| 1 | Earth work in excavation of foundation in hard soil within initial lead and lift including rough dressing and breaking clods etc. complete. including dressing and levelling the bed not exceeding 1.50m depth and Depositing the Soil within initial lead of 50m & as per specification approved by the Department. |
| 2 | Providing filling foundation and plinth with sand well watered and rammed with all leads and lifts including cost , conveyance, royality of materials labour . T & P etc. complete as per direction of Er. In Charge. |
| 3 | Cement concrete (1:3:6) with 4cm size hard granite metal of approved quality and approved quarry in foundation including hoisting laying concrete with cost conveyance of materials including watering, curing, royality all T & P required for the work etc. complete as per direction of the Er. in charge. |
| 4 | C.C.(1:2:4 ) using 12mm HGCB chips of approved quality from approved quarry incl. hoisting, laying concrete in layers not exc. 15cm thick, compacting by means of vibrator, curing, finishing the exposed surface smooth, dewatering, shoring, shuttering etc, complete. |
| 5 | RCC work M-25 grade using 20mm down graded size black hard broken granite chips of approved quality from approved quarry including including hoisting lowering, laying concrete watering and curing for 28 days centering shuttering if required and finishing the exposed surface smooth including cost, conveyance, royalties and all taxes of all materials and cost of all labour with T&P required for the works etc. complete as per specification and direction of Engineer-in-charge. |
| 6 | a) Column Base |
| 7 | Ground floor |
| 8 | B) Column and Beam |
| 9 | Ground floor |
| 10 | First Floor |
| 11 | C) Plinth Beam |
| 12 | Ground floor |
| 13 | D) Lintel |
| 14 | Ground floor |
| 15 | First Floor |
| 16 | E) Chajja and shelves |
| 17 | Ground floor |
| 18 | First Floor |
| 19 | F) Roof Slab |
| 20 | Ground floor |
| 21 | First Floor |
| 22 | (G) Stair case |
| 23 | Ground floor |
| 24 | First Floor |
| 25 | K.B. Brick masonary in cm (1:6) with of approved quality from approved quarry including splays cutting, circular moulding with cost, conveyance of materials including royality, labour, T & P required for the work etc. complete. as per direction of Er. In Charge. |
| 26 | A) Foundation and Plinth |
| 27 | Ground floor |
| 28 | B) Superstructure |
| 29 | Ground floor |
| 30 | First Floor |
| 31 | Providing HYSD bar reinforcement for R.C.C. work including Straightening, cutting, bending, binding, welding, tying the grills, laying and placing in proper position as per approved design and drawing including cost, conveyance of 18 to 20 gauge binding wire cost and conveyance of HYSD bars complete in all respect as per specification for road & Bridge and direction of Eng - in Charge. |
| 32 | Ground floor |
| 33 | First Floor |
| 34 | 20mm thick grading plaster (1:4),finished smooth over roof slab after cleaning the surface incl.watering, curing etc. complete with cost, conveyance, royalties & taxes of all materials, labour and T&P etc complete as per the direction of E.I.C.. |
| 35 | First Floor |
| 36 | 12mm thick cement plaster (1:6) for brick work after racking out joints incl.watering, curing etc. complete with cost, conveyance, royalties & taxes of all materials, labour and T&P etc complete as per the direction of E.I.C.. |
| 37 | Ground floor |
| 38 | First Floor |
| 39 | 16mm thick cement plaster (1:6),finished smooth to brick work after cleaning the surface incl.watering, curing etc. complete with cost, conveyance, royalties & taxes of all materials, labour and T&P etc complete as per the direction of E.I.C.( A/R P/105 i |
| 40 | Ground floor |
| 41 | First Floor |
| 42 | Cement washing one coats with approved paint incl. cost of all material, labour and T&P etc. complete. |
| 43 | Ground floor |
| 44 | First Floor |
| 45 | Painting 2 coats with weather seal coat etc complete. (A/R 2006, Pg-99, item no-20) |
| 46 | Ground floor |
| 47 | First Floor |
| 48 | Finishing wall surface with Acrylic wall putty (water based) of approved make and finish smooth and even surface to receive painting including cost of all materials labour T&P etc complete. |
| 49 | Ground floor |
| 50 | First Floor |
| 51 | Distempering two coats with approved shade incl. cost of all material, labour and T&P etc. complete. |
| 52 | Ground floor |
| 53 | First Floor |
| 54 | Supplying fitting and fixing vitrified tile in floors of size 600mmx600mm of approved make with application of polymer modified cement based water resistant adhesive bed of required thickness of 10mm and filling joints with epoxy grout of approved quality including cost of all materials, labour T&P etc.required for the work. |
| 55 | Ground floor |
| 56 | First Floor |
| 57 | Fixing tiles in dados, skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of vectrified tile. |
| 58 | Ground floor |
| 59 | First Floor |
| 60 | Supplying, fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc. with cost conveyance, taxes of all materials labour, T&P etc. required for the complete in all respect. |
| 61 | Ground floor |
| 62 | First Floor |
| 63 | Providing and fixing 32 mm thick flush Door shutters conforming to IS:2002 (part I) decorative type,core of block board construction with frame of 1st class hard wood and well match teak 3 ply veneering with verical grains or cross bands and face veneers on both face of shutters inclusive of 4 Nos of stainless steel Butt Hinges (100mm x 60 mm x 2.5mm) 40 mm stainless steel screws, cylindrical lock (Godrej-9843), TowerBo;t SS Screw,teak wood lipping arround the edge & paste with 1.5mm thick laminate on both side of the flush Door,etc including the cost of all materials,hardwae fittings , cost of all labour,conveyance,loading, unloading, T&P , etc complete as per direction of Engineer-in-charge. |
| 64 | Ground floor |
| 65 | First Floor |
| 66 | Supplied and fitting and fixing of Unplasticised Polyvinyl Chloride (UPVC) (FENESTA,/NCL VEKA LTD) . Three track -three panel sliding window -60- Series duly manufactured using UPVC reinforced profiles of 108 mm x 45mm x 2.5 mm for outer frames and window sash of 39 mm x 58 mm x 2.5 mm capable of muntingg single glazing system, structurally reinforcd with hot dip galvanised upto 50 mocrons of minimum thickness of 1.50 mm prefabricated & welded through fusion welding the window frame shall be fitted with 6mm thick clear tougherned glass of SAINT -GOBAIN make duly fixed with EPDM weathering seal resistant and the system is to be installed using Reinforced large Coupler at the site using anchor fasteners, sillicon rubber sealant, easy glazing/ deglazing at site etc., incluiding cost & conveyance of all materials, accessories, labour charges, materials and product conforming to ASTM D- 638-14, EN-477-95 and others applicable codes and standreds. |
| 67 | Ground floor |
| 68 | First Floor |
| 69 | Providing, fitting and fixing of Ventilator of approved made to be fabricated from roll formed section made of prepainted steet etc. complete excluding the cost of Iron fittings and cost of all labour with T&P required for the work etc.complete as directed |
| 70 | Ground floor |
| 71 | First Floor |
| 72 | Providing Grills of M.S.shuttes for doors and windows including fitting fixing etc.complete..etc complete |
| 73 | Ground floor |
| 74 | First Floor |
| 75 | Labour for fitting fixing of Ms doors and windows etc complete |
| 76 | Ground floor |
| 77 | First Floor |
| 78 | Synthetic enamel paint with Priming one coat with approved Red Oxide Primer on Steel work |
| 79 | Ground floor |
| 80 | First Floor |
| 81 | Providing & applying of pre constructional anti-termite treatment by drilling 12mm dia holes at distance of 30cm @ junction of wall & floor about 300mm apart deep enough to reach the soil below & chemical emulsion (PREMISE, IMIDACHLOPRIED 30.5SC OF BAYER MAKE mixed with 47.5ltr water) pumped these holes to soak the soil @ 1 ltr solution of each hole as per manufactures specification & the holes should be pluged the filling materials including cost of all materials, labour,conveyance, T&P , all taxes and hire charges of machinaries as per direction of Engineer-in-charge. |
| 82 | Ground floor |
| 83 | Providing & laying of 60mm thick factory made cement concrete interlocking paver block of M-30 grade & approved make, varity, colour & size made by Block making machine with strong vibratory compaction of approved design & shape laid in required colour & pattern over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete including cost, Conveyance, royalty, taxes of all materials, labour T&P etc, complete as per direction of Engineer-in-charge. (referring C.P.W.D analysis of rate Page-1000 |
| 84 | supplying fitting and fixing of openable UPVC doors with door frame of approved make with 6mm thick glass of approved quality complete with frame, shutters and all fitting and fixtures. |
| 85 | Ground floor |
| 86 | First Floor |
| 87 | Earthwork in ordinary soil per 100 cum. (AOR 2006, Pg-1 (item no 1a) ) |
| 88 | E.I. Items |
| 89 | Recessed wiring to light point/fan point/ exhaust pont/ call bell pont with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked with 20 mm dia non-metalic PVC flexible conduit with 5 Amp,one way modular switch ISI marked and ceiling rose ISI marked mounted on Modular G.I. box having front bakelite cover of suitable size , MS box with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in Charge. ( Make of wire - Polycab/Finolex/ L&T / Anchor / Havells / V Guard/ KEI/ Great White) Modular Type -do- (Gr.A) (1.1.1-1.24.2) |
| 90 | -do- (Gr.B) (1.1.2-1.24.2) |
| 91 | -do- (Gr.C) (1.1.3-1.24.2) |
| 92 | S/F of M.S. Box for 2 Module 18 swg |
| 93 | S/F of M.S. Box for 4 Module 18 swg |
| 94 | S/F of M.S. Box for 6 Module 18 swg |
| 95 | S/F of M.S. Box for 8 Module 18 swg |
| 96 | S/F of M.S. Box for 12 Module 18 swg |
| 97 | S/F of 3 pin 5/6 A.F.T switch and.Socket on existing board (Modular type) (1.25.1+1.25.4) |
| 98 | S/Fof 6 module M.S. Box with Bakelite cover (Modular Type) on surface or in recess including providing and fixing of 2 nos 3 pin 5/6 amp. Socket out let 5/6amp. Piano type modular switch,connection,painting etc. as required (1.24.4 +2 x (1.25.1+1.25.4) |
| 99 | S/F of Power point with 4 modular metal box with modular base & cover in recess including providing and fixing of 6 pin 15/16 amp. piano type Modular switch & Socket, connection, painting etc as required(1.24.2+1.25.5+1.25.5) |
| 100 | S/F of Power point with 4 modular metal box with modular base & cover in recess including providing and fixing of 6 pin 15/16 amp. piano type Modular switch & Socket, connection, painting etc as required(1.24.2+1.25.5+1.25.5) for Inverter Connection |
| 101 | S/F of A.C.Starter 20Amp with 2 module Box.(Make Havells/Equivalent) |
| 102 | S/F of 15A Socket on 2 module for AC |
| 103 | S/F of computer board consisting of 3 nos. of 5 amp modular plug and modular switch and 1no. Of 6 amp Mini MCB, complete with wiring on 12 modular type M.S.box with modular cover. |
| 104 | Wiring for circuit/sub main alongwith earth wire with following sizes of PVC insulated single core multistrand copper conductor with ISI marked conforming to IS-694/1990 in 20 mm dia non metallic heacy duty flexible conduit 1.6 mm in recessed PVC conduit as required (make of wire-Polycab/Finolex/L&T/Anchor/Havels/V-Guard/ KEI/Great White).2x1.5 sqmm + 1 x 1.5 sqmm( 1 .8.1) |
| 105 | -do- 2 x 2.5 sqmm + 1 x 1.5 sqmm (1.8.2) |
| 106 | -do- 2x4 sqmm + 1 x 1.5 sqmm (1.8.3) |
| 107 | -do- 2x6 sqmm + 1 x 2.5 sqmm (1.8.3) |
| 108 | Inverter wiring (1x1.5smm) Copper wire (1.19.1) |
| 109 | S/F of 5 to 32 Amp rating 240 Volt B series MCB for lighting and other loads in the existing MCB Distribution Board ISI marked complete with connection, testing and commissioning etc. as required (2.6.1) |
| 110 | S/F of C series DP MCB of 5 - 32A amp rating (As per direction of engineer in charge) 240Volt for lighting and other loads in the existing Distribution board ISI marked complete with connection, testing and commissioning etc. as required (2.6.2a)Make L&T/Equivalent |
| 111 | S/F of 63A ICDP main switch with MS box of 250mmx300mmx60mm deep ( (2.15A)+(1.24.16 ) |
| 112 | S/F of MCB 8 Way Double Door (2.3.6) |
| 113 | S/F of Call bell/Buzzer(Ding dong type) ISI marked suitable for DC/AC single phase 230 volts complete as required. (1.30) |
| 114 | S/F of batten holder BK angle holder ISI marked including connection etc. insulated of ceiling rose(1.29- 1.28) |
| 115 | Earthing with G.I. Earth pipe 3 mtr Long 40mm dia ISI marked including accessories & providing masonary enclosure with cover plate having locking arrangement & watering pipe with charcoal & salt as required (3.2) |
| 116 | Supply & laying 6 SWG G.I. wire in recess for loop earthing as required (3.17) |
| 117 | S/F of 1200mm A.C. Ceiling fan (1Star) with all accessories and connections with out fan regulator (Make:Usha-Striker One/ Neo/ Crompton- highspeed/ Havells-Samrat ES/ Anchor- Turbo Speed Star/Orient-Summer Breeze Pro/ Great White-ALDOUS/ Pollycab-Vital HS) |
| 118 | S/F of Fan hook S, Type on ceiling. |
| 119 | S/F of step type modular fan regulator |
| 120 | Supply of instalation, Testing commissioning of 13 Watt. LED bulb |
| 121 | S/F of 300 Exhaust fan with all accessoriesand connections (Make Usha-Aero Clean Plus DBB/ Polycab-Fresh on DBB/ Cropmton-Trans Air12\\" reversible/ Havells-Ventil Air DS(HS)/ Anchor-Anmol Delus R/ Orient-Power Flow DBB |
| 122 | S/F of 10 Watt Bulk Head (Make-Havells) |
| 123 | S/F of 18-25 wt. LED single strip tube. Light fittingwith all accessories & connection (make Havels/HPL/Crompton/Polycab/PAC) |
| 124 | Supply & Fixing of 60 Watt single L.E.D street light fitting with LED & Electrinic driver including all accessories and connections (Make:Crompton/ Phillips/ HPL/ Polycab/Havells) |
| 125 | S/F OF 900 VA Invertor with 1 no 180Ah Battery with Trolly Arrangement (Luminous/ Microtek/ Excide) |
| 126 | PH Items |
| 127 | Supplying all materials labour T&P and filling F&P with river sand well watered and rammed including conveyance of all materials to worksite,payment of royality,taxes etc. all complete as per the direction of E.I.C. |
| 128 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C. |
| 129 | (a)110mm dia pipe |
| 130 | (b)75mm dia pipe |
| 131 | (c)110mm dia Door cross Tee |
| 132 | (d)110mm dia Door Tee |
| 133 | (e)110mm dia P Trap |
| 134 | (f)110mm dia Plain Trap |
| 135 | (g)110mm dia Door Bend |
| 136 | (h)110mm dia Offset |
| 137 | (i)110mm dia Plain bend |
| 138 | (j)110mm dia cowl |
| 139 | (k)75mm dia plain Tee |
| 140 | (l)75mm dia Door bend |
| 141 | (m)75mm dia plain Bend |
| 142 | (n)125mm dia CP Grating |
| 143 | Supplying all materials labour T&P and fixing wash down water closet (Anglo Indian water closet)with integral S or P trap to the floor with wooden plug and chromium plated crews including jointing the trap with soil pipe in cm(1:1)etc. all complete as per specification and direction of E.I.C. |
| 144 | (a)E.W.C. with S Trap with sheet cover(make- parryware) |
| 145 | Supplying all materials labour T&P and fixing water closet,squatting pan(Indian type WC. pan/Orissa pattern squatting pan) duly embedded in cc(1:5:10)using 4cm hg. metal all complete as per the direction of E.I.C. |
| 146 | (a)580mm Orissa pan(make- parryware) |
| 147 | Supplying all materials,labour,T&P and fixing kitchen sink with hole for pillar taps with CI/MS brackets painted white including holes in walls and making good the damages etc. all complete as per P.H. specification and direction of E.I.C. |
| 148 | (a)600mmx450mmx200mm Steel sink with 40mm dia CP west,west pipe and brackets.(Mousumi make) |
| 149 | Supplying all materials,labour,T&P and fixing wash basing with hole for pillar taps with CI/MS brackets painted white including holes in walls and making good the damages etc. all complete as per P.H. specification and direction of E.I.C. |
| 150 | (a)550mmx400mm W.H.B. with 32mm dia CP west, west pipe,brackets and connection pipe .(make- parryware) |
| 151 | (b)Pedestrial for W.H.B. (make- parryware) |
| 152 | Supplying all materials,labour T&P and fixing mirror of superior glass mounted on 6mm thick AC sheet or plywood sheet and fixing to wooden plugs with CP screws and washers complete as per PH specification and direction of E.I.C. |
| 153 | (a)600mmx450mm B.E Mirror |
| 154 | Supplying all materials,labour T&P and fixing standard size glass shelf with CP brass brackets and guard rail complete fixed to wooden plugs with CP screws as per PH specification and direction of E.I.C. |
| 155 | (a)(125x450)mm size glass-shelf with CP Guard rail(Jaquar Make) |
| 156 | Supplying all materials,labour T&P and fixing standard size CP towel rail complete with CP Brass brackets fixed to wooden plugs with CP screws as per PH specification and direction of E.I.C. |
| 157 | (a)25mmx600mm long CP towel rail(Jaquar Make) |
| 158 | (b)CP Towel Ring(Jaquar Make) |
| 159 | Supplying all materials,labour T&P and fixing standard size CP soap holder complete with CP Brass brackets fixed to wooden plug with CP screws as per P.H. specification and direction of E.I.C. |
| 160 | (a)CP Soap holder(Jaquar Make) |
| 161 | Supplying all materials labour T&P and cutting holes through brick/stone masonary walls for taking HCI/PVC and fittings including making good the damages etc. all complete as per PH specification and direction of E.I.C. |
| 162 | (a)375mm thick wall |
| 163 | (b)250mm thick wall |
| 164 | (c)Roof cutting |
| 165 | Supplying all materials labour T&P and fixing Digital tiles in floors,threads, landing on 25mm thick bed of cm(1:1)jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing & polishing complete including cost of precast tiles etc. all complete as per specification and directiof E.I.C. |
| 166 | (i)Ground Floor:- |
| 167 | (ii)First Floor:- |
| 168 | Supplying all materials labour T&P and fixing porcelain glazed tiles in dados skirting and risers of steps on 12mm thick CP(1:3)jointed with neat cement slurry mixed with pigments to match the shade of tiles including rubbing & polishing complete including cost of tiles etc. all complete as per spcificaiton and direction of E.I.C. |
| 169 | (i)Ground Floor:- |
| 170 | (ii)First Floor:- |
| 171 | Providing fitting fixing Al door with anodized Al door section of 9202 as vertical member,9201 as top,9200 as bottom and middle member with frame section as 9221with tapered clip no 4660 & frame to be completed by means of jointing angle no 1855 including cost of labour T&P hire charges of drilling machine labour charges etc complete with cost of laminated board.and as per direction of the E.I.C. |
| 172 | S.D. PORTION:- |
| 173 | Supplying all materials labour T&P and constructing inspection chamber of the following sizes with cc (1:3:6) using 40mm size hg metal on bed,1stclass KB brick work in cm(1:6) moulding & shaping the channel inside and benching with cc( 1: 1.5:3) using 12mm size hg chips,12mm thick CP(1:3) with punning to inside, cement flush pointin (1:3) to outside, RCC cover slab in cc (1:1.5:3) using 12mm size hg chips with RCC man hole cover,e.w in excavation in all kinds of soil and refilling the cavity around the chamber including watering, curing, conveyance of all materials to site,payment of royality, taxes etc. all complete as per approved specification and direction of E.I.C. |
| 174 | (a)Inside size 760mmx760mmx460mm |
| 175 | Supplying all labour T&P and constructing soakway pit of the following sizes with dry brick walling from bottom upto invert of inlet pipe and 1st class KB brick work in cm(1:6)for the remaining height at top,12mm thick CP(1:4)inside and outside over masonary brick work gravel packing in the rear of well steining RCC cover slab in cc(1:1.5:3)using 12mm size hg chips fitted handles including e.w. in openwell excavation in all kinds of soil and refilling the cavity around the pit & painting the iron work,watering,curing,conveyance of all meterails to work site, payment of royality,taxes etc. all complete as per approved drawing specification and direction of E.I.C. |
| 176 | (a)1.20m dia x 2.00m deep |
| 177 | Supplying all materials labour T&P and laying PVC pipe sewer line,Grade-A of the following internal dia in trenches (to level or slope)and jointing with gasket & stiff mixture or cm(1:1),cc(1:3:6)with 40mm size h.g. metal on bed of the trench and hunching or allround concrete encasing with cc(1:4:8)using 40mm size hg. metal including curing,conveyance to workside,payment of royality,taxes etc and testing all complete as per approved drawing,specification and direction of E.I.C. |
| 178 | (a) 110mm dia PVC pipe with allround hunch top |
| 179 | 15 USER SEPTIC TANK:- |
| 180 | Earth work in all kinds of soil in excavation of foundation trenches within 50m initial lead including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth as per direction of E.I.C. |
| 181 | (a) Initial lift upto 1.50m |
| 182 | (b) From 1.50m to 3.00m depth |
| 183 | Supplying all materials labour T&P and providing cc (1:3:6) using 4cm h.g metal including watering, curing, conveyance of all materials to work site,payment of royality,taxes etc. all complete as per specification and direction of E.I.C. |
| 184 | Supplying all materials labour T&P and providing cc(1:1.5:3) using 12mm hg chips including watering,curing,conveyance of all materials to worksite,payment of royality,taxes etc. all complete as per specification and direction of E.I.C. |
| 185 | Supplying all materials labour T&P and providing brick work with flyash Bricks in cm(1:4)F&P having crushing strength not less than 75kg/cm2 with dimensional tolerance +/-8% including watering,curing conveyance all materials to worksite payment of royality taxes etc. all complete as per specification direction of E.I.C. |
| 186 | Supplying all materials labour T&P and providing rigid & smooth centering & shuttering for RCC works including false work and dismantling them after casting including conveyance of all materials to worksite,payment of royality,taxes etc. all complete as per specification and direction of E.I.C. |
| 187 | Supplying all materials labour T&P and providing MS reinforcement for RCC works including cutting,bending,binding & tying the grills and placing in position including cost of binding wire 18 to 20 gauge conveyance of all materials to work site,payment of royality,taxes etc. all complete as per specification and direction of E.I.C. |
| 188 | Supplying all materials labour T&P and providing RCC(1:1.5:3)using 12mm hg chips including hoisting,laying,watering,curing,conveyance of all materials to work site,payment of royality,taxes etc. all complete as per specification and direction of E.I.C. |
| 189 | Supplying all materials,labour T&P and providing 12mm thicks CP(1:3)with punning on brick/stone work including watering,curing conveyance of all materials to worksite,payment of royality,taxes etc. all complete as per specification and direction of E.I.C. |
| 190 | Supplying all materials labour T&P and fixing MS step iron in 12mm dia MS steel bar and fixing into walls of septic tank duly embedded in cc(1:3:6)all complete as per PH. specification and direction E.I.C. |
| 191 | Supplying all materials labour T&P and fixing of RCC baffle wall precast with cc(1 :1.5:3)using 12mm b.h.g. chips and fitted to septic tank as per PH. specification and direction E.I.C. |
| 192 | Supplying all materials,labour,T&P and providing fitting & fixing PVC Tee in wall including fitting the necessary with cc(1:1.5:3)with 12mm size hg chips all complete including watering,curing,conveyance of all materials to worksite, payment of royality,taxes etc. all complete as per specification and direction of E.I.C. |
| 193 | (a) 110mmx110mm x110mm PVC Tee |
| 194 | Supplying all materials labour T&P and Providing cement flush pointing(1:3) to brick masonary including watering,curing,conveyance of all materials to work site etc. all complete as per specification and direction of E.I.C. |
| 195 | Supplying all materials labour T&P and providing 500x500x100mm thick RCC precast MH cover in cc(1:1.5:3)using 12mm hg chips placing the cover on the MH/ST & finishing smooth all complete as per specification and direction of E.I.C. |
| 196 | Filling in F&P with excavated materials including watering and ramming as per direction of E.I.C. |
| 197 | W/S SUPPLY PORTION:- |
| 198 | Supplying all materials,labour,T&P and construction of masonry staging with providing 1stclass KB brickwork in cm (1:6) of 0.46m height in staging,12mm CP in cm(1:6), RCC Beam of 0.25mx0.30mx2.60m in cc (1:1.5:3) using 12mm size HG chips including centering, shuttering, bending & binding of rod etc watering, curring, conveyance of all materials to worksite, payment of royalty,taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 199 | (a)Stagging for 1000Ltr. Storage Tank (1st. Floor) |
| 200 | Supplying all materials,labour,T&P and Fitting and Fixing of Rotational moulded polythene cylindrical vertical water storage tank conforming to 12701/1996 including cutting holes through the tank and fixing mild steel tubes and fittings and providing extra sockets and jamnuts including hoisting upto a height of 5mtr above G.L and placing the tank in required position including conveyance of all materials to work site,payment of royalty,taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 201 | (a)1000Ltr. Capacity Water Storage Tank (1st. Floor) |
| 202 | Supplying all materials,labour,T&P and fitting & fixing 10ltr. capacity low level flushing cystern with a pair of ms clamps complete with fittings such as syphonic arrangements 15mm nominal size PVC ball valve with polythene float,PVC handle,union and couplings for connection with inlet,outlet and overflow pipes, 32mm dia CP flush bend,15mm dia,PVC inlet connection pipe including cutting holes and making good the same and connecting the flush bend with cystern and closet and connecting inlet pipe with supply main etc. all connecting inlet pipe with supply main etc. all complete as per specification and direction of E.I.C. |
| 203 | (a)10Lit. PVC Cistern(Parryware make) |
| 204 | Supplying all materials,labour,T&P providing and fixing to wall or ceiling and floor PVC pipe conforming to ASTM-D-1785/89 (sch-80) and pipe fitting of the following nominal bore with clamps including making good the wall,ceiling and floor testing all complete as per specification and direction of E.I.C. |
| 205 | (a)25mm dia PVC pipe(External |
| 206 | (b)20mm dia PVC pipe(Internal) |
| 207 | Supplying all materials,labour,T&P cutting holes through brick/stone masonry works including making good the damages in cm(1:4)for taking GI/PVC pipe & fitting etc. all complete as per PH specification and direction of E.I.C. |
| 208 | (a)250mm thick wall (Ground Floor) |
| 209 | (b)250mm thick wall (1st. Floor) |
| 210 | Supplying all materials,labour,T&P cutting holes in RCC floors,roofs etc up to 19cm thick for passing GI/PVC pipes fittings and reparing the holes after insertion of pipe etc. with cc(1:1.5:3)including finishing so as to make it leak proof as per direction of E.I.C. |
| 211 | Supplying all materials,labour,T&P and cutting grooves in pucca floors and walls for taking GI/PVC pipes and making good the damages as per direction of E.I.C. |
| 212 | (a)Ground Floor |
| 213 | (b1st. Floor |
| 214 | Supplying all materials,labour,T&P and fitting & brass/CP fittings of the following nominal bore with supply of all jointing materials etc.complete as per P.H. specification and direction of E.I.C. |
| 215 | (a)15mm dia CP Bib cock(make-Jaquar) |
| 216 | (b)15mm dia CP Two way Bib cock(make-Jaquar) |
| 217 | (c)15mm dia CP(L.B)Bibcock(make-Jaquar) |
| 218 | (d)15mm dia CP Pillar cock (make-Jaquar) |
| 219 | (e)15mm dia CP Angle Stopcock(make-Jaquar) |
| 220 | (f)15mm dia CP Concealed stopcock(make-Jaquar) |
| 221 | (g)15mm dia CP Revolving Shower with shower Arm(make-parry ware) |
| 222 | (h)15mm dia Health Faucet & 1.0m long Flexible pipe(make-Jaquar) |
| 223 | (i)25mm dia U-PVC F.W.V. |
| 224 | (j)15mm dia CP Extension Piece |
| 225 | (k)15mm dia CP Flange |
| 226 | Supplying all materials,labour,T&P and fitting and fixing of ISI mark 1HP single phase vertical water cool submersible pump set with discharge 1800/2200Lit /Hour & a head-55/70mtr.of reputed make(CRI/KSB/Texmoor equivelent Including cost conveyance and taxes etc. all completes as per P.H. Specification and direction of E.I.C. |
| 227 | Supplying all materials,labour,T&P and fitting & fixing of 1.0HP single phase vertical submersible pump set with commissioning and testing etc. all completes as per P.H. Specification and direction of E.I.C. |
| 228 | Supplying all materials,labour,T&P and fitting & fixing of ISI mark DOL starter of reputed make like BCH or equivalent for 1HP single phase vertical submersible pump set including all cost conveyance & taxes etc. all completes as per P.H. Specification and direction of E.I.C. |
| 229 | Supplying all materials labour T&P and fitting & fixing of 2.5mm2 3core copper flat suitable cable having ISI mark of reputed company like BCH/Finolex or equivalent & connecting the pump starter including cost conveyance & taxes etc. all completes as per P.H. Specification and direction of E.I.C. |
| 230 | Supplying all materials labour T& P and fitting&fixing plastic rope with MS well cover,MS Clamp,stainless steel short piece,Bend & socket,union including all cost conveyance & taxes etc. all completes as per PH. Specification direction of E.I.C. |
| 231 | Supplying all materials labour T&P and fitting&fixing of HDPE pipes & pipe fittings with making connection to pump set including all cost conveyance & taxes etc.all completes as per P.H. Specification direction of E.I.C. |
| 232 | 125mmx100mm Size ODEX Bore Well |
| 233 | Supplying all materials Labour T&P and drilling perfectly vertical bore hole in boulder formation areas with drawn the hole hammer drilling rigs or combination drilling rigs to suit the site condition with deployment of rig necessary accessories and consumables for a specified depth below GL including supply of necessry casing shoe,odex tools & plants,jointing materials,extra sockets where required with drawing of pipes lowering the MS(ERW)pipes & fitting & fixing in perfectly vertical position including cutting & welding for jointing the pipes for simultaneous casing lowering in over burden boulder formation till encounter of hard rock and to drill 125mm DTH upto the desired depth as may be necessary, cleaning the site and washing bore etc. all complete providing sanitary sealing upto 5metres depth below GL as per the direction of E.I.C. |
| 234 | (a)Drilling of 125mm. dia. Bore |
| 235 | (b)Drilling of 125mm dia.Bore |
| 236 | Lowering the folloing size GI/PVC pipes with without slotted pipes as per the necessary from GL up to 30mtr depth and fitted and fixed up in perfectly vertical position including cutting and threading pipe and slotted pipe and supply and fixing all jointing materials tools and plants etc. complete and keeping the top plugging tube wells to prevent entry of foreign materials from above. |
| 237 | Lowering of 125mm dia MS pipes: |
| 238 | (b)Cost of 125mm dia MS casing pipe |
| 239 | Cleaning and developing the tube well using their own compressor continuously worked till clear and adequate discharge is obtained from the tube well including supply and use of all necessary equipment and labour as per the direction of E.I.C. Please Enable Macros to View BoQ information |