|
| 1 | Part A : SITC of Different Hardwares and SoftwaresSupplying and installation of Bio metric Reader with Finger Prints; RFID card option, with 1.5 GHz quad core processor or higher, having ethernet connectivity & PoE feature (As per attached technical specification) as per direction & satisfaction of EIC.(Technical Specification as per Annexure -I) |
| 2 | OEM Control Software for Biometric Readers Dongle based with license maximum supported readers - 512 as per annexure attached (including 3 years comprehensive AMC)(Technical Specification as per Annexure -II) |
| 3 | Supply, installation,testing , commissioning of rack server with Intel Xenon silver dual CPU, clock frequency 3 GHz, dual hot swapable power supply, 12 core, RAID5,2TB SSD x 4, 16GB RAM x 4, OS windows server 2022 as per technical specification or equivalent specification compatible to associate hardware and software subjected to approval and satisfaction of EIC. Make: HP/ Dell(Technical Specification as per Annexure -III) |
| 4 | Supplying and installation of Cisco SF300-24PP 24-Port 10/100 PoE Managed Switch with Gigabit Uplinks or equivalent as per direction of EIC |
| 5 | Supplying and installation of Honeywell CCTV Camera HIE2PI Performance Lite IP IR Camera 2MP Dome Night Vision. or equivalent as per direction of EIC |
| 6 | Supplying and installation of Firewell MikroTik Router BOARD 1100AHx4 Dude Edition with 13 Gigabit Ethernet Ports, RS232 Serial Port and Dual Redundant Power Supplies RB1100AHx4 or equivalent as per direction of EIC |
| 7 | Supplying and installation of APC Back-UPS BX1100C-IN 1100VA / 660W, 230V, UPS System or equivalent as per direction of EIC |
| 8 | Contactless smartcard with photograph and details printed with cardholder & Lanyard. |
| 9 | D-Link Cat 6 Networking Cable for Router UTP Outdoor |
| 10 | Supply of SMPS for controller (APC - AMC2-4WCF), make : APC or equivalent as per direction of EIC |
| 11 | SITC of 4TB HDD |
| 12 | SITC of Bosch Controller apc-amc2-4wcf |
| 13 | AMC for customized TAMs application software (ver : angular ver 10) for 03 (three) year |
| 14 | Part B : Providing Manpower For operation & maintenance of BASProviding proper Technical Man Power for operating PC, server, Attenadnce monitoring server, all software related to BAS maintain and handling, creation of fingerprint enrolement, data handling for BAS/ New Id creation for new staff, report generation printing of card and changing of card for transfer, designation change or loss of card etc. and change of office/ DDO and system software upgradation. The following nos of manpower to be supplied in all working days through out the period.i) 1 No System Administrator & 1 No SSP for Jalasampad Bhawanii)15 Nos SSP for other regional site/ office locations |
| 15 | For 1st Year of AMC period (from 01.04.2025 to 31.03.2026) Please Enable Macros to View BoQ information |