| 1 | Sweeping and Cleaning of roofs all levels/ plants roads and Shoulders complete with T&P as directed by Engineer in charge. Including all material, labour T&P etc. required for proper completion of work. Also includes disposal of waste material, malwa 50m from site | Sweeping and Cleaning of roofs all levels/ plants roads and Shoulders complete with T&P as directed by Engineer in charge. Including all material, labour T&P etc. required for proper completion of work. Also includes disposal of waste material, malwa 50m from site |
| 2 | Leveling dressing of road shoulders upto drain. complete with T&P as directed by Engineer in charge. Including all material, labour T&P etc. required for proper completion of work. Also includes disposal of waste material, malwa 50m from site. | Leveling dressing of road shoulders upto drain. complete with T&P as directed by Engineer in charge. Including all material, labour T&P etc. required for proper completion of work. Also includes disposal of waste material, malwa 50m from site. |
| 3 | Engaging JCB on hire bases including hire,fuel,driver,helper etc. complete. | Engaging JCB on hire bases including hire,fuel,driver,helper etc. complete. |
| 4 | Cleaning of jungle by cutting grass vegetations, bushes above ground level including removal of rubbish up to a distance of 50 M out side the periphery of area cleaned | Cleaning of jungle by cutting grass vegetations, bushes above ground level including removal of rubbish up to a distance of 50 M out side the periphery of area cleaned |
| 5 | Cartage of grass/malwa by tractor trally upto a distance of 2 km for all lifts from cleared area , including cost of all labour, T&P etc. such as loading unloading & cartage, tractor trally, driver, fuel required for proper completion of work. | Cartage of grass/malwa by tractor trally upto a distance of 2 km for all lifts from cleared area , including cost of all labour, T&P etc. such as loading unloading & cartage, tractor trally, driver, fuel required for proper completion of work. |
| 6 | Disposal of dead animal bodies beyond the 3KM distance and cleaning the ame area and spreading lime powder incliding its underground burying as per direction of engineer I/C by excavation , refilling of earth including supply of all labour, material, T&P etc required for proper completion of work. small Animalslike Cat,Dog etc. | Disposal of dead animal bodies beyond the 3KM distance and cleaning the ame area and spreading lime powder incliding its underground burying as per direction of engineer I/C by excavation , refilling of earth including supply of all labour, material, T&P etc required for proper completion of work. small Animalslike Cat,Dog etc. |
| 7 | Disposal of dead animal bodies beyond the 3KM distance and cleaning the ame area and spreading lime powder incliding its underground burying as per direction of engineer I/C by excavation , refilling of earth including supply of all labour, material, T&P etc required for proper completion of work. Big Animals likeCow,buffalow etc. | Disposal of dead animal bodies beyond the 3KM distance and cleaning the ame area and spreading lime powder incliding its underground burying as per direction of engineer I/C by excavation , refilling of earth including supply of all labour, material, T&P etc required for proper completion of work. Big Animals likeCow,buffalow etc. |
| 8 | Cleaning of choked CI pipe/MS pipe of dia 50 mm to 200 mm (via any means like cutiing of pockets and rewelding, insertion of iron rod) with cost of all materials,labours, T&P etc. required for propoer completion of work. | Cleaning of choked CI pipe/MS pipe of dia 50 mm to 200 mm (via any means like cutiing of pockets and rewelding, insertion of iron rod) with cost of all materials,labours, T&P etc. required for propoer completion of work. |
| 9 | Clearing of blocked road due to falling of trees/branches due to storm & rain. | Clearing of blocked road due to falling of trees/branches due to storm & rain. |