| 1 | Supply of Material |
| 2 | TOP/T-OFF/DROPPER/FUSE SET/GUARDING ANGLE Clamp |
| 3 | Stone Pad 300 X 300 X 75 mm. |
| 4 | PG clamp for Dog Conductor. |
| 5 | Number Plate |
| 6 | LT CLAMPS |
| 7 | Dead End Clamp For End & Turning |
| 8 | IPC Connector For DB |
| 9 | Mid Span Jointer |
| 10 | Eye Bolt |
| 11 | PG clamp for ACSR Weasel |
| 12 | Danger Board with Clamp. |
| 13 | Bolts, Nuts and washers. |
| 14 | Aluminium Tape |
| 15 | Aluminium Binding Wire |
| 16 | Jointing Sleever for ACSR Weasel |
| 17 | Stay Clamp |
| 18 | Suspention Clamp |
| 19 | F Bracket |
| 20 | Aluminium paint. |
| 21 | Red oxide paint. |
| 22 | Erection of Works |
| 23 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 8.5 meter PCC Pole Single pole HT Line with complete fitting as per respo norms. (This work includes grouting and earthing of pole) |
| 24 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 8.5 meter PCC Pole Single pole LT Line with complete fitting as per respo norms. (This work includes grouting and earthing of pole) |
| 25 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 8.5 meter PCC Double Pole in HT Line with complete fitting as per respo norms. (This work includes grouting and earthing of pole) |
| 26 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 30-70 K.M.) and unloading, errection of 11 meter STP Single Pole with complete fitting as per respo norms.(This work includes grouting and earthing of pole) |
| 27 | Safe Loading, unloading and carriage from store to work site of other line Matching Materials and Accessories |
| 28 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site (Distance 10-70 K.M.) of ACSR weasel conductor. |
| 29 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site (Distance 10-70 K.M.) of ACSR Rabit conductor. |
| 30 | Stringing and Sagging of three phase 11 KV Line on 8.5 meter PCC Pole with ACSR Raibit conductor and binding with insulator. |
| 31 | Stringing and Sagging of three phase 11 KV Line on 8.5 meter PCC Pole with ACSR weasel conductor and binding with insulator. |
| 32 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site and laying & Hanging (Distance 30-70 K.M.) of LT Cable 3*50 sqmm |
| 33 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site and laying & Hanging (Distance 30-70 K.M.) of LT Cable 4*25 sqmm |
| 34 | Painting work of STP 11M with Alluminium & Red Oxide paints |
| 35 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site and laying & Hanging (Distance 30-70 K.M.) of L T ABC CABLE 3X95 sqmm. |
| 36 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site and installation work (Distance 30-70 K.M.) of 3 Phase distrubution box |
| 37 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site and installation work (Distance 30-70 K.M.) of 1 Phase distrubution box |
| 38 | Cutting of tree branches of the construction of 11 KV and LT lines. |
| 39 | Construction of pilinth for 250 KVA Transformer size 1.5*1.5*1.75 Meter with materials (All Material Provide by Contractor) |
| 40 | Dismentaling of Old Pole |
| 41 | Line shifting in old cable disconnection & reconnection |
| 42 | Fancing around the pilinth 2X2X1.5 Meter with gate (All Material Provided by Contractor) as per respo norms |
| 43 | Safe carriage of following capacity Transformers from Old Site To New Site and mounting at double pole with energization as per respo norms. |
| 44 | 10 KVA |
| 45 | 25/63 KVA |
| 46 | 250 KVA |
| 47 | Two No. Earthing at each 250 KVA T/F pipe Earthing (All Material Provide by Contractor) |
| 48 | Supply and instalation of Tailless unit each 250 KVA T/F |
| 49 | Complete stay grouting and nozzaling as per respo norms. (All material providing of contractor) |
| 50 | Old Recived back material work site to Store Center Chilbila Pratapgarh |
| 51 | Iran scrap |
| 52 | AB CABLE |
| 53 | Weasel Conductor |
| 54 | Rabbit Conductor Please Enable Macros to View BoQ information |