|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or leaner mix (i/c equivalent design mix). |
| 2 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
| 3 | Extra for scrapping, cleaning and straightening reinforcement from R.C.C |
| 4 | Extra for cutting reinforcement bars manually/by mechanical means inR.C.C. or R.B. work (Payment shall be made on the cross sectional areasof R.C.C. or R.B. work) as per direction of Engineer-in-charge. |
| 5 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In cement mortar. |
| 6 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m. (stacks of cleaned bricks shall be measured) : From brick work in cement mortar |
| 7 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead. |
| 8 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead :15.12.1 Of area of 3 sqm. and below |
| 9 | Dismantling wood work in frames, trusses, purlins and rafters upto 10meters span and 5 meters height including stacking the material within 50 meters lead : Of sectional area below 40 sqcm. |
| 10 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles 10 mm to 25 mm |
| 11 | Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 meters lead |
| 12 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge 15 mm to 40 mm nominal bore. |
| 13 | Dismantling of flushing cistern of all types(C.I/PVC/Vitreous china) including stacking of useful materials near the site and disposal of unserviceable materials within 50 meters lead |
| 14 | Dismantling aluminum / Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable surplus material and stacking of serviceable material within 50 meters lead as directed by Engineer-in-charge |
| 15 | Dismantling 15 to 40 mm dia G.I. pipe including stacking of dismantled pipes (within 50 metres lead) as per direction of Engineer-in-Charge. Internal Work- Exposed on wall |
| 16 | Disconnecting damaged overhead/terrace PVC water storage tank of any size from water supply line and removing from the terrace including shifting at ground level as per direction of Engineer-in- charge. |
| 17 | Dismantling C.I. or asbestos rain water pipes with fittings and clamps including stacking the material within 50 meters lead :100 mm |
| 18 | Dismantling of road gully chamber of various sizes including C.I. grating with frame including stacking of useful materials near the site and disposal of unserviceable materials into municipal dumps within 50 meters lead including refilling the excavated gap. |
| 19 | Dismantling of Dumper Lift including lift and lead of 50 mtr |
| 20 | Dismantling of Electrical fittings and fixtures including a lead of 50 mtrs. |
| 21 | Carriage of Lime, moorum, building rubbish by Mechanical Transport including loading / unloading and stacking at site complete.for an average lead upto 15 km. |
| 22 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of G.S. Sheet Please Enable Macros to View BoQ information |