| 1 | B/R PORTION:: Dismantling of single layer Mangalore Pattern roof tile laid dry complete all as specified and directed by Engr-in-Charge. |
| 2 | All as per item No 1 above but bedded in lime or cement mortar complete all as specified and directed by Engr-in-Charge. |
| 3 | Dismantling battens for tiles, shingles etc, of any size including tilting fillets spacing exc 15 CM complete all as specified and directed by Engr-in-Charge. |
| 4 | Dismantling timber scantlings 40 sq. cm and over in section, in any position unframed work complete all as specified and directed by Engr-in-Charge. |
| 5 | S&F Framed work such as roof trusses(framed), trusses purlins, crane gantries , rails and fastenings and heavy bracket framing(beam, tee, angle, channel or flat sections) including distance pieces, cleats etc Fe-410-W(Gde E-250) Quality A complete all as specified and directed by Engr-in-Charge. |
| 6 | S & F For 6 mm thick ms plates (plain or chequered) channels, square cut or notched (ordinary and counter sunk) forming holes, without any attachment etc. complete all as specified and directed by Engr-in-Charge. |
| 7 | Preparation of new or previously untreated surfaces of iron of any description over 10 cm in width or girth and applying two coats of synthetic enamel paint over and including a of red oxide primer complete all as specified and directed by Engr-in-Charge. |
| 8 | S & F For pre- painted galvalume aluminum zinc coating GI based corrugated steel sheet 0.50mm thick of an colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws etc. complete all as specified and directed by Engr-in-Charge. |
| 9 | S & F For Pre-painted galvalume aluminum zinc coating GI based Plain steel sheet 0.50mm thick of any colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws as in ridges, hips, valley, gutters etc.complete all as specified and directed by Engr-in-Charge. |
| 10 | M & L for false ceiling with 4mm thick designer 'E' board fixed on GI grid work with powder coated finish on exposed surface of size 0.6 x 0.6m consisting of GI angle supported on wall of size 24mm x 28 x 0.7mm main tee of size 24mm x38mm x 0.7mm, cross tee of size 24mm x 28mm x 0.7 mm using porpose made members interlocking to each other and with 3mm dia GI wire and making holes etc all as directed including two coats of white wash on ceiling after preparation of surfaces and as per manufacture instruction including taking down old ceiling complete all as specified and directed by Engr-in-Charge. Make of GI Grid work : Armstrong/Swastik/Techno Grid Make of 'E' board : Everest/Indian Gypsum/Armstrong or equivalent approved . |
| 11 | Dismantling boarding , any description in any position with nails complete all as specified and directed by Engr-in-Charge. |
| 12 | Dismantling water tanks and removing to store capacity exc 500 & n.exc 1000 ltrs complete all as specified and directed by Engr-in-Charge. |
| 13 | S&F For 1000 ltr. Capacity rotational moulded polyethylene water storage tanks cylindrical vertical with closed top) hoisted and fixed in position all as specified in SSR Part I complete all as specified and directed by Engr-in-Charge. |
| 14 | Disconnecting existing tanks, setting aside (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position.etc. complete all as specified and directed by Engr-in-Charge. |
| 15 | M&L 20mm bore dia ball brass valves, high pressure with polythene float and flynut complete screwed for iron pipe or brass ferrule complete all as specified and directed by Engr-in-Charge. |
| 16 | Demolition of cement concrete (un-reinforced) in roof/floors other than ground level beam, stair case, landing, chajjas and similar items including water proofing treatment in any layers and removal of debris to distance exceeding 250m and not exceeding 500m from the site complete all as specified and directed by Engr-in-Charge. |
| 17 | M&L for 40 mm thick , PCC 1:2:4 (Type B0 using 20 mm graded agg) as in levelling course to match the undulations of roof and in in coping , roof kerbs, fins including benching and sunken portion etc complete all as specified and directed by Engr-in-Charge. |
| 18 | M&L 10 mm thick cement screed in CM 1:3 mixed with water proofing compound of approved make over RCC roof slab and vertical surface ,finished even and smooth by using steel trowel complete all as specified and directed by Engr-in-Charge. |
| 19 | M&L for two coats of hot blown bitumen of any grade applied to concrete surfaces @ 1.5 kg/sqm per coats complete all as specified and directed by Engr-in-Charge. |
| 20 | M&L for APP based polymeric membrane minimum weighing not less than 3.6Kg/Sqm APP modified bitumen based prefabricted five layer water proofing membrane reinforced with non woven polyster matt black finished over compatible primer at 0.40 Ltr/Sqm of density at 25 degree centigrade 0.87-0.89 kg/ltr and viscosity 70-160cps or cold sticker and torch application of membrane with 10cm overlap both ways after preparation of surface complete all as specified and directed by Engr-in-Charge. |
| 21 | (a) Applying one coat of bituminous primer conforming to IS-3384 @ 0.70 Ltr per sqm. |
| 22 | (b) Laying of APP based membrane as specified thickness and weight. |
| 23 | (c ) Apply two coats of bitumanstic- aluminium paint over the membrane. |
| 24 | Taking up or down 15mm bore steel water tubing & connections, including cleaning for refixing or offering credit as per schedule of credit complete all as specified and directed by Engr-in-Charge. |
| 25 | All as per item No 21 above but 20mm bore |
| 26 | S&F 15mm bore medium grade galvanised steel water tubing with all fitting & fixed complete to walls or ceiling or laid in floors complete all as specified and directed by Engr-in-Charge. |
| 27 | S&F 20mm bore medium grade galvanised steel water tubing with all fitting & fixed complete to walls or ceiling or laid in floors complete all as specified and directed by Engr-in-Charge. |
| 28 | Refixing 15mm bore old steel water tubing & connection in new or old position of wall, ceiling, floor etc complete all as specified and directed by Engr-in-Charge. |
| 29 | All as per item No 25 above but 20mm bore. |
| 30 | M& L For Cutting chases, pinning in stone concrete black or slab , making good to facings where required and pointing in cement mortar 1:3 to ends or edges of landings, steps, cills, sunshades, shelves, lintels, etc.; and cutting chases for concealed water tubing or concealed conduit wiring, etc. and making good, cutting exceeding 10cm girth etc. complete all as specified and directed by Engr-in-Charge. |
| 31 | Demolition of block masonary , built in cement mortar including all quoins, aarches, pillars etc but excluding ashlar facings, dressed stone work and precast concrete articles complete all as specified and directed by Engr-in-Charge. |
| 32 | M&L precast solid block masonry of block 1:3:6 type C-1 wall exceeding 10 cm in width and built in cement mortar 1:6 complete all as specified and directed by Engr-in-Charge. |
| 33 | Taking down cement plaster on brick or stone walls or concrete surface etc including raking out joints, hacking for key scrubbing down with water complete all as specified and directed by Engr-in-Charge. |
| 34 | M&L rendering 15mm thick on stone masonary surfaces in CM 1:6 finished even and smooth in CM 1:6 complete all as specified and directed by Engr-in-Charge. |
| 35 | M&L Preparation of newly plastered or unplastered surfaces on wall surfaces and applying two coats of cement base paint over coat of chalk whitening complete all as specified and directed by Engr-in-Charge. |
| 36 | M&L Compound girders and stanchions, lattice girders, aerial masts, staging for water tanks and the like including caps, bases, splices etc. built up from two or more beam or channel sections or angles with plates, including all lattice bars, stiffeners, gusset plates,Fe 410-W (GdeE- 250) qualityA etc.complete all as specified and directed by Engr-in-Charge. |
| 37 | M&L Plain, black, mild steel sheeting 0.80mm , in ridges, hips, valley gutters, drip and straight flashings (length and girth as fixed) complete all as specified and directed by Engr-in-Charge. |
| 38 | E/M PORTION:: Taking down carefully copper/aluminium point wiring (light, fan,bell, socket or power) complete, including fixture and fittings such as switches, Ceiling rose, pendents, regulators, sockets, light fittings etc removing materials to store for keeping in safe custody or for taking credit and making good disturbed surfaces of walls, floors, etc . credit for above items should be made as per conditions separately complete all as specified and directed by Engr-in-Charge. |
| 39 | Taking down ceiling fans any type/sweep 230 V AC and refixing after cleaning and making connection complete all as specified and directed by Engr-in-Charge. |
| 40 | M&L for point wiring for light/fan/Bell with FRLSH cable 1.5 sqmm PVC insulated (red for phase and black for neutral) unsheathed, multi stranded copper conductor 1100 volt grade in and incl not less than 2mm thick PVC casing/caping with all accessories and 1.50 sqmm green in colour PVC copper conductor cable for earth continuity connected to common earth dolly incl PVC box surface type with PVC modular white cover plate for mounting fittings such as switches, sockets, fan regulators etc complete all as specified and directed by Engr-in-Charge. for one light/fan /bell point controlled by one switch & making good to disturbed surface of wall etc . |
| 41 | S & F in replacement ceiling rose, 3 phase PVC/polycarbonate isolated body, surface bakelite 65 x 50 mm, 3 terminal incl PVC square block complete all as specified and directed by Engr-in-Charge. Please Enable Macros to View BoQ information |