| 1 | Hydrostatic Testing of Fire Extinguishers : |
| 2 | Hydrostatic testing of fire extinguishers shall be carried out. The scope includes collection, safe transportation, complete discharge of the extinguisher, dismantling, internal inspection, hydrostatic pressure testing using calibrated equipment, drying, reassembly, and affixing of test certificate/tag indicating date of testing and next due date.Any cylinder found defective, leaking, or failing the pressure test shall be rejected and replaced only after approval of the Engineer-in-Charge. All tools, equipment, and safety precautions shall be the responsibility of the contractor. |
| 3 | Annual Maintenance of Fire Extinguishers for the period of three (3) years : |
| 4 | Annual Maintenance Contract (AMC) for the existing fire extinguishers installed at CSIR-IICB, Jadavpr and Salt Lake campus for the period of three (3) years. The work shall include periodic inspection, checking of pressure, seals, hoses, nozzles, safety pins, and overall condition of the extinguishers.The contractor shall carry out quarterly inspections and maintain proper service records/logbooks. Minor repairs, replacement of defective parts (excluding cylinder replacement), lubrication, and ensuring readiness of extinguishers at all times are included in the scope. Breakdown/emergency calls shall be attended as and when required basis.All servicing shall be carried out by trained personnel, and service tags/stickers indicating the date of service and next due date shall be affixed on each extinguisher. |
| 5 | Refilling of Fire Extinguishers (ABC powder, CO₂, Dry Powder, Water, Foam, Clean Agent etc.) [Existing 392 nos FE and additional 53 nos FE as & when require basis)]The scope includes collection, safe transportation, complete discharge, cleaning, refilling with specified quantity and type of extinguishing media, pressurization, leakage testing, and reinstallation at site. New safety seals and discharge hoses (if required) shall be provided.Each refilled extinguisher shall be properly labelled with details of refilling date, next due date, and agency name. Test certificates shall be submitted to the Engineer-in-Charge. |
| 6 | Refilling of ABC type (MAP 50% concentration (Mono Ammonium Phosphate (MAP)), powder-based fire extinguishers, including complete discharge of existing contents, internal cleaning, and removal of old chemical/powder.The work shall include thorough inspection/health check-up of the cylinder, valve, hose, and other components, and Refilling shall be done with approved quality MAP 50% ABC dry chemical powder conforming to relevant BIS standards.The item also includes supply of all necessary materials, accessories, nitrogen gas pressurization, sealing, and fixing of discharge hose (if required), complete in all respects. Proper service tags indicating date of refilling and next due date shall be affixed.The warranty of the refilled chemical/powder shall be for a minimum period of 03 (three) years from the date of refilling. |
| 7 | 1 Kg ABC type [Existing 40 nos FE and additional 4 nos FE (as & when require basis)] |
| 8 | 2 Kg ABC type [Existing 2 nos FE and additional 1 nos FE (as & when require basis)] |
| 9 | 4 Kg ABC type [Existing 86 nos FE and additional 9 nos FE (as & when require basis)] |
| 10 | 5 Kg ABC type [Existing 2 nos FE and additional 1 nos FE (as & when require basis)] |
| 11 | 6 Kg ABC type [Existing 120 nos FE and additional 12 nos FE (as & when require basis)] |
| 12 | 25 Kg ABC type [Existing 1 nos FE and additional 1 nos FE (as & when require basis)] |
| 13 | Refilling of CO₂ type fire extinguishers, including complete discharge of existing gas and internal inspection/cleaning of the cylinder.The work shall include thorough checking/health assessment of the cylinder, valve, discharge horn, siphon tube, and other components.Refilling shall be carried out with approved quality carbon dioxide (CO₂) gas conforming to relevant standards. The item includes supply and replacement of all necessary consumables and accessories such as washers, O-rings, safety seals, and valve components, wherever required.The extinguisher shall be properly reassembled, pressurized, and tested for leakage. Service labels/tags indicating the date of refilling and next due date shall be affixed, and necessary test/refilling certificates shall be submitted to the Engineer-in-Charge.Nothing extra shall be paid on this account, and the rate shall be inclusive of all labour, materials, tools, and transportation, complete in all respects. |
| 14 | 4 Kg CO2 type [Existing 1 nos FE and additional 1 nos FE (as & when require basis)] |
| 15 | 4.5 Kg CO2 type [Existing 22 nos FE and additional 3 nos FE (as & when require basis)] |
| 16 | 6.5 Kg CO2 type [Existing 11 nos FE and additional 2 nos FE (as & when require basis)] |
| 17 | 9 Kg CO2 type [Existing 4 nos FE and additional 1 nos FE (as & when require basis)] |
| 18 | 9 Ltr CO2 type [Existing 3 nos FE and additional 1 nos FE (as & when require basis)] |
| 19 | Refilling shall be carried out with approved quality dry chemical powder. The item includes supply of all necessary materials, nitrogen gas pressurization, replacement of defective parts such as washers, O-rings, safety seals, hose, etc., wherever required.The extinguisher shall be properly reassembled, pressurized, and tested for leakage. Service tags/labels indicating the date of refilling and next due date shall be affixed, and necessary test/refilling certificates shall be submitted to the Engineer-in-Charge.The warranty of the refilled chemical/powder shall be for a minimum period of 03 (three) years .Nothing extra shall be paid on this account, and the rate shall be inclusive of all labour, materials, tools, and transportation, complete in all respects. |
| 20 | 4 Kg DCP type [Existing 5 nos FE and additional 1 nos FE (as & when require basis)] |
| 21 | 5 Kg DCP type [Existing 3 nos FE and additional 1 nos FE (as & when require basis)] |
| 22 | 6 Kg DCP type [Existing 11 nos FE and additional 2 nos FE (as & when require basis)] |
| 23 | 9 Kg DCP type [Existing 5 nos FE and additional 1 nos FE (as & when require basis)] |
| 24 | 25 Kg DCP type [Existing 7 nos FE and additional 1 nos FE (as & when require basis)] |
| 25 | Refilling of Foam type fire extinguishers, including complete discharge of existing contents, removal of old chemical solution, and thorough internal cleaning of the cylinder.The work shall include detailed inspection/health check-up of the cylinder, valve assembly, hose, nozzle, and other components.Refilling shall be carried out using approved quality foam concentrate and water in the required proportion. The item includes supply of all necessary chemicals, nitrogen gas cartridges/pressurization (wherever applicable), and replacement of defective parts such as washers, O-rings, seals, hose, etc., as required.The extinguisher shall be properly reassembled, charged, and tested for leakage and performance. Service tags/labels indicating the date of refilling and next due date shall be affixed, and necessary test/refilling certificates shall be submitted to the Engineer-in-Charge.The warranty of the refilled chemical shall be for a minimum period of 03 (three) years.Nothing extra shall be paid on this account, and the rate shall be inclusive of all labour, materials, tools, and transportation, complete in all respects. |
| 26 | 9 ltr Foam type[Existing 20 nos FE and additional 2 nos FE (as & when require basis)] |
| 27 | 9 Kg Foam type [Existing 1 nos FE and additional 1 nos FE (as & when require basis)] |
| 28 | Refilling of Water type fire extinguishers, including complete discharge of existing contents, removal of old water and CO₂ gas, and thorough internal cleaning of the cylinder.The work shall include detailed inspection/health check-up of the cylinder, head assembly, discharge hose/nozzle.Refilling shall be carried out with clean potable water and charging with CO₂ gas cartridge/pressurization system as required. The item includes supply of all necessary materials, replacement of defective parts such as washers, O-rings, safety seals, hose, etc., wherever required.The extinguisher shall be properly reassembled, charged, and tested for leakage and proper discharge. Service tags/labels indicating the date of refilling and next due date shall be affixed, and necessary test/refilling certificates shall be submitted to the Engineer-in-Charge.Nothing extra shall be paid on this account, and the rate shall be inclusive of all labour, materials, tools, and transportation, complete in all respects. |
| 29 | 9 Ltr Water Type [Existing 26 nos FE and additional 3 nos FE (as & when require basis)] |
| 30 | Refilling of Clean Agent type fire extinguishers, including complete discharge of existing clean agent and thorough internal cleaning of the cylinder.The work shall include detailed inspection/health check-up of the cylinder, valve assembly, discharge hose/nozzle, and other components.Refilling shall be carried out with approved quality clean agent conforming to relevant standards. The item includes supply of all necessary clean agent, pressurization with dry nitrogen (wherever applicable), and replacement of defective components such as washers, O-rings, seals, valve parts, etc., as required.The extinguisher shall be properly reassembled, charged, and tested for leakage and performance. Service tags/labels indicating the date of refilling and next due date shall be affixed, and necessary test/refilling certificates shall be submitted to the Engineer-in-Charge.Nothing extra shall be paid on this account, and the rate shall be inclusive of all labour, materials, tools, and transportation, complete in all respects. |
| 31 | 6 Kg type [Existing 18 nos FE and additional 2 nos FE (as & when require basis)] |
| 32 | Refilling of Halon type fire extinguishers, including complete discharge of existing contents and internal cleaning of the cylinder.The work shall include detailed inspection/health check-up of the cylinder, valve assembly, discharge hose/nozzle.Refilling, if permitted, shall be carried out only with approved and authorized clean agent as per prevailing environmental regulations guidelines.The item includes supply of necessary clean agent, pressurization (wherever applicable), replacement of defective components such as washers, O-rings, seals, etc., and complete reassembly, testing, and commissioning.Service tags/labels indicating the date of servicing and next due date shall be affixed, and necessary test/refilling certificates shall be submitted to the Engineer-in-Charge.Nothing extra shall be paid on this account, and the rate shall be inclusive of all labour, materials, tools, and transportation, complete in all respects. |
| 33 | 1 Kg HALON type [Existing 1 nos FE and additional 1 nos FE (as & when require basis)] |
| 34 | Refilling of Halotron type (clean agent) fire extinguishers, including complete discharge of existing clean agent and thorough internal cleaning of the cylinder.The work shall include detailed inspection/health check-up of the cylinder, valve assembly, discharge hose/nozzle, and other components.Refilling shall be carried out with approved quality Halotron clean agent conforming to relevant standards. The item includes supply of all necessary clean agent, pressurization with dry nitrogen (wherever applicable), and replacement of defective components such as washers, O-rings, seals, valve parts, etc., as required.The extinguisher shall be properly reassembled, charged, and tested for leakage and performance. Service tags/labels indicating the date of refilling and next due date shall be affixed, and necessary test/refilling certificates shall be submitted to the Engineer-in-Charge.Nothing extra shall be paid on this account, and the rate shall be inclusive of all labour, materials, tools, and transportation, complete in all respects. |
| 35 | 6 kg Halotron type [Existing 1 nos FE and additional 1 nos FE (as & when require basis)] |
| 36 | 9 ltr Halotron type[Existing 2 nos FE and additional 1 nos FE (as & when require basis)] |
| 37 | Training Programme (As and When required basis) : Providing and conducting training programme on the use and operation of fire extinguishers for staff/occupants at site, including demonstration of different types of fire extinguishers (ABC, CO₂, etc.), fire safety precautions, and handling of fire emergencies.The scope shall include arrangement of all necessary training materials (except fire extinguishers) for demonstration, safety equipment, and deployment of qualified/trained personnel. The programme shall be conducted at site at a mutually agreed time, complete in all respects, as directed by the Engineer-in-Charge. |
| 38 | Training Programme (As and When required basis) : Conducting Evacuation Training and Mock Drill and Fire Safety Awareness Programme for staff/occupants at site, including identification of fire hazards, alarm systems, emergency response procedures, and safe evacuation methods.The programme shall include practical demonstration of evacuation routes, assembly points, and coordination during emergency situations. Mock evacuation drill shall be conducted as per site requirement.The contractor shall provide all necessary training materials ( except fire extinguishers), safety equipment, and services of trained fire safety professionals/instructors. The training shall be conducted at site as directed by the Engineer-in-Charge.Certificate of training/participation and report of mock drill shall be submitted after completion. Please Enable Macros to View BoQ information |