| 1 | Dismantling the exisisting damaged tiles Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs etc., complete. |
| 2 | Dismantling the exisisting damaged plastering surfaces in wall and floor neatly, clearing away from the site.etc asper departmental officers. |
| 3 | Dismantling the exisisting damaged Brick wall surface etc complete |
| 4 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10cum |
| 5 | Supplying and filling in foundation and basement with filling M.sand in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. |
| 6 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification |
| 7 | Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) |
| 8 | Supplying fabricating and placing in position of RTS for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). |
| 9 | Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete |
| 10 | Brick work in CM 1:5 (one cement & five sand) using III class country bricks of size 83/4\\"X41/4\\"X 2 1/4 including finishing, curing, etc. complete complying with standard specification - 100CFT |
| 11 | Plastering with cement mortar (1:5) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) |
| 12 | Plastering with cement mortar (1:5) 12mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) etc., complete. |
| 13 | Paving the floor with Vitrified Marbonite tiles of approved quality and colour of size 600x600x8mmthick of approved make, quality and colour in all floors over a base layer of cement mortar 1:3(one cementthree sand) 20mm thick and laid straight alignment and pointed neatly with colour cement at the rate of0.40kg/m2 laid without any air gap in the tiles neatly and fixing in position as per standard specificationsand as directed by the departmental officer. The colour & quality of tiles should be got approved by Municipal Engineer before use on work etc., complete. |
| 14 | Dadooing walls with Glazed tiles of sizes 305mm X200mm X 6mm size of approved make and quality and colour l Set in cement mortar 1:2 (one cement ,two sand) over 10 mm base layer plastering and pointing with white cement neatly as directed. |
| 15 | Supply and Delivery Fabrication of MS doors and windows with outer frame and shutter frame in MS angle of size 40mm x 40mm x 6 mm with MS flat 25mm x 25mm x 6mm and MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locking arrangements including two coats of approved enamel paint over coat of red oxide including cost of angles, plates, sheets, fabrication charges, cost of hold fast and transportation charges etc., complete. 1.00mx2.10m |
| 16 | Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the Executive Engineer before use on work etc. complete. |
| 17 | Roofing with Galvanised Coruugated Iron Sheet of 0.8mm thickness - 10 m2 |
| 18 | Wiring with 2 x 1.5 sqmm (22 /0.3 ) PVC insulated single core unsheathed copper conductor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories iri1fush with wall sa with 150 x 100 x 113 mm TW switch box with 3mm hylum sheet cover for 5A 3 pin non inter locking CS plug with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC plug point |
| 19 | Supplying and fixing of 48” AC ceiling fan with 300mm down rod on the existing clamp with out regulator with complete. |
| 20 | Supply and fixing of single box type4'40Wfluorescent fitting complete with copper choke and condensorwith conduit pipe suspension from the ceiling with PVC unsheathed FRLS copper leads from terminals to the fitting with tube |
| 21 | Painting two coats with ready mixed Plastic Emulsion Paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. - 10 sq.m.(Old wall Surface only ) |
| 22 | Add GST 18% Please Enable Macros to View BoQ information |