|
| 1 | Annexure-A (Supply of following material as per UPCL Norms.) |
| 2 | Suspension Clamp with Eye Hook. |
| 3 | Piercing clamp for 120sq.mm. - 120 Sqmm. |
| 4 | MS Calmp SP-33 with Nut and bolt for Dead End. |
| 5 | Stay clamp for PCC Pole. |
| 6 | Dead End clamp with I Hook. |
| 7 | Piercing connector 120-25 sq.mm. |
| 8 | LT bare N. Connector PG clamp 95-25mm2. |
| 9 | MS Calmp with nut bolt for suspension clamp. |
| 10 | LT distribution box 3 Phase. |
| 11 | Aluminium Lugs 0 type 25 mm (4x25). |
| 12 | MS Half clamp for LT distribution Box for PCC pole. |
| 13 | Annexure-B (Following work as per UPCL norms) |
| 14 | Erection and installation of earthing rod complete with driving/embedding the rod into the ground, connection with earthing conductor, clamps, nuts, bolts, watering arrangement (if required), and all associated accessories, complete as per approved drawings and technical specifications. |
| 15 | Fabrication of steel members including cutting, drilling, bending, welding, grinding, fitting, and assembling complete as per approved design, drawings, and technical specifications. |
| 16 | Erection of LT stay set complete with stay rod, stay wire, turn buckle, stay clamp, insulator and all associated accessories, including fixing, tensioning, alignment, and making the stay arrangement complete as per approved specifications and departmental standards. |
| 17 | Excavation of pit for pole of required size and depth in all types of soil, including dressing of sides, dewatering (if required), disposal of surplus excavated earth, and complete as per approved specifications. |
| 18 | Erection of single PCC pole at the designated location, including transportation within site, lifting, positioning, plumbing, alignment, backfilling, ramming, and all incidental works required for complete installation of the pole as per approved drawings, specifications, and departmental standards. |
| 19 | Erection of single SP-23 steel tubular pole at the designated location, including unloading, handling, lifting, positioning, plumbing, alignment, backfilling, grouting, tightening of base fittings, and all incidental works required for complete installation as per approved drawings, technical specifications, and departmental standards. |
| 20 | Erection of single SP-55 steel tubular pole at the designated location, including unloading, handling, lifting, positioning, plumbing, alignment, backfilling, grouting, tightening of all fittings and accessories, and all incidental works required for complete installation as per approved drawings, technical specifications, and departmental standards. |
| 21 | Dismantling of existing 1-Phase 2-Wire LT overhead line with Weasel conductor, including removal of conductor, binding wire, jumpers, and associated line materials from poles, lowering, coiling, stacking at designated location, and making the site clear, complete as per departmental specifications. |
| 22 | Dismantling of existing 2-Phase 3-Wire LT overhead line with Weasel conductor, including removal of conductor, jumpers, binding wire, insulator bindings and associated line materials from poles, lowering, coiling, stacking at designated location, and clearing the site, complete as per approved specifications and departmental standards.\\" |
| 23 | Dismantling of existing 3-Phase 4-Wire LT overhead line with Weasel conductor, including removal of conductors, jumpers, binding wire, insulator bindings, and all associated line materials from poles, lowering, coiling, stacking at the designated location, and clearing the site, complete as per approved specifications and departmental standards. |
| 24 | Laying, dressing, and fixing of LT service cable in overhead mode from the distribution pole/distribution point to the consumer premises, including necessary clamps, saddles, connectors, supports, termination, and all associated accessories, complete as per approved specifications and departmental standards |
| 25 | Lopping and chopping of tree branches along, above, or in the vicinity of overhead electrical lines to maintain statutory safety clearances from conductors, including cutting, trimming, removal, and disposal of branches, complete as per departmental safety standards and technical specifications. |
| 26 | Cartage/transportation of PCC poles from the departmental store, supplier's premises, or designated stacking point to the work site for a lead distance of 51 km to 70 km, including loading, unloading, handling, transit protection, and safe delivery complete as per departmental specifications. |
| 27 | Cartage/transportation of SP-21/SP-23 steel tubular poles from the departmental store, supplier's premises, or designated stacking point to the work site for a lead distance of 51 km to 70 km, including loading, unloading, handling, transit protection, and safe delivery complete as per approved specifications and departmental standards. |
| 28 | Cartage/transportation of SP-55 steel tubular poles from the departmental store, supplier's premises, or designated stacking point to the work site for a lead distance of 51 km to 70 km, including loading, unloading, handling, transit protection, and safe delivery complete as per approved specifications and departmental standards. |
| 29 | Cartage/transportation of petty materials from the departmental store, supplier's premises, or designated stacking point to the work site for a lead distance of 51 km to 70 km, including loading, unloading, handling, stacking, transit protection, and safe delivery complete as per departmental specifications. |
| 30 | Head-load/manual cartage of PCC poles from the unloading point, stacking yard, or nearest motorable road to the exact work site for a lead distance of 0 to 1 km, including loading, unloading, handling, shifting, and safe placement at the designated location, complete as per departmental specifications. |
| 31 | Head-load/manual cartage of SP-21/SP-23 steel tubular poles from the unloading point, stacking yard, or nearest motorable road to the exact work site for a lead distance of 0 to 1 km, including loading, unloading, handling, shifting, and safe placement at the designated location, complete as per approved specifications and departmental standards. |
| 32 | Head-load/manual cartage of SP-55 steel tubular poles from the unloading point, stacking yard, or nearest motorable road to the exact work site for a lead distance of 0 to 1 km, including loading, unloading, handling, shifting, and safe placement at the designated location, complete as per approved specifications and departmental standards. |
| 33 | Head-load/manual cartage of materials from the unloading point, stacking yard, or nearest motorable road to the exact work site for a lead distance of 0 to 1 km, including loading, unloading, handling, shifting, stacking, and safe placement of materials at the designated location, complete as per approved specifications and departmental standards. |
| 34 | Disconnection and reconnection of consumer service connection, including removal and restoration of service line connections at pole and consumer premises, checking of meter connections, tightening of terminals, testing, and ensuring safe restoration of supply, complete as per departmental procedures and safety standards. |
| 35 | Laying, stringing, sagging, and fixing of LT XLPE Aerial Bunched Cable (ABC) of size 3×95 + 1×70 Sq.mm, including suspension/dead-end clamps, insulation piercing connectors, binding, tensioning, jointing, termination, and all associated hardware and accessories required for complete installation as per approved drawings, technical specifications, and departmental standards |
| 36 | Disconnection and reconnection of consumer service connection, including isolation of supply, removal and restoration of service line connections, checking and tightening of terminals, testing of the installation, and safe restoration of electricity supply, complete as per departmental procedures, safety regulations, and technical specifications. |
| 37 | Installation of LT Distribution Box at the designated location, including mounting/fixing on pole or structure, connection of incoming and outgoing cables, termination, tightening of all electrical connections, earthing, testing, and commissioning complete with all necessary hardware, accessories, and fittings as per approved specifications and departmental standards |
| 38 | Realignment of tilted pole to restore it to the correct vertical position, including excavation (where required), lifting, straightening, repositioning, backfilling, ramming, grouting, tightening of stays and fittings, and all incidental works necessary to ensure the stability and safety of the pole, complete as per approved specifications and departmental standards. |
| 39 | Grouting and muffing of poles with cement concrete of specified grade, including excavation around the pole (where required), providing PCC/RCC muff, concrete filling, compaction, curing, finishing, and all incidental works necessary to strengthen and stabilize the pole foundation, complete as per approved specifications and departmental standards. |
| 40 | Dismantling and re-fixing of fuse set at the designated location, including removal of existing fuse set, inspection, replacement of minor consumables (if required), re-installation, tightening of connections, alignment, testing, and commissioning complete with all associated accessories as per approved specifications and departmental standards. |
| 41 | Back carriage of dismantled/scrap materials from the work site to the departmental store or designated stacking yard, including collection, loading, unloading, handling, transportation, stacking, and safe delivery of scrap materials complete as per departmental procedures and specifications |
| 42 | Painting of pole with approved quality paint, including surface cleaning, removal of rust, dirt and old loose paint, application of primer (where required), painting of pole number, danger mark, and finishing with specified coats of paint, complete as per departmental specifications and standards Please Enable Macros to View BoQ information |