| 1 | [23.22.1.3]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.3. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. TRIPLE POLE MCCB 16 to 100 Amp, 25 KA [Through Rate] |
| 2 | [23.22.5.1]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.1. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 6 amp. to 32 amp Single Pole [Through Rate] |
| 3 | [23.22.5.8]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.8. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 40 amp to 63 amp. MCBs FOUR POLE [Through Rate] |
| 4 | [23.27.4]Supply and erection of Godrej Almirah typeM.S. pedestal made of 50 mm x 50 mm x 6 mm angle iron frame with 3.00 mm thick M.S. sheet covering including shutters with suitable hinges and locking arrangement with Godrej type handle including round bars . The top covering should have downward overhang of 75 mm on all sides of pedestal , having two sets of water proof ventilation holes of suitable size on the sides , at top and bottom , each set containing four Nos. holes to discharge the heat produced by the current . The shutters fixed with rubber gasket of superior quality and of suitable size to make it water proof . The pedestal duly painted both inside and outside with two coats of approved paint and primary coat and its legs are embeded upto the entire depth in 1:2:4 cement concrete block , projected 75 mm all around the pedestal and and 200 mm above the ground level including the cost of all labour and material required to complete the job in all respect upto the entire satisfaction of the Engineer-in-charge of the work:- 4. M.S. pedestal of size 900 mm wide , 1500 mm high , 450 mm deep and bottom totally open , duly embeded in cement concrete block of size 1050 mm x 600 mm x 200 mm above ground level ,having a base of size 1200 mm x 750 mm x 250 mm below ground level . 0 0 [Through Rate] |
| 5 | [24.1.1]EARTHING AND LIGHTENING ARRESTOR 1. Earthing with GL earth pipe 4.5 m long and 40 mm dia with masonry enclosures on the top etc. (but without charcoal or coke and salt) as required. [Through Rate] |
| 6 | [24.1.13]EARTHING AND LIGHTENING ARRESTOR 13. Providing and fixing 4.00 mm dia G1. Wire on surface or in recess for loop earthing as required. [Through Rate] |
| 7 | [24.1.2]EARTHING AND LIGHTENING ARRESTOR 2. Extra for using salt and char coal/coke for pipe earth electrode as required. [Through Rate] |
| 8 | [24.1.8]EARTHING AND LIGHTENING ARRESTOR 8. Providing and fixing 25 mm x 3mm G.I. strip on surface or in recess for connections etc. as required with all labour and material. [Through Rate] |
| 9 | [24.13.24]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE LOOSE IN EXISTING PIPE OR TRENCHES COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 24. 16 Sq mm 4 core (Arm.) [Through Rate] |
| 10 | [24.13.32]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE LOOSE IN EXISTING PIPE OR TRENCHES COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 32. 25 Sq mm 4 core (Arm.) [Through Rate] |
| 11 | [24.2.8.4]LT CABLE 8.4. Supply and erection of aluminium lugs heavy duty including crimping etc. up to the entire satisfaction of the Engineer-in-charge of the work. 16 sqmm [Through Rate] |
| 12 | [24.2.8.6]LT CABLE 8.6. Supply and erection of aluminium lugs heavy duty including crimping etc. up to the entire satisfaction of the Engineer-in-charge of the work. 35 sqmm [Through Rate] |
| 13 | [24.2.8.9]LT CABLE 8.9. Supply and erection of aluminium lugs heavy duty including crimping etc. up to the entire satisfaction of the Engineer-in-charge of the work. 95 sqmm [Through Rate] |
| 14 | [24.4.3]STREET LIGHT 3. Supply and erection of 32mm dia metre 1.5 m long bracket (B-class) making an angle of 10° to 15° with horizontal plane for mounting street light fitting fixing of GI. bracket on wall with 2 nos. 32 mm x 3 mm thick M.S. clamps including cost of cutting, welding of G.I. pipe complete with cement sand mixture, bolts and nuts etc. including necessary connections. [Through Rate] |
| 15 | [24.4.8.5]STREET LIGHT 8.5. Supply and erection of Hot Dip Galvanized octagonal pole of 3mm thickness, with base plate including cost of nut and bolts , earthing studs, Integral Cable termination arrangement 5 mm thick Bakelite base plate on suitable welded MS/GI bracket 32 A four way connector 2 no 10 A SP MCB , end cover and all accessories as supplied by the manufacture including Providing RCC foundation of M25 grade (1 Cement:1 Stone aggregate: 2 Coarse sand) i/c excavation, steel reinforcement (Fe 500) @80 kg/cum of concrete contents, concrete cover 50mm, anchor bolts etc. over a bed of PCC 1:5:10 of required dimensions for octagonal poles of various heights as per following specifications complete in all respects and as per directions of Engineer-in-charge 7 Metre Long pole with top dia 75 0mm and bottom dia 150 mm with base plate of size 300 x 300 x 20 mm [Through Rate] |
| 16 | [24.5.2.3]MISCELLANEOUS ITEMS 2.3. S/E mark double walled corrugated (DWC) HDPE, pipe 10 Kg/Cm2 ,laid 0.75 Metre below ground level including digging and refilling of earth including cost of suitable size socket/coupler for HDPE pipe including the cost of labour and material required to complete the job in all respect up to the entire satisfaction of Engineer in charge of the work. DWC/HDPE pipe 63/50 mm outer dia/inner dia [Through Rate] |
| 17 | [24.5.2.4]MISCELLANEOUS ITEMS 2.4. S/E mark double walled corrugated (DWC) HDPE, pipe 10 Kg/Cm2 ,laid 0.75 Metre below ground level including digging and refilling of earth including cost of suitable size socket/coupler for HDPE pipe including the cost of labour and material required to complete the job in all respect up to the entire satisfaction of Engineer in charge of the work. DWC/HDPE pipe 90/75 mm outer dia/inner dia [Through Rate] |
| 18 | [36.8.6]Providing, laying, testing and commissioning of `B` class medium duty G.I. pipe conforming to IS 1239 including welding, fittings like elbows, tees, flanges, tapers, nuts, bolts, gaskets etc. and fixing the pipe on the wall/ceilingwith suitable clamp/support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required: 6. 80 mm dia [THROUGH RATE] |
| 19 | Supplying, installation, Testing and Commissioning of Street light LED fixture powder coated pressure die cast aluminum body with driver as per the requirement with Driver efficiency )85%, Input voltage: 140-270 Volt AC, freq 50/60 hz, Operating temp range -15 deg to 50 deg centigrade, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5, Driver efficiency )85%,THD ( 10% as per IEC 61000-3-2 , P. F.=0.95, IP- 66,IK-10, CRI )80, under voltage and over voltage protection, EMI- EMC As per CISPR -15, lenses for beam angle as per IESNA type I/II/III as per the width of the road and the project requirement., suitable to fit in up to 65mm dia pipe, life time (LED,Driver and electrical circuitry) of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ends as per LM80 extrapolation IES TM-21-11 report, CCT 3000°K / 4000°K / 5700°K /6000°K/6500°K (As per ANSI Bin), SDCM (Standard Deviation Color Matching) (5, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard complete in all respect i/c connections with 1.5 sq mm FRLS, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy =105 (120 lm/Watt output . LM79 and LM80 Test report from NABL lab for all testing required for LED fixtures as per BIS shall be submitted. Shape size and CCT shall be as approved by Engineer-in-Charge as per requirement. (Thermal management: heat sink of aluminum housing such that LED junction temperature shall not rise above 90°C).72 watt (HSR 23.28.12.13) |
| 20 | Supplying, Installation, Testing and commissioning of Astronomical time switch of following configuration to be mounted in feeder pillars / Lighting DBs for automatic switching On and OFF of street lights at sun set and sun rise or twilight(Auto ON, Auto OFF, Auto modes) with manual override facility with 12/24 hour display format with suitable battery and indication for relay status i/c programming at site complete as required. 1 output per phase and suitable for single phase supply (DSR 7.4.1) |
| 21 | Supplying, Installation, Testing and commissioning of Astronomical time switch of following configuration to be mounted in feeder pillars / Lighting DBs for automatic switching On and OFF of street lights at sun set and sun rise or twilight(Auto ON, Auto OFF, Auto modes) with manual override facility with 12/24 hour display format with suitable battery and indication for relay status i/c programming at site complete as required.3 output(1output per phase) and suitable for three phase supply (DSR 7.4.3) |
| 22 | Supply and erection of Four Arm bracket for 7 / 9 mtr. pole complete with in all respect. Please Enable Macros to View BoQ information |