| 1 | Construction of Multipurpose Building Hall for Antonyarpuram in Maravanmadam Panchayat |
| 2 | Earthwork excavation and depsoiting on banks with an initial lead and lift in Hard soil etc, complte as per SS20B for foundation. |
| 3 | Collection and supply of M.Sand and filling into the foundation and basement including cost and conveyance of sand and labour charges etc, complete |
| 4 | Cement Concrete 1:4:8 mix, using 40mm ISS, HBG metal including cost and conveyance of materals and labour charges for laying, compacting, curing etc, complete. |
| 5 | Supply and erection of centering for sides and soffits of concrete works inclduing cost and conveyance of materials and labour charges etc, complete. |
| 6 | ABOVE GL |
| 7 | Supply and fabrication of steel including cost and conveyance of steel and labour charges for cutting, bending and placing in position etc, complete |
| 8 | RCC 1:1.5:3 mix, using 20mm ISS, HBG metal including cost and conveyance of material and labour charges for laying, compacting, curing etc, complete. |
| 9 | Brickwork in CM 1:5 mix, using country bricks including cost and conveyance of materials and labour charges etc, complete |
| 10 | Collection and supply of gravel and filling into the foundation and basement including cost and conveyance of sand and labour charges etc, complete |
| 11 | Weathering course with best quality broken brick jelly of 20mm size in pure slaked lime over RCC roof slab etc, complete. |
| 12 | Finishing the top of roof with one couse of pressed tiles 23x23x2cm laid in cm 1:3 mix, etc, complete |
| 13 | Paving the floor with Vitrified tiles laid in cm etc, complete |
| 14 | Supply and applying wall putty 3mm thick over the RCC surface |
| 15 | Supply, delivery and fixing of UPVC door etc, complete |
| 16 | Supply, delivery and fixing of UPVC window etc, complete |
| 17 | Supply, delivery and fixing of UPVC Ventilator etc, complete |
| 18 | Plastering with cm 1:5 mix, 12mm thiick including cost and conveyance of materials and labour charges etc, complete |
| 19 | Emulsion painting two coats with approved colour and quality over one coat of primer including cost and conveyance of materials and labour charges etc, complete |
| 20 | Painting two coats for steel doors and windows with ready mixed enamel paint including cost and conveyance of materials and labour charges etc, complete |
| 21 | Provision for Electrical Arrangements |
| 22 | Wiring with 2 x 1.5 sq.mm. PVC insulated SC unsheathed FRLS copper conductor of 1100V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with TW switch box and 5A FT switch with painting of suitable colour for open PVC light point / fan point (for electronic regulator) (6 points per coil) |
| 23 | Supply and fixing of 1200mm (48\\") AC ceiling fan complete with stepped electronic 300W regulator with 300mm down rod on the existing clamp |
| 24 | Supply and fixing of single box type 4'40W fluorescent fitting complete with copper choke and condensor with TW round blocks on wall or ceiling with flu tube with PVC unsheathed FRLS copper leads from terminals to the fitting |
| 25 | Supply and fixing of fancy glass shade and 15 W LED Bulb |
| 26 | Wiring 2 x 1.5 sq.mm (22/0.30)PVC insulated unsheathed SC.cu. conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with TW switch box with in flush with wall covered with hylem sheet of 3 mm thick with painting of suitable colour for concealed PVC plug point (SD No.38) 5 pin plug point |
| 27 | Supply and run of 2 of 1.50 Sq.mm polythene insulated PVC sheathed heavy duty SC Copper conductor of 1100 V grade on 7/20 GI bearer wire for service connection mains (SD No.64) |
| 28 | Supply and run of 2x4 sqmm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V grade in 25mm dia GI pipe (Class 'B') suitably bent at both ends with necessary angle iron upright and end supports for mains SD 70 |
| 29 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |