Name of Work:- Construction for Restoration of Damaged Portion of Kalaban 1st Part 1st Khul
Sl. No.
Item Description
1
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet
2
Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.2.6.1 All kinds of soil
3
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
5
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m onhorizontal/side slopes; complete including curing.
6
carriage of sand &agg by avg 10km by Mt 800m by HL Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.