| 1 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping on the outside surface of tower. |
| 2 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate |
| 3 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. |
| 4 | Labour charges for removal of old earthing | Labour charges for removal of old earthing strip layed on the surface of lighthouse tower from top to bottom, lighting arrestor etc complete as required. |
| 5 | Transportation of earthing materials from Sri Vijayapuram to aerial bay by bus or boat or cargo vehicle. | Transportation of earthing materials from Sri Vijayapuram to aerial bay by busorboator cargo vehicle. |
| 6 | Transportation of earthing materials from aerial Bay to East Island Jetty including dinghi hire charges along with safety boat. | Transportation of earthing materials from aerial Bay to East Island Jetty including dinghi hire charges along with safety boat. |
| 7 | Labour charges for transportation of earthing materials from shore to lighthouse. | Labour charges for transportation of earthing materials from shore to lighthouse. |
| 8 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower. |
| 9 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate |
| 10 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. |
| 11 | Transportation of earthing materials from Sri Vijayapuram to aerial bay by busorboator cargo vehicle. | Transportation of earthing materials from Sri Vijayapuram to aerial bay by busorboator cargo vehicle. |
| 12 | Transportaion of earthing materials from aerial Bay to Ross Island Port Cornwallis including dinghi hire charges along with safety boat. | Transportaion of earthing materials from aerial Bay to Ross Island Port Cornwallis including dinghi hire charges along with safety boat. |
| 13 | Labour charges for transportation of earthing materials from shore to lighthouse. | Labour charges for transportation of earthing materials from shore to lighthouse. |
| 14 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower. |
| 15 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate |
| 16 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. |
| 17 | Transportation of earthing materials from Sri Vijayapuram to Mayabunder by busorboator cargo vehicle. | Transportation of earthing materials from Sri Vijayapuram to Mayabunder by busorboator cargo vehicle. |
| 18 | Transportation of earthing materials from Mayabunder to Aves Island including dinghi hire charges along with safety boat. | Transportation of earthing materials from Mayabunder to Aves Island including dinghi hire charges along with safety boat. |
| 19 | Labour charges for transportation of earthing materials from shore to lighthouse. | Labour charges for transportation of earthing materials from shore to lighthouse. |
| 20 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping on the outside surface of tower. |
| 21 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate. |
| 22 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. |
| 23 | Labour charges for removal of old earthing | Labour charges for removal of old earthing strip layed on the surface of lighthouse tower from top to bottom, lighting arrestor etc complete as required. |
| 24 | Transportation of earthing materials from Sri Vijayapuram to Sir huge Ross Island by hiring mechanized dinghi along with safety boat. | Transportation of earthing materials from Sri Vijayapuram to Sir huge Ross Island by hiring mechanized dinghi along with safety boat. |
| 25 | Labour charges for transportation of earthing materials from shore to lighthouse. | Labour charges for transportation of earthing materials from shore to lighthouse. |
| 26 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping on the outside surface of tower. |
| 27 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate. |
| 28 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. |
| 29 | Transportation of earthing materials from Sri Vijayapuram to North Bay Island by hiring mechanized dinghi along with safety boat. | Transportation of earthing materials from Sri Vijayapuram to North Bay Island by hiring mechanized dinghi along with safety boat. |
| 30 | Labour charges for transportation of earthing materials from shore to lighthouse. | Labour charges for transportation of earthing materials from shore to lighthouse. |
| 31 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower. |
| 32 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate |
| 33 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. |
| 34 | Transportation of earthing materials from Sri Vijayapuram to Chidiyatapu beach by cargo vehicle. | Transportation of earthing materials from Sri Vijayapuram to Chidiyatapu beach by cargo vehicle. |
| 35 | Labour charges for transportation of earthing materials from Chidiyatapu shore to lighthouse including etc. as required | Labour charges for transportation of earthing materials from Chidiyatapu shore to lighthouse including etc. as required |
| 36 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower. |
| 37 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate |
| 38 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. |
| 39 | Transportation of earthing materials from Sri Vijayapuram to North Cinque Island by hiring mechanized dinghi along with safety boat. | Transportation of earthing materials from Sri Vijayapuram to North Cinque Island by hiring mechanized dinghi along with safety boat. |
| 40 | Labour charges for transportation of earthing materials from shore to lighthouse. | Labour charges for transportation of earthing materials from shore to lighthouse. |
| 41 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower. |
| 42 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate |
| 43 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. |
| 44 | Transportation of earthing materials from Sri Vijayapuram to North Cinque Island by hiring mechanized dinghi along with safety boat. | Transportation of earthing materials from Sri Vijayapuram to North Cinque Island by hiring mechanized dinghi along with safety boat. |
| 45 | Transportation of earthing materials from shore to site including labour etc. | Transportation of earthing materials from shore to site including labour etc. |
| 46 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping on the outside surface of tower. |
| 47 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate |
| 48 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. |
| 49 | Labour charges for removal of old earthing | Labour charges for removal of old earthing strip layed on the surface of lighthouse tower from top to bottom, lighting arrestor etc complete as required. |
| 50 | Transportation of earthing materials from Sri Vijayapuram to Little Andaman Jetty by cargo vessel. | Transportation of earthing materials from Sri Vijayapuram to Little Andaman Jetty by cargo vessel. |
| 51 | Transportation of earthing materials from jetty to Lighthouse site including vehicle hire charges, labour etc. | Transportation of earthing materials from jetty to Lighthouse site including vehicle hire charges, labour etc. |
| 52 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping on the outside surface of tower. |
| 53 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate |
| 54 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. |
| 55 | Labour charges for removal of old earthing | Labour charges for removal of old earthing strip layed on the surface of lighthouse tower from top to bottom, lighting arrestor etc complete as required. |
| 56 | Transportation of earthing materials from Sri Vijayapuram to Car Nicobar Jetty by cargo vessel. | Transportation of earthing materials from Sri Vijayapuram to Car Nicobar Jetty by cargo vessel. |
| 57 | Transportation of earthing materials from jetty to Lighthouse site including vehicle hire charges, labour etc. | Transportation of earthing materials from jetty to Lighthouse site including vehicle hire charges, labour etc. |
| 58 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower. |
| 59 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate |
| 60 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. |
| 61 | Labour charges for removal of old earthing | Labour charges for removal of old earthing strip layed on the surface of lighthouse tower from top to bottom, lighting arrestor etc complete as required. |
| 62 | Transportation of earthing materials from Sri Vijayapuram to Katchal East Jetty by cargo vessel. | Transportation of earthing materials from Sri Vijayapuram to Katchal East Jetty by cargo vessel. |
| 63 | Transportation of earthing materials from jetty to site including vehicle hire charges, labour etc. | Transportation of earthing materials from jetty to site including vehicle hire charges, labour etc. |
| 64 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower. |
| 65 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate |
| 66 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. |
| 67 | Transportation of earthing materials from Sri Vijayapuram to Campbell Bay Jetty by cargo vessel. | Transportation of earthing materials from Sri Vijayapuram to Campbell Bay Jetty by cargo vessel. |
| 68 | Hiring of mechanized dinghy from Campbell Bay to Rosen point for transportation of men and materials etc. as required. | Hiring of mechanized dinghy from Campbell Bay to Rosen point for transportation of men and materials etc. as required. |
| 69 | Transportation of earthing materials from shore to site including labour etc. | Transportation of earthing materials from shore to site including labour etc. |
| 70 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower. |
| 71 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate. |
| 72 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. |
| 73 | Transportation of earthing materials from Sri Vijayapuram to Campbell Bay Jetty by cargo vessel. | Transportation of earthing materials from Sri Vijayapuram to Campbell Bay Jetty by cargo vessel. |
| 74 | Transportation of earthing materials from jetty to site including vehicle hire charges, labour etc. | Transportation of earthing materials from jetty to site including vehicle hire charges, labour etc. |
| 75 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping on the outside surface of tower. |
| 76 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. |
| 77 | Transportation of earthing materials from Sri Vijayapuram to Campbell Bay Jetty by cargo vessel. | Transportation of earthing materials from Sri Vijayapuram to Campbell Bay Jetty by cargo vessel. |
| 78 | Transportation of earthing materials from jetty to Lighthouse site including vehicle hire charges, labour etc. | Transportation of earthing materials from jetty to Lighthouse site including vehicle hire charges, labour etc. |