| 1 | Safe Carriage of 8.5 M PCC Pole | Safe carriage of 8.5 mtr. long PCC pole from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends. |
| 2 | Safe Carriage of 11 and 13 M STP | Safe carriage of 11/13 mtr STP from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends. |
| 3 | Safe Carriage of 9 M STP | Safe carriage of 9 mtr STP from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends. |
| 4 | Safe Carriage of Line Material | Safe carriage of line material from store center Etah/nearest substation to pit site in distance range 0 to 60 Km. including loading & unloading at both ends. |
| 5 | Opening Binding Dog Raccon Rabbit Conductor | Opening of binding & removal of Dog/ Raccoon/ Rabbit conductor with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. |
| 6 | Opening Binding Weseal Conductor GI Wire | Opening of binding & removal of ACSR weasel conductor/ GI wire with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. |
| 7 | Opening Binding of AB Cable | Opening of binding & removal of ABC 3X95+1X35+1X16/3x50mm with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. |
| 8 | Opening Binding of AB Cable | Opening of binding & removal of ABC 3x120+1x70+1x16 with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. |
| 9 | Erection of 8.5 M PCC as Single Support | Erection of 8.5 mtr. long PCC poles as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes |
| 10 | Erection of 9 M STP as Single Support | Erection of 9 mtr. STP as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes |
| 11 | Erection of 11 and 13 M STP as Single Support | Erection of 11/13 mtr.STP as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes |
| 12 | Erecton of 8.5 M PCC Double Section Pole | Erection of 8.5 mtr. long PCC poles as Double Pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete. |
| 13 | Erecton of 9 M STP Double Section Pole | Erection of 11mtr. STP as Double Pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete. |
| 14 | Laying Stringing Dog Raccon Rabbit | Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with Dog/ Raccoon/ Rabbit conductor including binding & nozzling. |
| 15 | Laying Stringing ACSR Weseal GI Wire | Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with ACSR weasel conductor/ GI wire including binding & nozzling. |
| 16 | Laying Stringing AB Cable | Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with ABC 3x95 mm/3x50 mm. including binding & nozzling. |
| 17 | Laying Stringing AB Cable | Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with ABC 3x120+1x70+1x16 including binding & nozzling. |
| 18 | Straightening of Tilted PCC STP Single Support | Straightening of tilted PCC poles/STP/Rail single support of HT/LT line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line. |
| 19 | Straightening of Tilted Double Pole | Straightening of tilted D/P after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete. |
| 20 | Opening of HT LT 25 KVA 63 KVA TF Connection | Opening of HT/LT connections & lowering of 25/63 KVA T/F from D/P/Plinth and shifting up to in safer place. |
| 21 | Opening of HT LT 100 KVA TF Connection | Opening of HT/LT connections & lowering of 100 KVA T/F from D/P/Plinth and shifting up to in safer place. |
| 22 | Dismantelling of old Material | Dismanteling of old/damage STP/RS Joist of HT/LT line and carriage to store centre Etah |
| 23 | Re sagging of Conductor | Re-sagging of Dog/ Raccoon/ Rabbit conductor loose 33/HT/LT conductor after opening, binding, nozzling etc. |
| 24 | Re sagging of Conductor | Re-sagging of ACSR weasel conductor/ GI wire loose 33/HT/LT conductor after opening, binding, nozzling etc. |
| 25 | Re sagging of AB Cable | Re-sagging of ABC 3X120+1X70+1X16 loose 33/HT/LT cable after opening, binding, nozzling etc. |
| 26 | Re sagging of AB Cable | Re-sagging of ABC 3x50/3X95 loose 33/HT/LT cable after opening, binding, nozzling etc. |
| 27 | Replacement of brocken damaged accessories | Replacement of 11 KV cross arms V type broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 28 | Replacement of brocken damaged accessories | Replacement of 11 KV pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 29 | Replacement of brocken damaged accessories | Replacement of 11 KV pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 30 | Replacement of brocken damaged accessories | Replacement of 11 KV Disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 31 | Replacement of brocken damaged accessories | Replacement of Cross Arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 32 | Replacement of brocken damaged accessories | Replacement of F Clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 33 | Replacement of brocken damaged accessories | Replacement of LT shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 34 | Replacement of brocken damaged accessories | Replacement of 33 KV cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 35 | Replacement of brocken damaged accessories | Replacement of 33 KV pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 36 | Replacement of brocken damaged accessories | Replacement of 33 KV pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 37 | Retightening of Stay Rod | Retightening of Stay rod. Etc. complete. |
| 38 | Providing and Fixing of Stay Rod | Providing fixing of stay rod with nuzzling etc. complete. |
| 39 | Earthing of PCC RS Joist STP | Earthing of PCC/RS Joist/STP as per RESPO norms. |
| 40 | Carriage of old Material | Carriage of old material from pit site to JE store/store center, Etah in distance range 0 to 10 km including loading & unloading and proper stacking. |
| 41 | Mounting of 25 KVA 63 KVA TF | Mounting of 25/63 KVA T/F on double pole/Plinth including making of the connection etc complete. |
| 42 | Mounting of 100 KVA TF | Mounting of 100 KVA T/F on double pole/Plinth including making of the connection etc complete. |
| 43 | Chopping of Tree Branches | Chopping of tree branches |
| 44 | Repairing Resagging New Guarding HT Line | Repairing/ Resagging / new guarding of HT lines with GI wire as per RESPO norms |