| 1 | Loading, Carriage and unloading of 33 KV VCB/OCB (including old & used) from store to work site or vice versa |
| 2 | Making Plinth of V.C.B. including cost of Civil Material |
| 3 | Erection of 33 KV VCB Structure on Plinth |
| 4 | Erection of 33 KV VCB on erected structure with the help of Crane. |
| 5 | Wiring, Testing and commissioning of newly erected 33 KV VCB and all related work. |
| 6 | Loading, Carriage and Unloading of 33 kV single CRP from store to site and vice versa |
| 7 | Erection of 33 KV Control Relay Panel |
| 8 | Wiring, Testing and commissioning of newly erected CRP and all related work. |
| 9 | Loading, Carriage and Unloading of Battery charger & battery set from store to site and vice versa |
| 10 | Instalation of Batteries cell .charger& stand all proper connection & battery stand provided by contrctor |
| 11 | Making of Trench for Laying of Control Cable with all Civil Material Digging Trench inside of 0.4 Meter wide & 0.4 Meter Deep of CC Work Size of 10 C.M. Around the Digging Trench with Ratio of 1:4:8 Its Proper Ramming and Curing. |
| 12 | Laying of control cable including all related civil work |
| 13 | Taking out 33 KV/11 KV cable from drum/complete drum of cable from store its loading carriage and safe unloading by truck/bullock cart at site of work or vice-versa. |
| 14 | Digging of Trench for laying of 11 KV and 33 KV cable in Normal soil in size of 30 cm. wide and 1 to 1.5 meter deep. |
| 15 | Laying of 33 kV &11 kV cable including cost of bricks and snad as per standard specification. |
| 16 | L/C FOR LAYING OF 11/33 KV CABLE IN AIR RISING OF POLE |
| 17 | Loading, Carriage and unloading of 11 KV VCB/LT ACB from Kesco store work site or vice-versa. |
| 18 | Shifting of 11 KV VCB from unloading site to Control room. |
| 19 | Erection and grouting of 11 KV VCB in control room. |
| 20 | Wiring, Testing and commissioning of newly erected 11 KV VCB and all related work. |
| 21 | Connecting of 11 KV Cable box on newly erected 11 KV VCB after erection work. |
| 22 | Connection of earthing of 11 VCB/ S/G Panels. |
| 23 | Loading, Carriage and unloading of 5MVA T/F (including old & used) from store to work site or vice versa |
| 24 | Erection of 5MVA 33/11kv T/F radiators, conservator tank vent pipe and all other accessories on main tank of following T/F including oil filling and all related work. With 2 No. crane |
| 25 | Erection and welding of cable support structure with the help of welding including earthing of support in proper alignment and all related work. |
| 26 | Wiring, Testing and commissioning of newly erected 5 MVA and all related work. |
| 27 | Fabrication of neutral support structure with M.S. Angle and M.S. Flat. |
| 28 | Connecting of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection. |
| 29 | Construction of power T/F plinth suitable for 5/10 MVA 33 KV T/F in size of 3 x 3 x 1.5 Mtr. Digging of pit in size of 3.5 x 3.5 x 1.2 Mtr. Of CC work at bottom in size of 3.5 x 3.5 x .15 Mtr. With ratio of 1:4:8 its proper ramming and curing thereafter brick work in size of 3 x 3 x 0.8 Mtr. with 1 : 6 CC Sand ratio, thereafter CC work on top in size of 3 x 3 x .25 Mtr. thereafter plastering all around the open portion, grouting of rail and M.S. Angle in top CC work and its proper curing. all material provinding by contractor |
| 30 | Fitting of 3 mtr. Long 2 No. rail pole on power T/F plinth during erection of power transformer. |
| 31 | T/F Flexible copper bond 30mm vide 30 Cm long & connecting with neutral support to T/F neutral bushing & proper tightening. |
| 32 | Leveling of Yard |
| 33 | Filling of soil in newly constructed S/S Yard |
| 34 | Loading, Carriage and Unloading of 33 KV C.T/P.T. from store to site and vice versa |
| 35 | L/C FOR ERECTION OF O/D 33KV PT |
| 36 | L/C FOR ERECTION OF O/D 33KV CT |
| 37 | L/C FOR ERECTION OF CT/PT JUNCTION BOX |
| 38 | Erection of Busbar Gantry |
| 39 | Fabrication of Busbar Gantry |
| 40 | Erection charge of lower bus bar with ACSR Panther conductor |
| 41 | Erection charge of upper bus bar with ACSR Panther conductor |
| 42 | Loading carriage and unloading ACSR Dog/ Panther Conductor |
| 43 | Laying of ACSR Panther conductor |
| 44 | Fabrication of various structures with MS Material |
| 45 | Erection and grouting of various M.S. Structure in proper alignment and plinth 15 Cm. above ground level and smooth finish. |
| 46 | Painting of various M.S. Structure |
| 47 | Erection and grouting of neutral support structure with 1 : 4 : 8 CC ratio in proper alignment and plinth 15 Cm. above ground level and smooth finish. |
| 48 | Erection and grouting of Cable support structure with 1 : 4 : 8 CC ratio in proper alignment and plinth 15 Cm. above ground level and smooth finish. |
| 49 | MAKING Outdor Earthing (Earthmat including Delta earthing) as per Standerd Specification.ALL Materials provided by contractor |
| 50 | L/C FOR BOARING OF 80 DEEP AND CONNECTION WITH 33 KV VCB CONTROL RELAY PANEL 11 KV BREAKERS & POWER T/F NEUTRAL OR BODY WITH GI PIPE SIZE 40 MM DIA B-CLASS 80 LONG WITH SOCKET ETC THROUGH MS FLAT SIZE 50X6 MM AND POWER CONNECTION INCLUDING OF ALL MATERIAL shall be provided by contractor with cost of all material. |
| 51 | Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia B-Class 40 feet long with socket cutter and connection of pipe to O/D unit and metering cubical Body with 25*3 mmsq GI strip all material shall be provided by contractor with cost of all material. |
| 52 | Mounting and fixing of 11kv/33kv pin insulator |
| 53 | Mounting and fixing of 11kv/33kv disc insulator |
| 54 | Fabrication of isolator structure as per standard design. |
| 55 | Erection and grouting of Isolator structure in proper alignment and making plinth 15 Cm. above ground level with smooth finish. |
| 56 | Erection of 33 kV Line Isolator / Bus Isolator on plinth |
| 57 | Erection of 33 kV Line Isolator / Bus Isolator on erected structure |
| 58 | Erection of lighting aresstor |
| 59 | Making indoor/outdoor joints of 33 KV/11KV XLPE Cable where the cable is being laid. |
| 60 | Mounting of all types of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends with pipe provided by KESCo |
| 61 | Arrangement of requirment of material for wiring and testing of panels and T/Fs Please Enable Macros to View BoQ information |