| 1 | Carriage of LT Cable 1x240 sqmm from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 2 | Carriage of LT XLPE Cable 1x400 sqmm from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 3 | Carriage of 11 KV XLPE Cable 3x70 sqmm from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 4 | Carriage of 250 kva 11/0.4kv New Transformer from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 5 | Carriage of 100 kva 11/0.4kv New Transformer from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 6 | Carriage of ACSR weasel Conductor from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 7 | Carriage of 11KV XLPE 120sqmm Cable (2x375MTR+50MTR for connection from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 8 | Carriage of ACSR Dog Conductor from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 9 | Carriage of LT ABC 3x120+1x95+1x16 SQ MM from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 10 | Carriage of PCC Pole 8.5 MTR LONG from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 11 | Carriage of PCC Pole 11 MTR LONG from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 12 | Carriage of Distribution Box 3 Phase from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 13 | Carriage of line material as per site requirement:- 11KV Jointing Kit 3x120 sqmm O/D-2Nos, 11KV Jointing Kit 3x120 sqmm I/D-2Nos, 11 KV JOINTING KIT 3*70 SQMM O/D-2Nos, 11 kv Fuse Set D/O-33Nos, 11 KV TPMO-17Nos, 11 KV Fuse Set-12Nos, Earth Rod With Set- 4Nos, Stay Set Complete- 6Nos, 11 KV TPMO Set- 3Nos, LT Lead 1x25 sqmm-100mtr, 11 KV Composite Disc Insulator- 96Nos, 11 KV Polly Disc Insulator with fitting- 6Nos, 11 KV POLLY Pin Insulator With Pin- 6Nos, 11 KV Pin Insulator With Pin- 42Nos, 11 KV Composite Pin Insulator- 231Nos, 11KV Composite Polymeric Disc Insulator- 64, 11 KV Disc Fitting Insu. 45 KN- 156Nos, 11 KV Disc Insulator With Pin -42Nos ...etc...from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 14 | Providing/Supply Material and making Complete Plinth of Transformer Size 2x2x1.5m with Material(Standard Size) at various site with all accessories complete in all respect as per respo Norms. |
| 15 | Providing/Supply Material and making Complete Wiremesh T/F Fencing 2.5 Mtr (26 R.M.T with MS Angle 35x35x5 MM) with MS agnle(Standard Size) at various site with all accessories complete in all respect as per respo Norms. |
| 16 | Safely placing of 100/250 kva 11/0.4 new T/F on the plinth/DP by the help of Crane/Chain Cuppie complete in all respect as per Respo Norms at various site. |
| 17 | Supply/Providing and Complete Errection Chemical Earthing(Standard Quality) of suitable for 100/250 KVA T/F at various site with all accessories complete in all respect as per respo Norms. (Chemical earthing Quality/sample will be provided to SE-EUDC-I, GZB for acceptance then GTP process and inspection.) |
| 18 | Erection of PCC Pole 8.5 Mtr Long at various site complete in all respect as per respo Norms. |
| 19 | Providing/Supply Material and making Conreting/Grouting of Pole at various site complete in all respect as per respo Norms. |
| 20 | Supply and Fixing/complete Erection of LT Tailless Unit 300/500/1000 Amp Complete Sturcture(Tailles Drawing will be provided by SE-EUDC-I, GZB) with AL. Bus Bar (2 /3Tailless Unit for each 100/250 KVA Transformer) including supply and errection with all accessories at various site complete in all respect as per RESPO norm. (Tailless Unit Drawing/Quality approved by SE- EUDC-1, GZB.) |
| 21 | Fixing/Erection/Filling and Complete Installation of Carriage Line material as per site requirement:- 11KV Jointing Kit 3x120 sqmm O/D-2Nos, 11KV Jointing Kit 3x120 sqmm I/D-2Nos, 11 KV JOINTING KIT 3*70 SQMM O/D-2Nos, 11 kv Fuse Set D/O-33Nos, 11 KV TPMO-17Nos, 11 KV Fuse Set-12Nos, Earth Rod With Set-4Nos, Stay Set Complete-6Nos, 11 KV TPMO Set-3Nos, LT Lead 1x25 sqmm-100mtr, 11 KV Composite Disc Insulator-96Nos, 11 KV Polly Disc Insulator with fitting-6Nos, 11 KV POLLY Pin Insulator With Pin-6Nos, 11 KV Pin Insulator With Pin-42Nos, 11 KV Composite Pin Insulator-231Nos, 11KV Composite Polymeric Disc Insulator-64, 11 KV Disc Fitting Insu. 45 KN-156Nos, 11 KV Disc Insulator With Pin -42Nos ...etc at various site complete in all respect as per respo Norms. |
| 22 | Laying, Lifting, sagging and providing proper termination/connection of LT Cable 1x240 sqmm at various site complete in all respect as per respo Norms. |
| 23 | Laying, Lifting, sagging and providing proper termination/connection of LT XLPE Cable 1x400 sqmm at various site complete in all respect as per respo Norms. |
| 24 | Cable Laying, Lifting, sagging of 11 KV XLPE Cable 3x70 sqmmat in Air at work site complete in all respect as per respo Norms. (350 Mtr in Air near Shani Mandir) Note:-The work shall be executed using the same available (balance) cable, and the entire cable shall be fully utilized as per site requirements during execution. |
| 25 | Laying, Lifting, sagging, Jumpering and providing proper connection of ACSR weasel Conductorat various site complete in all respect as per respo Norms. |
| 26 | Cable Laying, Lifting, sagging of 11KV XLPE 120sqmm (As per Estimate if required in Air or Other work) at work site complete in all respect as per respo Norms. (Kavinagar-III) Note:-The work shall be executed using the same available (balance) cable, and the entire cable shall be fully utilized as per site requirements during execution. |
| 27 | Laying, Lifting, sagging, Jumpering and providing proper connection of ACSR Dog Conductor at various site complete in all respect as per respo Norms. |
| 28 | Laying, Lifting, sagging of LT ABC in different size(as per Estimate) at various site complete in all respect as per respo Norms. |
| 29 | Fixing/Erection and Complete Installation of of Distribution Box 3 Phaseat various site complete in all respect as per respo Norms. |
| 30 | Supply & Fixing/Erection/Installation Holding clamp for top channel TPMO, Fuse Set etc with Bolts and Nuts at various site complete in all respect as per respo Norms. |
| 31 | Supply & Fixing/Erection/Installation Dropper Channel at various site complete in all respect as per respo Norms. |
| 32 | Supply & Fixing/Erection/Installation Top Channel at various site complete in all respect as per respo Norms. |
| 33 | Supply & Fixing/Erection/Installation M.S Channel 100x50 mm for TF Base at various site complete in all respect as per respo Norms. |
| 34 | Supply & Fixing/Erection/Installation M.S Angle 65x65x6 at various site complete in all respect as per respo Norms. |
| 35 | Supply & Fixing/Erection/Installation ALLUMINIUM LUG 400sqmm at various site complete in all respect as per respo Norms. |
| 36 | Supply & Fixing/Erection/Installation ALLUMINIUM LUG 240sqmm at various site complete in all respect as per respo Norms. |
| 37 | Supply & Fixing/Erection/Installation Number Plate With Clamp at various site complete in all respect as per respo Norms. |
| 38 | Supply & Fixing/Erection/Installation Danger Board With Clamp at various site complete in all respect as per respo Norms. |
| 39 | Supply & Fixing/Erection/Installation EARTH WIRE CLAMPS WITH BOLTS AND NUTS at various site complete in all respect as per respo Norms. |
| 40 | Supply & Fixing/Erection/Installation Danger Board Barbed wire including Jumper at various site complete in all respect as per respo Norms. |
| 41 | Supply & Fixing/Erection/Installation All Lug Long Barrel of Size at various site complete in all respect as per respo Norms. |
| 42 | Supply & Fixing/Erection/Installation Nut & Bolt with Washer off size at various site complete in all respect as per respo Norms. |
| 43 | Supply & Fixing/Erection/Installation LT Busbar Copper 'L' Piece 50x225x10mm at various site complete in all respect as per respo Norms. |
| 44 | Supply & Fixing/Erection/Installation Stone Pad 300x300x75 at various site complete in all respect as per respo Norms. |
| 45 | Supply & Fixing/Erection/Installation LT Clamp With Nuts & Bolts of PCC Pole With Neutral at various site complete in all respect as per respo Norms. |
| 46 | Supply & Fixing/Erection/Installation Suspension Clamp at various site complete in all respect as per respo Norms. |
| 47 | Supply & Fixing/Erection/Installation Suspension Clamp with I Hook at various site complete in all respect as per respo Norms. |
| 48 | Supply & Fixing/Erection/Installation Pearcing Clamp at various site complete in all respect as per respo Norms. |
| 49 | Supply & Fixing/Erection/Installation LT Pearcing Connnector 95 sqmm at various site complete in all respect as per respo Norms. |
| 50 | Supply & Fixing/Erection/Installation LT Pearcing Connnector 120 sqmm at various site complete in all respect as per respo Norms. |
| 51 | Supply & Fixing/Erection/Installation Pearcing Connnector at various site complete in all respect as per respo Norms. |
| 52 | Supply & Fixing/Erection/Installation J Hook at various site complete in all respect as per respo Norms. |
| 53 | Supply & Fixing/Erection/Installation I Hook at various site complete in all respect as per respo Norms. |
| 54 | Supply & Fixing/Erection/Installation PG Clamp DOG TO DOG at various site complete in all respect as per respo Norms. |
| 55 | Supply & Fixing/Erection/Installation Distribution Box Holding Clamp at various site complete in all respect as per respo Norms. |
| 56 | Supply & Fixing/Erection/Installation Dead End Clamp at various site complete in all respect as per respo Norms. |
| 57 | Supply & Fixing/Erection/Installation Dead End Clamp with Eye Hook at various site complete in all respect as per respo Norms. |
| 58 | Supply & Fixing/Erection/Installation and providing proper termination/connection of Connecting Lead 1x16 sqmm at various site complete in all respect as per respo Norms. |
| 59 | Providing/Supply Material and making Conreting/Grouting of Pole at various site complete in all respect as per respo Norms. |
| 60 | All other remaining works shall be completed and energised the Line by contractor in all respect as per site requirement.(as per Estimate) Please Enable Macros to View BoQ information |