| 1 | Safe Carriage of following materials from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. |
| 2 | S.T. Pole 11 mtr long |
| 3 | PCC Pole 11 mtr long |
| 4 | PCC Pole 8.5 mtr long |
| 5 | Other loose line materials with including conductor, PVC Cable, Single and double Pole accessories, complete stay & earthing, insulator, Channel, S/S Angle etc. from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. |
| 6 | Diff. Conductor for 11 KV Line |
| 7 | Three Phase A.B. Cable of diff. size |
| 8 | LT PVC Cable size 1x120 sq mm |
| 9 | 11 KV XLPE Cable of size 3x70 sqmm |
| 10 | O/D Cable Jointing kit 3x70 sqmm |
| 11 | Safe Carriage of following T/F from Elec. Store Center Unnao to diff. work dump site along with loading unloading and propoer stocking. |
| 12 | T/F 100 KVA 11/0.4 KV |
| 13 | Dismantling of existing old Pole and X-arms, brackets, Insulators, Channels and all hardware fittings. |
| 14 | Erection of STP Single Pole (11 KV) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 15 | Supply & Fixing of following materials for above job- |
| 16 | 11 KV F-Clamp with N&B |
| 17 | Cross Arm Holding Clamps |
| 18 | Erection of PCC 11 Mtr Single Pole (11 KV) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 19 | Supply & Fixing of following materials for above job- |
| 20 | 11 KV F-Clamp with N&B |
| 21 | Cross Arm Holding Clamps |
| 22 | Erection of New STP Double Pole (11 KV Line) below the existing 11 KV Line including digging of pits, fitting of all accessories (Top & Dropper Channels, X-arm, F-clamp, insulators etc. as required for existing single/double Ckt HT Line) along with cartage & dragging from dump site to pit site including all associated work. |
| 23 | Supply & Fixing of following materials for above job- |
| 24 | Clamp for Top and Dropper channel with N&B |
| 25 | 11 KV F-Clamp with N&B |
| 26 | Cross Arm Holding Clamps with N&B |
| 27 | Erection of STP Double Pole (By put up a new STP adjacent to existing STP) below the existing 11 KV Line including digging of pits, fitting of all accessories (Top & Dropper Channels, X-arm, F-clamp, insulators etc. as required for existing single/double Ckt HT Line) along with cartage & dragging from dump site to pit site including all associated work. |
| 28 | Supply & Fixing of following materials for above job- |
| 29 | Clamp for Top and Dropper channel with N&B |
| 30 | Cross Arm Holding Clamps with N&B |
| 31 | Erection of New STP Double Pole (11 KV Line) at newly constructed 11 KV Line including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site including all associated work. |
| 32 | Supply & Fixing of following materials for above job- |
| 33 | Clamp for Top and Dropper channel with N&B |
| 34 | Erection of New PCC 11 Mtr Double Pole (11 KV Line) at newly constructed 11 KV Line including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site including all associated work. |
| 35 | Supply & Fixing of following materials for above job- |
| 36 | Clamp for Top and Dropper channel with N&B |
| 37 | Fixing of 11 KV D.O. Fuse Set at Double Pole with D.O. Fuse mounting Channel, clamps and nut & bolts including all associated work. |
| 38 | Supply & Fixing of following materials for above job- |
| 39 | 11 KV D.O. Fuse Set |
| 40 | D.O. Fuse mounting Channel |
| 41 | Clamp for mounting Channel with N&B |
| 42 | Construction of masonry type T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.5 mtr x 1.5 mtr x 1.5 mtr (LxBxH) solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth as per RESPO norms. (All the material will be arranged by the contractor) |
| 43 | Mounting of following Transformer on double pole/newly constructed T/Fs Plinth including its cartage and dragging from dump site to pit site & installation and commissioning of T/Fs and All the jumpering & connection with the system are included in the scope of work. (All the required materials as 08/12 nos.-Al. Lugs as required for each T/F, Nut & bolts for S/S Angle etc for this job shall be provided by contractor except T/Fs, LT PVC Cable & MS S/S Angle) |
| 44 | T/F 100 KVA |
| 45 | Supply & Fixing of following materials for above job- |
| 46 | Copper L-piece of appropriate size @ 04 nos. for each T/F |
| 47 | Insulated Lead of Single Core Al. Cable of size 25 sqmm for HT side connection @ 30 mtr for each T/F |
| 48 | Supply & Fixing of LT Fuse Set Protection Unit for 100 KVA DT SMC Box (All the required materials as Al. Lugs, Clamps, N&B etc. for above job shall be provided by contractor) |
| 49 | Laying of LT PVC Cable of size 1x120 sq mm from Transformer to LT Fuse Unit system including all associated work. (All the required materials for above job shall be provided by contractor except LT PVC Cable) |
| 50 | Earthing of Neutral of Transformer & Transformer body by way of boring and lowering of ‘B’ class G.I. Pipe 1.5” dia from ground up to the water level (Minimum 40 ft. Deep) with a solid cone at the lower end of G.I. pipe. Connecting and bringing out contineous G.I. Strip size 32X5 mm. from the cone to the ground surface where it will be connected with G.I. pipe clamp from which Transformer neutral & Body connection being done by G.I. Strip as per RESPO norms . (All the material will be arranged by the contractor) |
| 51 | Fabrication and erection of Distribution Transformer fencing around Transformer with 01 nos. gate & locking arrangement including cost of M.S. Angle size 40x40x5 and M.S. Flat size 25x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting of two coats of paint in iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil & dust as per RESPO norms. (All the material will be arranged by the contractor) |
| 52 | Erection of PCC Pole (LT Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 53 | Supply & Fixing of following materials for above job- |
| 54 | Suspension Clamp for ABC |
| 55 | Dead End Clamp for ABC |
| 56 | Eye Hook |
| 57 | L.T. Clamp with Nuts & Bolts |
| 58 | Piercing Connector |
| 59 | Making T-off arrangement including fabrication & fitting of accessories. |
| 60 | Supply & Fixing of following materials for above job- |
| 61 | Holding clamp for T-off Channel with N&B |
| 62 | Grouting of PCC/ST Pole as per RESPO Norms with grouting materials. |
| 63 | Making of Pole Plinth (Muffing) as per RESPO Norms (All the required materials for above job shall be provided by contractor) |
| 64 | Earthing as per RESPO Norms. |
| 65 | Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials. |
| 66 | Supply & Fixing of following materials for above job- |
| 67 | Stay Clamp with N&B |
| 68 | Stay Insulator |
| 69 | Laying stringing and sagging of O/H 11 KV Line Three Phase by diff. Conductor including all associated work with joint/jumpers and binding of insulator as required. |
| 70 | Supply & Fixing of following materials for above job- |
| 71 | P.G. Clamp |
| 72 | Laying of O/H 11 KV XLPE Cable of size 3x70 sq mm including all associated work with joint/jumpering as required. (All the required materials for above job shall be provided by contractor except 11 KV XLPE Cable size 3x70 sq mm) |
| 73 | Fixing of O/D Jointing Kit for 11 KV XLPE Cable size 3x70 sq mm with complete all work as required. |
| 74 | Commissioning of 11 KV XLPE Cable of size 3x70 sq mm including jumpering with the system. (All the required materials for above job shall be provided by contractor) |
| 75 | Laying stringing and sagging of O/H Three Phase L.T. Line by ABC of diff. size including all associated work with joint/jumpers and binding of insulator as required. |
| 76 | Supply & Fixing of following materials for above job- |
| 77 | Suspension Clamp for ABC |
| 78 | Dead End Clamp for ABC |
| 79 | Eye Hook |
| 80 | L.T. Clamp with Nuts & Bolts |
| 81 | Piercing Connector |
| 82 | Fixing of 3-Ph. Distribution Box with clamp, N&B with complete all work as required. (All the required materials as DB Box Clamps, Piercing Connectors, Nut & bolts etc for this job shall be provided by the contractor except Distribution Box) |
| 83 | Supply & Fixing of following materials for above job- |
| 84 | Clamp for Distribution Box with nut & bolt |
| 85 | Piercing Connector |
| 86 | Chopping of Tree Branches falling on the line Please Enable Macros to View BoQ information |