| 1 | Carriage of LT Cable 1x240 sqmm from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 2 | Carriage of LT XLPE Cable 1x400 sqmm from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 3 | Carriage of 11KV/LT A.C.S.R DOG INSULATED CONDUCTOR from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 4 | Carriage of 11 KV XLPE Cable 3x70 sqmm from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 5 | Carriage of 250 kva 11/0.4kv New Transformer from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 6 | Carriage of 11 KV XLPE Cable 3x185 sqmm from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 7 | Carriage of ACSR weasel Conductor from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 8 | Carriage of ACSR Dog Conductor from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 9 | Carriage of LT ABC 3x120+1x95+1x16 SQ MM from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 10 | Carriage of PCC Pole 8.5 MTR LONG from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 11 | Carriage of PCC Pole 11 MTR LONG from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 12 | Carriage of Distribution Box 3 Phase from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 13 | Carriage of line material as per site requirement:- 11KV Jointing Kit 3x185 sqmm O/D- 4Nos, 11KV Jointing Kit 3x185 sqmm I/D-2Nos, 11 KV JOINTING KIT 3*70 SQMM O/D- 6Nos, 11 KV JOINTING KIT 3*70 SQMM STH- 3Nos, 11 kv Fuse Set D/O- 34Nos, 11 KV TPMO-17Nos, 11 KV Fuse Set- 8Nos, Earth Rod With Set- 2Nos, Stay Set Complete- 7Nos, 11 KV TPMO Set- 6Nos, LT Lead 1x25 sqmm- 56mtr, 11 KV Composite Disc Insulator-96Nos, 11 KV POLLY Pin Insulator With Pin- 6Nos, 11 KV Pin Insulator With Pin- 21Nos, 11 KV Composite Pin Insulator- 249Nos, 11KV Composite Polymeric Disc Insulator-80, 11 KV Disc Fitting Insu. 45 KN- 174Nos, 11 KV Disc Insulator With Pin -51Nos ...etc...from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 14 | Providing/Supply Material and making Complete Plinth of Transformer Size 2x2x1.5m with Material(Standard Size) at various site with all accessories complete in all respect as per respo Norms. |
| 15 | Providing/Supply Material and making Complete Wiremesh T/F Fencing 2.5 Mtr (26 R.M.T with MS Angle 35x35x5 MM) with MS agnle(Standard Size) at various site with all accessories complete in all respect as per respo Norms. |
| 16 | Safely placing of 250 kva 11/0.4 new T/F on the plinth/DP by the help of Crane/Chain Cuppie complete in all respect as per Respo Norms at various site. |
| 17 | Supply/Providing and Complete Errection Chemical Earthing(Standard Quality) of suitable for 100/250 KVA T/F at various site with all accessories complete in all respect as per respo Norms. (Chemical earthing Quality/sample will be provided to SE-EUDC-I, GZB for acceptance then GTP process and inspection.) |
| 18 | Erection of PCC Pole 8.5/11 Mtr Long at various site complete in all respect as per respo Norms. |
| 19 | Providing/Supply Material and making Conreting/Grouting of Pole at various site complete in all respect as per respo Norms. |
| 20 | Supply and Fixing/complete Erection of LT Tailless Unit 300/500/1000 Amp Complete Sturcture(Tailles Drawing will be provided by SE-EUDC-I, GZB) with AL. Bus Bar (2 /3Tailless Unit for each 100/250 KVA Transformer) including supply and errection with all accessories at various site complete in all respect as per RESPO norm. (Tailless Unit Drawing/Quality approved by SE- EUDC-1, GZB.) |
| 21 | Fixing/Erection/Filling and Complete Installation of Carriage Line material as per site requirement:- 11KV Jointing Kit 3x185 sqmm O/D- 4Nos, 11KV Jointing Kit 3x185 sqmm I/D-2Nos, 11 KV JOINTING KIT 3*70 SQMM O/D- 6Nos, 11 KV JOINTING KIT 3*70 SQMM STH- 3Nos, 11 kv Fuse Set D/O- 34Nos, 11 KV TPMO-17Nos, 11 KV Fuse Set- 8Nos, Earth Rod With Set- 2Nos, Stay Set Complete- 7Nos, 11 KV TPMO Set- 6Nos, LT Lead 1x25 sqmm- 56mtr, 11 KV Composite Disc Insulator-96Nos, 11 KV POLLY Pin Insulator With Pin- 6Nos, 11 KV Pin Insulator With Pin- 21Nos, 11 KV Composite Pin Insulator- 249Nos, 11KV Composite Polymeric Disc Insulator-80, 11 KV Disc Fitting Insu. 45 KN- 174Nos, 11 KV Disc Insulator With Pin -51Nos ...etc at various site complete in all respect as per respo Norms. |
| 22 | Cable Laying of 11KV, 3x70sqmm, XLPE Cable with HDD (trenchless) method including cable laying and loop riser... etc. complete in all respects as per RESPO norms. (Goal Market Dundaheda) Note:-The work shall be executed using the same available (balance) cable, and the entire cable shall be fully utilized as per site requirements during execution. |
| 23 | After Laying of 11KV, 3x70sqmm, XLPE Cable, Road Restoration if required (Permission shall be concerned authority by contractor) for Pucca road/Crossing Charges at work site complete in all respect as per respo Norms. |
| 24 | Cable Laying of 11KV, 3x70sqmm, XLPE Cable in Air laying, Lifting, Sagging and loop riser... etc. complete in all respects as per RESPO norms. (SST School) Note:-The work shall be executed using the same available (balance) cable, and the entire cable shall be fully utilized as per site requirements during execution. |
| 25 | Cable Laying of 11KV, 3x185sqmm, XLPE Cable in Air laying, Lifting, Sagging and loop riser... etc. complete in all respects as per RESPO norms. (Feeder No-4 Rajngar-II) Note:-The work shall be executed using the same available (balance) cable, and the entire cable shall be fully utilized as per site requirements during execution. |
| 26 | MAKING OF JOINTING KIT at various site complete in all respect as per respo Norms. |
| 27 | Laying, Lifting, sagging and providing proper termination/connection of LT Cable 1x240 sqmm at various site complete in all respect as per respo Norms. |
| 28 | Laying, Lifting, sagging and providing proper termination/connection of LT XLPE Cable 1x400 sqmm at various site complete in all respect as per respo Norms. |
| 29 | Cable Laying, Lifting, sagging of 11 KV XLPE Cable 3x70 sqmmat in Air at work site complete in all respect as per respo Norms. Note:-The work shall be executed using the same available (balance) cable, and the entire cable shall be fully utilized as per site requirements during execution. |
| 30 | Laying, Lifting, sagging, Jumpering and providing proper connection of ACSR weasel Conductorat various site complete in all respect as per respo Norms. |
| 31 | Laying, Lifting, sagging of 11KV/LT A.C.S.R DOG INSULATED CONDUCTOR (as per Estimate) at various site complete in all respect as per respo Norms. |
| 32 | Laying, Lifting, sagging, Jumpering and providing proper connection of ACSR Dog Conductor at various site complete in all respect as per respo Norms. |
| 33 | Laying, Lifting, sagging of LT ABC in different size(as per Estimate) at various site complete in all respect as per respo Norms. |
| 34 | Fixing/Erection and Complete Installation of of Distribution Box 3 Phase at various site complete in all respect as per respo Norms. |
| 35 | Supply & Fixing/Erection/Installation Holding clamp for top channel TPMO, Fuse Set etc with Bolts and Nuts at various site complete in all respect as per respo Norms. |
| 36 | Supply & Fixing/Erection/Installation Dropper Channel at various site complete in all respect as per respo Norms. |
| 37 | Supply & Fixing/Erection/Installation Top Channel at various site complete in all respect as per respo Norms. |
| 38 | Supply & Fixing/Erection/Installation M.S Channel 100x50 mm for TF Base at various site complete in all respect as per respo Norms. |
| 39 | Supply & Fixing/Erection/Installation M.S Angle 65x65x6 at various site complete in all respect as per respo Norms. |
| 40 | Supply & Fixing/Erection/Installation ALLUMINIUM LUG 400sqmm at various site complete in all respect as per respo Norms. |
| 41 | Supply & Fixing/Erection/Installation ALLUMINIUM LUG 240sqmm at various site complete in all respect as per respo Norms. |
| 42 | Supply & Fixing/Erection/Installation Number Plate With Clamp at various site complete in all respect as per respo Norms. |
| 43 | Supply & Fixing/Erection/Installation Danger Board With Clamp at various site complete in all respect as per respo Norms. |
| 44 | Supply & Fixing/Erection/Installation Danger Board Barbed wire including Jumper at various site complete in all respect as per respo Norms. |
| 45 | Supply & Fixing/Erection/Installation All Lug Long Barrel of Size at various site complete in all respect as per respo Norms. |
| 46 | Supply & Fixing/Erection/Installation Nut & Bolt with Washer off size at various site complete in all respect as per respo Norms. |
| 47 | Supply & Fixing/Erection/Installation LT Busbar Copper 'L' Piece 50x225x10mm at various site complete in all respect as per respo Norms. |
| 48 | Supply & Fixing/Erection/Installation Stone Pad 300x300x75 at various site complete in all respect as per respo Norms. |
| 49 | Supply & Fixing/Erection/Installation LT Clamp With Nuts & Bolts of PCC Pole With Neutral at various site complete in all respect as per respo Norms. |
| 50 | Supply & Fixing/Erection/Installation Suspension Clamp at various site complete in all respect as per respo Norms. |
| 51 | Supply & Fixing/Erection/Installation Suspension Clamp with I Hook at various site complete in all respect as per respo Norms. |
| 52 | Supply & Fixing/Erection/Installation Pearcing Clamp at various site complete in all respect as per respo Norms. |
| 53 | Supply & Fixing/Erection/Installation LT Pearcing Connnector 95 sqmm at various site complete in all respect as per respo Norms. |
| 54 | Supply & Fixing/Erection/Installation LT Pearcing Connnector 120 sqmm at various site complete in all respect as per respo Norms. |
| 55 | Supply & Fixing/Erection/Installation Pearcing Connnector at various site complete in all respect as per respo Norms. |
| 56 | Supply & Fixing/Erection/Installation J Hook at various site complete in all respect as per respo Norms. |
| 57 | Supply & Fixing/Erection/Installation I Hook at various site complete in all respect as per respo Norms. |
| 58 | Supply & Fixing/Erection/Installation GI Pipe 6\\" dia at various site complete in all respect as per respo Norms. |
| 59 | Supply & Fixing/Erection/Installation Distribution Box Holding Clamp at various site complete in all respect as per respo Norms. |
| 60 | Supply & Fixing/Erection/Installation Dead End Clamp at various site complete in all respect as per respo Norms. |
| 61 | Supply & Fixing/Erection/Installation Dead End Clamp with Eye Hook at various site complete in all respect as per respo Norms. |
| 62 | Supply & Fixing/Erection/Installation and providing proper termination/connection of Connecting Lead 1x16 sqmm at various site complete in all respect as per respo Norms. |
| 63 | Providing/Supply Material and making Earthing of Pole at various site complete in all respect as per respo Norms. |
| 64 | Providing/Supply Material and making Concreating of Stay at various site complete in all respect as per respo Norms. |
| 65 | Supply & Fixing/Erection/Installation LT shackel insulator at various site complete in all respect as per respo Norms. |
| 66 | Supply & Fixing/Erection/Installation LT shackel strip with nut and bolt at various site complete in all respect as per respo Norms. |
| 67 | Supply & Fixing/Erection/Installation GI wire 6 SWG at various site complete in all respect as per respo Norms. |
| 68 | All other remaining works shall be completed and energised the Line by contractor in all respect as per site requirement.(as per Estimate) Please Enable Macros to View BoQ information |