|
| 1 | Laying and Jointing PVC Pipe. Heading | Laying and Jointing PVC Pipe. Heading |
| 2 | over hauling of operating mechansim | over hauling of operating mechansim |
| 3 | over hauling of troly and calibration of contact of interrupter | over hauling of troly and calibration of contact of interrupter |
| 4 | Attending Fault occurred in mechanism regarding operation of tripping along with the seting aligment trolley with panel | Attending Fault occurred in mechanism regarding operation of tripping along with the seting aligment trolley with panel |
| 5 | Replacement of complete tripping system assembly (ProvidedBy Department) | Replacement of complete tripping system assembly (ProvidedBy Department) |
| 6 | Replacement of Rachit spring Manual charging of handle | Replacement of Rachit spring Manual charging of handle |
| 7 | Replacement of hoist screw withbrass nut | Replacement of hoist screw withbrass nut |
| 8 | Replacement of Gear set of charging to Mechanism (Provided By Department) | Replacement of Gear set of charging to Mechanism (Provided By Department) |
| 9 | Overhauling of Bus Bar including providing proper insulation using Empire H.T. Tape etc. | Overhauling of Bus Bar including providing proper insulation using Empire H.T. Tape etc. |
| 10 | Replacment of Bushing (Provided By Department) | Replacment of Bushing (Provided By Department) |
| 11 | Replacement of Spout (Provided By Department) | Replacement of Spout (Provided By Department) |
| 12 | Replacement of C.T. (Provided By Department) | Replacement of C.T. (Provided By Department) |
| 13 | Replacement of PT 11/6.65 KV/100 Volt (By Department) | Replacement of PT 11/6.65 KV/100 Volt (By Department) |
| 14 | Replacement of Clamp of Interrupter | Replacement of Clamp of Interrupter |
| 15 | Replacement of Vaccum Interrupter for 11 KV VCB, to different make in varios places (Vaccum Interrupter Provided by department) | Replacement of Vaccum Interrupter for 11 KV VCB, to different make in varios places (Vaccum Interrupter Provided by department) |
| 16 | Repairing of Relay incoming/Outgoing Panel | Repairing of Relay incoming/Outgoing Panel |
| 17 | Wiring of Panel | Wiring of Panel |
| 18 | Testing of VCB Complete | Testing of VCB Complete |