| 1 | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. (Any Petty Item required for proper completion of work will be provided by the contractor free of cost.) | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. (Any Petty Item required for proper completion of work will be provided by the contractor free of cost.) |
| 2 | Various Size of PCC Pole | Various Size of PCC Pole |
| 3 | Various Size of STP | Various Size of STP |
| 4 | Different Line Material (Conductor, ABC Cable, XLPE Cable, X-Arm,Channel, Insulator , G.I. Wire , Stay wire & Rod, Earth Rod, DB BOX, Fuse Set etc.) | Different Line Material (Conductor, ABC Cable, XLPE Cable, X-Arm,Channel, Insulator , G.I. Wire , Stay wire & Rod, Earth Rod, DB BOX, Fuse Set etc.) |
| 5 | Different Capacity DT( 250/100/63/25/16/10 KVA ) | Different Capacity DT( 250/100/63/25/16/10 KVA ) |
| 6 | Pilfer Unit , CT/PT Double metering unit . | Pilfer Unit , CT/PT Double metering unit . |
| 7 | Supply & Erection of Following Material of approved GTP as per RESPO manual and as per direction of JE incharge.: | Supply & Erection of Following Material of approved GTP as per RESPO manual and as per direction of JE incharge.: |
| 8 | Various Type of Clamp as Holding Clamp, F-Clamp, Suspension Clamp with N&B Etc. of Approval GTP as per RESPO manual and as per direction of JE incharge. | Various Type of Clamp as Holding Clamp, F-Clamp, Suspension Clamp with N&B Etc. of Approval GTP as per RESPO manual and as per direction of JE incharge. |
| 9 | I/D & O/D type Cable jointing kit Various Size | I/D & O/D type Cable jointing kit Various Size |
| 10 | Stay Insulator | Stay Insulator |
| 11 | Copper L-Piece | Copper L-Piece |
| 12 | Variuos Size Lug | Variuos Size Lug |
| 13 | G.I. pipe 6\\" Dia | G.I. pipe 6\\" Dia |
| 14 | Stone Pad | Stone Pad |
| 15 | Tailless unit 400 Amp | Tailless unit 400 Amp |
| 16 | Anti Climbing Device as per RESPO Norms ( with Barbed wire ) | Anti Climbing Device as per RESPO Norms ( with Barbed wire ) |
| 17 | Danger Board as per RESPO Norms. | Danger Board as per RESPO Norms. |
| 18 | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) |
| 19 | Single Pole Structure of Various Size PCC Pole | Single Pole Structure of Various Size PCC Pole |
| 20 | Single Pole Structure of Various Size ST Pole | Single Pole Structure of Various Size ST Pole |
| 21 | Double Pole Structure of Various Size PCC Pole | Double Pole Structure of Various Size PCC Pole |
| 22 | Double Pole Structure of Various Size ST Pole | Double Pole Structure of Various Size ST Pole |
| 23 | Stay Set | Stay Set |
| 24 | Laying of Various Size XLPE Cable as per RESPO manual and as per direction of JE incharge. | Laying of Various Size XLPE Cable as per RESPO manual and as per direction of JE incharge. |
| 25 | Laying of Various Size XLPE Cable (Different Size ) inside G.I. Pipe. | Laying of Various Size XLPE Cable (Different Size ) inside G.I. Pipe. |
| 26 | Laying, Sagging, Stringing, Binding and Jumpering etc. of Weasal/Racoon /DOG conductor on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. | Laying, Sagging, Stringing, Binding and Jumpering etc. of Weasal/Racoon /DOG conductor on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 27 | Laying, Sagging, Stringing, Binding and Jumpering etc. of Various size ABC Cable on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. | Laying, Sagging, Stringing, Binding and Jumpering etc. of Various size ABC Cable on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 28 | Grouting of Pole as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) | Grouting of Pole as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 29 | Grouting of Stay SET( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) | Grouting of Stay SET( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 30 | Muffing of S.T.P. as per RESPO Norms ( Require Material will be provided by Contractor ) | Muffing of S.T.P. as per RESPO Norms ( Require Material will be provided by Contractor ) |
| 31 | Mounting of D.T. (250/100/63/25/16/10 kva ) upon Double pole as per RESPO Manual. | Mounting of D.T. (250/100/63/25/16/10 kva ) upon Double pole as per RESPO Manual. |
| 32 | Construction of Plinth Suitable for 250 KVA T/F with material (Sand, Bricks, Cement) & T&P Labour as per respo manual. All meterial Cement, Sand , Blast Stone will be provided by the contractor. | Construction of Plinth Suitable for 250 KVA T/F with material (Sand, Bricks, Cement) & T&P Labour as per respo manual. All meterial Cement, Sand , Blast Stone will be provided by the contractor. |
| 33 | Fencing of T/F Plinth including material Labour & T&P as per respo manual. | Fencing of T/F Plinth including material Labour & T&P as per respo manual. |
| 34 | Chemical Earthing for for Neutral & Body as per RESPO Norms (All the material for earthing will be provided by the contractor) | Chemical Earthing for for Neutral & Body as per RESPO Norms (All the material for earthing will be provided by the contractor) |
| 35 | Deep Pipe Earthing of T/f Neutral as per Standard Specifications & as per RESPO Norms (All the material for earthing will be provided by the contractor) | Deep Pipe Earthing of T/f Neutral as per Standard Specifications & as per RESPO Norms (All the material for earthing will be provided by the contractor) |
| 36 | Installation of CT/PT unit as per RESPO Manual. | Installation of CT/PT unit as per RESPO Manual. |
| 37 | Installation & Grouting of Pilfer unit as per RESPO Manual. | Installation & Grouting of Pilfer unit as per RESPO Manual. |
| 38 | Cutting of Tree Branches for Clearness of Line. | Cutting of Tree Branches for Clearness of Line. |
| 39 | Dismantling of existing 33KV/11 KV/ L.T. line and removal of all accessories & fittings from poles, re-rolling of conductor and proper stacking and Cartage of dismantled conductor & accessories from site of work to DVVNL, Store. | Dismantling of existing 33KV/11 KV/ L.T. line and removal of all accessories & fittings from poles, re-rolling of conductor and proper stacking and Cartage of dismantled conductor & accessories from site of work to DVVNL, Store. |