|
| 1 | Motor Annual maintenance |
| 2 | Repair & recondition works in 120HP capacity vertical turbine pumpsets including cost of all materials ( excluding bronze impeller, SS shaft, MScolumn pipe), Conveyance , labour charges for removing & re erection of vertical turbine pumpsets etc complete |
| 3 | Repair & recondition works in 120HP capacity vertical turbine motors including cost of all materials , Conveyance , labour charges for removing & re erection of vertical turbine motors etc complete |
| 4 | Attending repair , rectification & reconditioning of 500mm dia D/F butterfly valves including cost of all materials, conveyance , labour charges for removing & re erection of DI D/F butterfly valves |
| 5 | Attending repair , rectification & reconditioning of 900mm dia D/F butterfly valves including cost of all materials, conveyance , labour charges for removing & re erection of DI D/F butterfly valves |
| 6 | Attending repair , rectification & reconditioning of 500mm dia CI Non Return valves including cost of all materials, conveyance , labour charges for removing & re erection of CI non return valves |
| 7 | Attending repair , rectification & reconditioning of 900mm dia CI sluice valves including cost of all materials, conveyance , labour charges for removing & re erection of CI sluice / scour valves |
| 8 | Labour charges for repairing 120Hp soft starter , including tools rent etc |
| 9 | Hire charges for deploying earth moving machinery (JCB/Poclain) for earthwork including diesel, oil and labour charges etc. complete |
| 10 | Dewatering using 7.5Hp diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete. |
| 11 | Labour charges for attending the 900mm MS pipe leak, including cost of welding machine ,tools , plants & technician |
| 12 | Supply & delivery of 900mm MS pipe Please Enable Macros to View BoQ information |