed by manufacture of paint and as directed at site complete all as specified and directed. |
| 6 | Material and labour for complete removal of existing treatment to wall and applying two coats of oil bound distemper over and including applying one coat of internal wall putty not less than 1mm thick on walls in any height complete all as specified and directed. |
| 7 | Material and labour for preparation of old plastered/ treated surfaces of wall and applying one coat of oil bound distemper including rubbing, brooming & washing old surfaces of walls complete all as specified and directed. . |
| 8 | Material and labour for preparation of old plastered/ treated surfaces of wall and applying two coats of oil bound distemper including rubbing, brooming & washing old surfaces of walls complete all as specified and directed. . |
| 9 | Material and labour for preparation old treated surfaces of walls and applying two coats of white wash complete all as specified and directed. |
| 10 | Material and labour for preparation old treated surfaces of ceiling and applying one coat of oil bound distemper complete all as specified and directed. |
| 11 | Material and labour for preparation old surfaces of ceiling and applying one coat of white wash complete all as specified and directed. |
| 12 | Material and labour for preparation of old decorated surfaces of wood and wood based materials, wooden, plastered, concrete surfaces of any descriptions not otherwise described over 10Cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed. |
| 13 | Material and labour for preparing old painted steel and Iron surfaces of any description over 10 cm width /girth and applying one coat of synthetic enamel paint of any tint complete all as specified and directed. |
| 14 | Material and labour for applying one coat of exterior emulsion weather proof using spray method/rollers of mechanical process (including rubbing, brooming & washing the surface) complete all as specified and directed. |
| 15 | Material and labour for complete removal of existing treatment of external wall and application of 1mm wall care putty to remove the dent and to make the surface even and smooth by grinding or rubbing with sand paper all as prescribed by manufacture of paint and applying two coats of exterior emulsion weather proof over a coat of exterior water based primer of same make all as specified and prescribed by manufacture of paint and as directed at site complete all as specified and directed.. |
| 16 | Material and labour for preparation of old decorated surfaces of walls and applying one coat of cement base paint in any tint complete all as specified and directed. |
| 17 | Material and labour for preparation of old decorated surfaces of walls and applying two coats of cement base paint in any tint complete all as specified and directed. |
| 18 | Material and labour for complete removal of floor surface by washing, rubbing down including cleaning of moulds, moss, efflorescent salts, trading oil, greasy spots etc and applying one coat of indigo paint complete all as specified and directed. |
| 19 | Demolition of cement concrete (un-reinforced) of any description as in chajja/sunshade and in any position not otherwise specially provided and including removing unserviceable material,outside of A 1 defence land complete all as specified and directed. |
| 20 | Material and labour for PCC (1:3:6) type C-1 (Using 20mm graded stone aggregate) , as in padding, roof kerb or in chajjas,round or chamfered on edges coping portion rounded chamfered on edge on roof chajjas finished even and smooth complete all as specified and directed. |
| 21 | Material and labour for removal of tree/ roots etc from chajja facia roof and wall, corner of wall including making good with cement mortar (1:3) etc complete all as specified and directed. Please Enable Macros to View BoQ information |